Saturday, November 26, 2016

The classic 100 decorating experience

Plumbers
1 waterproof, waterproof coating is suitable for construction
2, waterproof project should do after construction completed and acceptance of concealed work
3, waterproof construction after the completion of 2 times to do water testing
4, bathroom waterproofing layer should be not less than 1.8 metres
5 corners, floor drain, Yin and Yang, pipe and other places a waterproof
6, floor drains and odor-resistant floor drain
7, hot and cold water pipes Zuo Re right cold
8 from the ground, water pipes and try not to go
9, protective layer of cold water pipes in the wall 1CM, hot water is 1.5CM, so Groove take it deep
10, with PPR is to consider stamped tile thickness, pipes will not show
11, just minutes to Cook, wash dishes for a long time, water must buy
12, taps and basin facilities, has not got a bad
13, toilet installation can not use cement, silica gel
14, toilet, faucet installation is completed to protect
15, to be considered when buying a toilet a toilet hole distance
16, under the washing machine is draining but also to be considered are the drainage.

17, best not to telephone in the bathroom, easy to damp
18, first consider the size of the mirror in the bathroom, or mirror lamp is easy to hold up
19, bathroom pipes are best left the manhole
20, power cannot be put in the same weak pipes
21, on the right and left zero-phase grounding
22, power outlet away from 300, switch 1.4 m
23, the switches do not install behind the door
Lot of 24, Jack should be good
25, 16A socket for high-power electrical appliances, such as toasters, etc
26, the cassettes must use good
27, the cassettes must and panel support, or you may install not
28, PVC tubes and wires wire cross sectional area of not more than 40% of wire cross section area
29, air conditioning in bedrooms not to bed
30, air conditioning tilt outward to be considered, otherwise rain will come in
31, lamp as far as possible take into account dual control
32, the bathroom had better install splash plugs
33, taking into account a socket on the balcony
34, wire ducts to horizontal even vertical, lined, and easy to use
35, common flues to install check valves
36, bought the appliances must be properly let workers watch instructions
37, instruction manual and warranty card information must stay good
Mason
38, cement has surpassed the factory can't be used for three months
39, the different varieties, the marking of cement should not mix
40, yellow sand must be used for River sand, with the mouth taste will know
41, wall and floor tiles to soak in water for two hours or more, the shade can be posted
42, wall and floor tiles rather than buy a few more, not less, or prone to chromatic aberration
43, on one of the walls cannot have two rows of non-integer brick
44, immediately after wiping seam clean the ceramic tile
Posted 45, ground marble (light), the back of the stone to do waterproofing
46, corner office would like to cut a 45-degree angle
47, to incline to a floor drain, or easy to water
48, wall tiles meet the pipe mouth shall take the form of cuts, it seemed to be the entire block of brick
49, marble on the ground should be dry-laid
50, be sure to stain-resistant, non-slip, not just to look good
51, matte ceramic tile cleaning
52, balconies and floor tiles should pay attention to drainage directions
Woodworking
To keel the best 53, use dryer larch
54, bought lumber sawed after drying
55, Carpenter's approach to playing the House line
56, color Panel must buy a paint brush and again to prevent dirty
57, the ceiling fan cannot be installed on the ceiling joist
58, color Panel construction in advance to pick color
59 hanging bar away from the wall, ceiling shall not be greater than 300
60, gypsum board to use countersunk head self tapping screws, Access Board 1~2MM and antirust treatment, not gun nails
61, the distance between the plasterboard nails cannot be greater than 200
62 3MM of joints, gypsum board and the wall in order to crack
63, drywall corner at the best angle to protect
64, wooden door at the head of paint
65, bathroom door bottom brush waterproofing
66, size of the door should be consistent
67, furniture, try not to let the wood do, do well
68, Cabinet try to buy whole, woodworking done bad, not design
In 69, the dimensions must be considered good, just more trouble to change the
70, make your own sliding door not to do dark orbit, no way after repairs
71, small bathroom door, do not open the door, place
72, not sure of the carpentry foreman and must communicate, do not let them cool
73, money in hand is the hard truth
74, with the baby, less glass
75, be sure to let workers watch the drawings
76, kitchen drawers are useful
77, floors smoothness of wood joist 5MM
78, paved floors 30 degrees or 45 degrees between the plate and the plate 2~3MM, joints staggered
79, 8~10MM gap between the floor and wall
80, floor length over 8M, taking into account the expansion joint
81, to minimize the use of MDF door
82, hinges and hardware must use good
83, bath placed on the wooden keel cannot be mounted directly on top of the crane
Painter
84, try not to water, dark paint in construction, or prone to chromatic aberration
85, drywall bandage seams to
86, on the wall there are gaps where really cool good
87, the original wall surface PuTTY best eradicated, or brush over glue cementing
88, try to buy well-known brands of paint, decoration recommended or recommended by the foreman of the company isn't famous as far as possible not to use
89, the weather is too wet, paint not brush
90, paint, paint Polish to dry completely after
91, down paint after construction must wait for the paint to dry before
92, metal surfaces of paint to do the anti-rust treatment
93, the weather is too cold, poor paint quality
94, doors, paint, use masking tape stuck hinges and locks
95, it's too hot, you want to pay attention to ventilation
96, while wallpaper, to brush on the wall clear
97, while wallpaper, to remove switches, socket panel
98, light, silky emulsion paint to a finish, and prone to chromatic aberration
99, the baseboard after installing Putty and latex paint to fill gap

