1 scope
This technology is applicable to rated load
5000kg and below rated speed is 3M/s and the following types of Chinese-made
model traction lifts installed hanging and baseline installation work.
2 construction preparation
2.1 materials requirements:
2.1.1 wood template should be used, drying,
toughness, deformation of the wood. And on all sides planed, straight.
2.1.2 in accordance with different lifting
height, model cross section of not less than the values listed in the table 5-1.
Model cross section required in table 5-1
Lifting height (m) of the thickness (mm)
width (mm)
≤ 20
20~60
>60 40
50
60 80
100
100
Note: the dimensions called for in net
after processing dimensions.
2.1.3 cross section after processing is not
less than 100x100mm; wood (erecting a model), angles, M16 bolts, u-Staples,
nails, piano wire 8# wire and so on.
2.2 the main tools:
Hammer, hammer, level, square, steel ruler,
boxes, wire pendant, ink.
2.3 operating conditions:
2.3.1 in hoistway scaffolding is completed,
and in compliance with the construction and installation engineering scaffold
safety technology operating and installation drawings provided by the
Department.
2.3.2 1.5~1.7m under the scaffold platform
is the highest point in shaft roof, so that the stable model. Top four short
tubes for scaffolding risers the best. After the demolition of the short tube,
the remaining vertices should be at the top of the standpipe cow legs 500mm for
easy car installation (Figure 5-l).
2.3.3 scaffolding tube distance to 1.4~1.7m
is appropriate, for ease of installation, each office door bracket 200~400mm
should be set below first gear cross tube, should be installed between two
horizontal pipe first gear cross tube, easy to climb up and down, PU 2/3
scaffold, scaffold every step at least, staggered on each floor decking to
reduce fall risk (Figure 5-2A).
2.3.4 foot lever ends of pipe sticking out
150~200mm, with the 8# wire with tubes tied (Figure 5-2B).
2.3.5 scaffolding must check the security
technologies sector, after acceptance, can be used.
2.3.6 on-site construction, lighting must
conform to the national standards of the technical specification for temporary
electrical safety of construction site
Ask.
2.3.7 the layer must have good protective
gate at the entrance of the Office; and the entrance hall and each step on the
scaffold should be kept clean and free of debris.
2.3.8 the actual measured height, pit depth
shall be in conformity with drawings, and accounting for whether it can meet
the requirements of the more drive.
3 operational processes
3.1 process:
Setting templates → → measuring shaft, to
determine baseline model in place, hanging baseline
3.1.1 setting templates:
3.1.1.1 below the shaft roof 1.2m using
expansion bolts to firmly fixed on the angle iron levels and on the wall
(Figure 5-3).
3.1.1.2 panel of wall of brick walls,
should be well 1.1M about picking his holes horizontally under the roof,
stabilizing model wood support and end fixity (Figure 5-4).
3.1.1.3 sample pad real leveling bracket
wood end, the level of error cannot be greater than 3/1000.
3.1.2 measurement shaft to determine
standard line
3.1.2.1 root entrance hall two-wire
measurement shaft. NET open space between two lines.
3.1.2.2 when well results to determine the
baseline should pay attention to the problem:
A well installed parts on the car running
without prejudice, such as rope for velocity limiter, layers steel, limit
switches,
Middle box frame, and so on. Taking into
account the car door on track and sill and wall distance and wall distance must
be guaranteed in the car and running up and down its movement parts shaft
stationary components and structures within the net distance shall not be less
than 30mm.
B when determining car rail line, according
to the road height requirements, taking into account the installation location
has no problem.
Road height is calculated as follows
(Figure 5-5):
H=L-A-B-C
Type H--
L——
A——
B——
C--high road (left);
Car Center to the wall (left) distance;
Distance between car and inner surface of
the safety gear;
Safety gear and track surface distance
(3~4mm);
Rail height and thickness of gasket.
C the track centre line should be
considered when determining the width (including weight, the most prominent
parts) from the wall and the car should have a clearance of not less than 50mm.
D front and rear door (connecting door)
elevator shaft depth ≥ width of hoistway door sill X2+ hoistway door sill to sill depth
clearance X2+ the car and car. Borehole vertical and should take into account
the situation meets the installation requirements.