100, frosted glass with newspaper to protect

Construction technology of terrazzo floor

1 scope
This technology is applicable to industrial and civil building ordinary senior terrazzo floor project.
2 construction preparation
2.1 materials and equipment:
2.1.1 cement: white or light colored terrazzo flooring, white cement should be used, and dark terrazzo flooring, use Portland cement and ordinary Portland cement and slag Portland cement, its label should not be smaller than No. 425. With the color of the surface layer should be used with a batch of cement.
2.1.2 mineral pigments: cement paint should be mixed in with light resistance, alkali mineral pigment, acid pigment shall be used. Its incorporation appropriate to the weight of cement 3%~6%, or fixed by the test. Same color plane layer should use the same plants, same batch of paint.
2.1.3 stone tablets: should be adopted hard grinding processing of dolomite and marble, rocks, and stones should be clean and free of debris, its size in addition to the special requirement, suitable for 4~14mm.
2.1.4
2.1.4.1 glass: flat glass make, 3mm, 10MM (according to the thickness of the surface layer), length depending on block size.
2.1.4.2 copper: l~2mm thick copper plate into 10MM (also according to the thickness of the surface layer), length depends on size, must be straightened before leveling.
2.1.5 sand: sand, 8mm aperture sieve sediment cannot be greater than 3%.
2.1.6 oxalate: bulk, powder, diluted with water before use.
2.1.7 ash and 22nd wire.
2.1.8 main machinery: terrazzo machines, rollers (diameter 200~250mm, CA 600~700mm, concrete or steel), wood trowel, brush, iron-pan, on foot, wheelbarrows, Spades, 5mm aperture dice, oilstone (specifications according to the coarse, medium and fine), rubber pipes, buckets, brooms, brushes, irons, etc.
2.2 operating conditions:
2.2.1 plastering of the ceiling and the wall has been completed and approved, and roof have done waterproofing layer.
2.2.2 install door frame and add protection associated with ground water, pipeline installation, Guan Dong has been blocked through the ground, blocking it.
2.2.3 finished cushion on the ground, grinding stones by the elevation layer thickness (at least 3cm).
2.2.4 sift the stone tablets, clean and free of debris.
3 operational processes
3.1 process:
Primary elevation play line laying screed mortar maintenance

Elastic grid line insert mixing slurry coat of terrazzo mix combine

Pu terrazzo try rolled, flattened mix grinding grinding grinding

Polish oxalic acid cleaning wax Polish
3.1.1 base treatment: clean debris on the concrete base, without oil, dirt. Steels for cold chisel and wire brush to touch slurry on chipping away at the grassroots level scoop NET.
3.1.2 elevations be found playing level: according to +50cm level line on the wall, measure down the terrazzo surface elevation, playing around on the wall, and other elevation of rooms and passages, to be consistent.
3.1.3 screed mortar:
3.1.3.1 wall pops up on the horizon, stepped thickness (about 10~15mm thick), 1:3 cement mortar screed, in order to ensure the smoothness of the screed, plaster cakes (spacing between vertical and horizontal directions, 1.5M), about the size of 8~10cm.
3.1.3.2 mortar after induration of ash cake, in a lime pie with a height of standard, vertical and horizontal bars of the width is 8~10cm.
3.1.3.3 on spraying water on the grass-roots moist, brush with water/cement ratio for 0.4~0.5 slurry, area not too big, with the brush pulp with Pu 1:3 screed mortar and 2m scraper bar to bar for the standard shave, rub wooden trowel flat.
3.1.4 maintenance: easy leveling mortar curing after 24h, compressive strength of up to l.2MPa, can be carried out the next working procedure construction.
3.1.5 elastic frame line: according to the design requirements of the grid size, the General lmxlm. In playing the cross in the middle of the room, calculate around the chrome width, elastic frame line is subject to cross. If the design pattern requirements, according to design requirements should be ejected clear lines.
3.1.6 set points grid article: with small iron wipe child wipe heavy water mud will points grid article fixed live (points grid article Ann in points grid line Shang), wipe into 30 ° eight glyphs (Figure 7-1), height should below points grid strips top 4~6mm, points grid article should straight (Shang flat must consistent), and firm, and joint closely, shall not has gap, as laying surface layer of logo. When you paste cells, cells cross the joints, in order to make the mixture filled full, do not wipe the grout in the intersection from 40~50mm (Figure 7-2).
When using copper should be drilling at the ends of lower 1/3 in advance, through the 22nd, wire, anchored in it took eight corner grout. After the Panel started after 12h water conservation, at least 2D, the room should be closed during this period, prohibit the process.
3.1.7 mixing terrazzo mix (or gravel, slurry):
3.1.7.1 volume ratio of the mixture should be used 1:1.5~1:2.5 (cement: stone tablets) requires accurate mix, mix evenly.
3.1.7.2 colored terrazzo mix, apart from the color stone tablets, also adding alkali-resistant mineral pigments, its admixture for cement 3%~6% weight, normal concrete mix proportion, color and pigment stones and common stones mix prior to construction will have to be determined by laboratory tests. Same color of terrazzo surface should use the same plants, same batch of paint. In front of the mixing should be according to the amount required for the entire ground, cement and the pigments required a uniform blending well and get enough distribution. Not only with a shovel mixing ingredients, also after using sieves, packing bags up and stored in a dry room, avoid moisture. Stone and ordinary stone grains mix evenly, centralized storage for later use.
3.1.7.3 mixture in water before use mix evenly, dispatching about 6cm.
3.1.8 painted cement bonding: screeds with water sprinkler wet painted same color as the surface layer of cement paste with layer, the water/cement ratio should be for 0.4~0.5, brush evenly, can also be added in the cement adhesive, to shop with the brush with mixture, not brush too large to prevent slurry layer dry lead layer hollowing.
3.1.9 laid terrazzo mix:
3.1.9.1 terrazzo surface layer thickness of mixing, in addition to special requirements should be 12~18mm, and shall be determined according to the stone size. Lay will stir the mixture filled with Pu edge, back into the grid box, propelled by iron trowel from the Center to the edge, special attention at the grid on both sides and the angle between the compact smooth, wipe with the speed checks using a ruler. Such as local ground laid too high, part metal trowel should be removed, then around the stone cement slurry squeezed smooth (no bumper scrape scraper).
3.1.9.2 water mixture of several colors cannot be covered, the first shop put on dark, back light, after the solidification of the former, then the latter (because dark colors mixed with mineral pigments, slow strength growth, impact mill).
3.1.10 rolled, flattened: with a roller hydraulic front, first with a touch of iron or wood trowel in the grid width of 10cm range and shoot it gently on both sides (avoid squeezing shift). Rolling hard and evenly (to keep clear off the stick to the drum gravel) from the horizontal rotation in both directions, reach the surface compacting and Grouting stone piece evenly. After stone tablets slightly water slurry, and then iron trowel mortar trowel, compacting, if uneven stone tablets, stone tablets syrup with iron supplementation should be anointed the Pat down, compacting. 24h water conservation.