E the hoistway door sill position
determination, should be based on the measured line each bracket and the
distance of the line, after plans, should take care of most, we should take the
little tick or wall bracket and farthest from the wall sill after steady load,
its door on column and wall clearance is less than 30mm.
F for the Office building equipped with
marble door and decorative wall of the elevator, due to their construction in
the back, so when the door to the baseline is determined, except in accordance
with the aforementioned e consideration, would also like to refer to the
construction figure, taking into account the construction against the door and
decorative walls.
G on two or more side by side installation
should pay attention to the center of lift from the line with the building
plans, should be based on well construction on all door indicator, button box
position into account, so that its height is consistent and coordinated with
the building to ensure appearance.
H for multiple parallel lift when
determining a baseline, in addition to the things that should be noticed,
depending on the building and door construction size consideration should also
lift waiting width on either side of the Office, two elevator relatively
uniform at the door of the Office, to ensure that the elevator door
construction or civil marble door appearance requirements (Figure 5-6).
When I determine the baseline should also
review the room layout. Traction machines, beams, speed limiter, generators,
limit switches, layer and other electrical equipment layouts to be problem-free
maintenance is convenient, and make any necessary adjustments.
3.1.3 model in place, hung to the baseline:
3.1.3.1 prototype manufacturing (Figure
5-7). Model of wood should be planed on four sides, straight, according to
drawings and assembled with adhesive, and templates in place.
Benchmark perpendicular amounts to 10,
including:
Baseline 4 car guide
Baseline 4 heavy rail
Hall door sill Baseline 2
To simplify construction, hanging baseline
may also does not use the sample as a whole, instead of nailed wood directly on
the wooden Strip. Used materials but must meet section requirements.
3.1.3.2 regardless of used model method or
straight nail wood article method, first should according to 3rd. 1.2 article
requirements for overall consider Hou, determine out ladder well center line,
car van frame center line, on heavy center line (Figure 5-7), then determine
out the benchmark vertical of put line points, underlined Shi using fine
pencil, check correct, again review the on with line size whether equal,
deviation not should is greater than 0.3 m m. Model or on wooden sticks in the
horizontal plane shall not be greater than 3 m m.
3.1.3.3 in template, attach one end of wire
hanging a light object, order slowly down to the pit. Vertical line not in
contact with scaffolding or other objects, and not the wire knot.
3.1.3.4 the payoff point, saw or an electric
knife, vertical sawn or draw a v-shaped Groove, makes v-Groove point line, put
the line in, in case the baseline shift error, and indicate the name of this
line at the line, attaching the tail lines in nails put in prison (Figure 5-8).
3.1.3.5 line pits the back, replace the
line with line hanging objects, naturally vertical static. Journey of a high or
windy, lines not resting can put a bucket in the pits at the end of, the line
fell into water or oil, increase its swing resistance line to fall the rest as
soon as possible (Figure 5-9).
3.1.3.6 600~1000mm in the pit with wood
supports under the fixed model, baseline static fixed with u-shaped clamp will
line model wood, and then check the model of each payoff point on a fixed point
size, diagonal size there is no difference, sure is correct, the next step
(Figure 5-10).
4 quality criteria
4.1 project:
4.1.1 baseline dimensions must be in
accordance with the drawings, the line bias should not be greater than 0.3mm.
Inspection method: standard.
4.1.2 the baseline must be vertical.
Check: the hanging wire, and standards.
4.2 Basic project:
4.2.1 sample standard deviation shall not
be greater than 3/1000.
4.2.2 compound lifts, door Center distance
deviation must not exceed 20mm.
4.2.3 relative elevators, door center-line
deviation must not exceed 20mm.
5 finished product protection
5.1 the Office of fence to maintain good to
avoid subtracting non-staff members.
5.2 operations against falling objects and
avoid smashing a model.
5.3 when a job well, careful not to touch
the lines at the gate of the Office; well when operating in, particularly in
electricity and gas welding job, take care to the baseline.
6 quality problems to be noticed
6.1 when determining the car guide to the
baseline, both should first review the drawing size and full size are the same.
Inconsistencies should be based on physical size. And by related departments
and personnel.
6.2 prior to each job shall review a
baseline, verify that no shift, after contact with other objects, to be
homework.
6.3 in the tick within the sinking wall and
door floor display box, call boxes at the hole, clean the scaffold and timely
protection measures should be taken to prevent smashing a model.