3.1.11 trial grinding: General conservation days according to the temperature, temperature 2~3D at 20~30 to start the machine, open prematurely grinding stone particles easily loose; too late cause finishing difficulties. So you want to try grinding, is subject to surface not stone tablets.
3.1.12 rough mill: first again with 60~90, rough diamond mill, makes mill stone machine head in ground Shang go cross "8" glyphs, side mill side added water (as mill stone surface layer conservation time too long, can added sand, speed up machine mill speed), at any time cleaning cement pulp, and by feet check flat degrees, until surface mill flat, and mill uniform, points grid article and stone grain all show (corner at with artificial mill into also effect), water cleaning dry, then with more thick of cement pulp (as mixed has pigment of surface layer, Apply the same mixed with pigment mixture ratio of cement paste) rub it again, especially holes in small pores of the surface to fill smooth, shedding stone tablets should be completed. Water conservation 2~3D.
3.1.13 fine grinding: a second time by 90~120 diamond requiring grinding to smooth the surface. Then rinse with clean water, wipe the second cement, small pores to clean tight and meticulous, and conservation 2~3D.
3.1.14 polished: third time with No. 200, diamond grinding, grinding to stone on the surface to show even, perfect stone tablets, is flat and smooth, pore-free.
Ordinary terrazzo surface finishing times shall not be less than three times, senior terrazzo surface layer thickness and finishing times and the stone should be determined according to the design specifications.
3.1.15 oxalic acid scrub: to made waxing Hou significantly of effect, in playing wrong Qian mill stone surface layer to for once amount limits of pickling, General are with oxalic acid for scrub, using Shi, first water added oxalic acid of into about 10% concentration of solution, with broom dipped Hou sprinkled in ground Shang, again with oil stone gently mill a again; mill out cement and the stone grain color, again water flush soft cloth wipe dry. This operation must be carried out until after the completion of the various types, surface shall not be contaminated after pickling.
3.1.16 the wrong finish: wax wrapped in a thin cloth, a thin coating layer on the surface, dry nails with canvas or linen pieces of wood instead of stone, installed on the polishing machine grinding, call again in the same way the second time wax, until smooth and clean, bright, so far.
3.1.17 when winter construction of terrazzo flooring, ambient temperature + 5 ° c above should be maintained.
3.1.18 the terrazzo baseboards:
3.1.18.1 ash: plastering with wall thickness consistent set of square at the corner of yin and Yang, measuring tape, cable, determine the skirting thickness, according to the thickness of the bottom ash Chong tendons, spacing between l~1.5M. Then use dashes to scrape wood trowel into the pockmarked face and hair.
3.1.18.2 stone skirting mix: first the scratch coat wet with water, at the corner of yin and Yang and catchy, looking for a rule on foot on a horizontal line, stuck on foot plate, brush a thin layer of cement paste, followed by mixture, trowel, compacting. Gently brush to brush water twice to cement, to stone surface laitance free. Conservation at room temperature 24h, start artificial grinding.
First time used coarse stone, first vertical ground cross grinding, requires smooth gravel, Yin and Yang, corners rounded, clean the first pass effect of ash and pore filling density and conservation l~2D, and then with a fine oil stone again, using the same method of grinding out a third time, oils light oxalate stones, scrub clean with water.
3.1.18.3 artificial wax: clean light survived two more times.
4 quality criteria
4.1 project:
4.1.1 selected materials: variety, intensity (proportion) and colors, should comply with the design requirements and the provisions of the code.
4.1.2 combination of surface layer and the grass-roots level must be firmly, without hollowing, cracks and other defects.
4.2 Basic project:
4.2.1:
4.2.1.1 General terrazzo: smooth surface, no crack, trachoma and ground lines, dense stone tablets, revealing uniform designs meet the design requirements, the same color, mixed color, firm, clear and straight.
4.2.1.2 Advanced terrazzo: smooth surface, no crack, trachoma and texturing, dense stone tablets, revealing uniform, adjacent color to process color, firm, straight, clear, angular edges founder of yin and Yang.
4.2.2 baseboards:
4.2.2.1 normal terrazzo: consistent, uniform wall thickness, combined with the wall firmly, free local drum, but its length is less than 200mm, and check fan no more than 2.
4.2.2.2 Advanced terrazzo: smooth surface, combined with the wall firmly, wall thickness, it tastes good and straight.
4.2.3 staircase two steps and stairs adjacent to the width and height is less than 10MM, cord corners neat, slip straight.
4.2.4 the ground edge:
4.2.4.1 standard terrazzo: chrome material and dimension shall conform to the design and construction of the norms, neat smooth corners, adjacent to different surface colors do not mix.
4.2.4.2 Advanced terrazzo: correct size, stitching close, adjacent not blending, color line straight, neat and smooth, clear and beautiful corners.
4.2.5 quality of wax: wax spread uniform threadbare, consistent color, thickness, smooth and bright, clear, and clean the surface.
4.3 allowable deviation, as shown in table 7-6.
Terrazzo floor tolerance table 7-6

Tolerance (mm)
Normal high
Surface roughness of 3 2 2m m on foot and wedged feeler Gage check
Baseboard and catchy straight, 3 3 la 5M, less than 5M Latrun engineers check
Sew Geping straight 3 1 5M, less than 5M Latrun engineers check

5 finished product protection
5.1 when laying cement mortar screeds, taken not to touch the bad water, electrical lines and other equipment.
5.2 transport materials to protect well the door frame.
5.3 when grinding terrazzo surface, grinding of cement waste slurry should be cleared in a timely manner may not flow into the drain and drain to prevent jams.
5.4 mill stone set bezel and prevent spatters the walls and ground facilities, important parts and equipment should be covered.
6 quality problems to be noticed
6.1 points broke, revealing clear: mainly because of mosaic is not secure (or below the surface), hydraulic-do not use iron trowel before beating sides, drum roll in the process of being bent or crushed. To prevent this behavior from occurring, prior to rolling stones gently on both sides of it.
6.2 at the junction of four non-grain: the main bond article, heavy slurry should be glued into a 30 ° angle, leading cement 4~6mm, and Grand Junction, bonding paste may not be put to the Swiss head to remain a mixture of pores.
6.3 terrazzo surface layer has hole eye, and pore: terrazzo surface layer machine mill Hou total some hole hole occurred, General are with fill pulp method, that polished Hou with water rushed clean, with more thick of cement pulp (as color mill stone surface Shi, application with color pigment added cement wipe wipe) will hole eye wipe wipe dense, stay hardening Hou polished; General terrazzo surface layer with "II pulp three mill" method, that whole process polished three times wipe pulp two times. If hooking less wipe once, or sweeping with brooms rather wipe or slurry, are easy to cause the surface there is a small hole (due to cleaning the paste hardened polished, easy to wear holes in the mortar).
6.4 stone tablets are not uniform, not to reveal: the main stone specifications well, stone tablets are not cleaned, mixture with screed laying scrape usually buried the stone tablets in the mortar, causing uneven stone tablets and so on.
7 quality records
This standard shall meet the following quality records:
7.1 cement, stone factory certificate.

7.2 stone-surface engineering quality assessment data.

Window door practice

1, making the base material with 18 per cent core and 9 plates, window production base with 18 per cent core and 9 plates, door frame, window frame against the wall at the end of some light painting again, on either side if the door gap is greater than 2CM, then apply the cement mortar filling. Door installation, window frame lines prior to opening an expansion slot on the back, prevent variants, set line width 55MM, 8MM Windows, set line width 5CM. Thick 8MM.



2, and door sets grass-roots 15 PCT big core Board Xia material must sets material, grass-roots with dry wood playing wood wedge solid prison, away from to 5cM, prevent water dip, check flat degrees, and vertical degrees, flat degrees, and vertical degrees allows errors ± 1MM, diagonal allows errors ± 2MM, detection door above around angle to horizontal distance, all door sets should do height consistent, similar door width consistent, bedroom door General for 800X2000, kitchen, and Wei door General for 700X2000 or 650X2000, Door leaf thickness is 38MM-42MM (if you have other requirements designed).

3, if you have under Windows using the wooden keel frame plywood closed, with 15 per cent open-core 5CM wide plank, 20CM wide, with the original plastering layer of wall height difference is 15MM, old plaster layer knocks around under Windows 50MM, nail stencil plastering, plastering does not exceed the wall plastering layer (focus on).


4 door, window frame corner joints tight lines, wiring duct patency, texture, color change, gun nails in a line outside the rebate lines from 5MM. Door line for 0.8X5.5, window cover lines for 0.8X5.





5 door lateral spaces with the same solid lines close, does not allow use of veneer edges.

6, sliding door jamb location Groove at one corner, sliding doors with depth and clearance at the track to 60MM.

7, kitchen and toilet in addition to stainless steel door sets, decorative panels must be shut with a solid line.


(Ii), the door

Practice 1, hollow door: door leaf thickness of 42-43MM. 18MM wood panels open, standing around 2-3 circle, reinforcing bar spacing must not exceed 200MM, load lock location cannot be blank. Hinge reinforcement on both sides in the imported 5MM plate, decorative panels, place in the standard press flat for more than 7 days, each procedure must be coated with white LaTeX.






2 practices, solid door: door leaf thickness of 42-43MM, plywood, plywood on both sides out of the symmetrical balance gap, nailed plywood with white glue and a gun, and another Panel, put in the standard bed flat for more than 7 days. Moisture content should be between 8% and 12% before use should be polished, brush primer twice after use, gate when planing doors, main plane surfaced at the end of the height, the overhaul planing height of not more than 5, side planing both sides planed, overhaul plane is not more than 5MM on each side.

3, the door panel must be selected before use, primer on classification after reasonable packages and color scheme used, sealing plate using white LaTeX, mosquito nails, white latex coating evenly enough; Panel mosquito must use stainless steel nails, panel color, textures should be closely coordinated gap, non-injury, mosquito nailed focus before use check the nail hole size, adjust the nail gun.

4, and doors shut: wood shut, selected color using, repair side Shi, is strictly prohibited injury Panel, all door and the sets only allows in improper eye at has a at 0.5 square centimeters within of scars, wood line push light school flat rear can using, wood line and Panel seams closely, eye from 50CM should missing seams, allows little chromatic aberration, wood line diagonal at should wear pointed, 45 degrees diagonal.

5 door edge must be selected carefully to ensure

Front line texture, color balanced appearance, door edges shall be smooth polished back above primer before using 2 times, nailing lines must push light leveling after a small amount of glue on the back with 30 straight nails, more than 60 60 wide lines must be enclosed in double rows of nails.

6, and doors installation: doors and ground (surface layer height) distance 5-8MM, doors left, and right, and catchy clearance 1.5-2.5MM, doors and door block combined closely, gap ± 1MM, loaded doors involved frosted glass Shi, loaded good Hou should in light facial playing amount glass rubber protection glass, kitchen, and Wei with mill sand surface should to outside, and outdoor handover at mill sand surface should to within.

7, install the hinges must be double-sided slot in the door leaf and door frame, door opening with stainless steel self-tapping screws for hinge installation.

8, against the door installation, reliable, accurate, and on the magnet fixed on the baseboard, skirting around should be reinforced.

Height from the ground 900-1000MM 9, door installation, door locks, lock is correctly positioned and the lock bolt and the doors, gaps between the latch and the door frame should be tight and securely opened freely, lock is installed must be wrapped to protect to prevent contamination.

10, glass door to do solid framework.

11, inlay aluminum doors, protruding round corners.


12, before the completion, remove hinge and lock tape.

Friday, November 25, 2016

Installation technology of Interior radiator group and

1 scope
This technology is applicable to long-wing of grey cast iron, round aerofoil, columnar and M132 group with the installation of the heatsink, steel tube type and plate type, column type and string-type radiator installation works.
2 construction preparation
2.1 materials requirements:
2.1.1 radiator (iron and steel): radiator models, specifications, pressure to be used must comply with the design requirements and a factory certificate; radiators must not have trachoma, corresponding surface is uneven, inconsistent side, cracking and Center distance and so on. Wing-type radiator fins intact. Steel series of fins shall not loose, curly, touch damage. Steel radiator should be handsome in appearance, the correct thread, elastic, and paint in good condition, the entire set of furnace not Alice stared blankly.
2.1.2 Group on part of the radiator: silk, plugging the furnace, furnace repair, threaded round wing flange, elbow, bow, bend, staple, tees, elbows, bolts, nuts, and oil, the quality requirements, offset clasp, square buckle, FLOSS, fault-free buckle. Correct thread, elastic fit. Asbestos rubber gasket 1mm is appropriate (not more than 1.5mm), and in accordance with the working pressure requirements.
2.1.3 other materials: bar, pad, supporting hooks, fixed cards, expansion bolts, steel, cold, oil, lead, oil, twine, anti-rust paint and cement used should conform to the quality and specification requirements.
2.2 the main tools:
2.2.1 machines: bench drill, drill, drill, electric pressure test pump, sand wheel saws, pipe threader.
2.2.2 tools: cast iron radiator Group on shelves, on key cases, pressure, pipe wrench, iron brush, saw, hammer, wrench, sets screen Board, self-wrench, a chisel and a hacksaw, taps, simmering tubes, manual test pump, radiator, gas welding tools, transport vehicles and so on.
2.2.3 tools: spirit level, ruler, wire pendant, pressure gauge.
2.3 operating conditions:
2.3.1 group site has water and power supplies.
2.3.2 cast iron radiators, supporting hooks and clips have been rust clean and brush paint.
2.3.3 finished interior walls and floors.
2.3.4 Interior heating pipes, risers installed, connected to the radiator pipe reserved nozzle is correctly positioned, level met the requirements.
2.3.5 radiator installation and construction materials are allowed to stack or other obstacles.
3 operational processes
3.1 process:
Preparation groups tab → group → prefabrication and installation of the heatsink cooler single pressure test → →

Radiator installation installing → radiator cooling doors → painting the pipe system installation → test →

Sub-paragraph 3.2 Summary of construction drawing layers and specifications out radiator number of groups, the number of each group, used columns into a table so that the Group and the installation.
3.3 all kinds of cast iron column radiators group:
3.3.1 set for the former to be available with a radiator on the shelves or under radiators specifications with 100x100 wood lying on the ground, four iron wedge wood tied with a wire reinforced, made a temporary set.
3.3.2 group gasket with asbestos rubber gaskets, of a thickness not exceeding 1.5mm, oil-immersed.
3.3.3 dirt within the radiator NET, steel brushes except silk NET counterparts and rust, buckle up, turn the pieces.
3.3.4 group according to statistics the number of specifications, set before the radiator, do the thread selected test.
3.3.5 Group on Shi should two people a group pendulum good first tablets, twist Shang on silk a buckle, sets Shang asbestos rubber pad, will second tablets anti-buckle alignment on silk, find are Hou two people the with a hand-held live furnace tablets, another hand will on silk key insert on silk diameter, first to back slowly back, then again Shun turned, makes ends into buckle, while slowly balanced twist tight, as this by tablets Group on to by needed of tablets number weizhi.
3.3.6 radiators consisting of slowly up, transported to a centralized location by manual or car.
3.4 external bracing prefabrication and installation:
3.4.1 according to the number and length of the radiator, calculate the length of pull out, cut off 8~ φ φ 10 round steel and straightening, collecting caps well screwed on both ends, the nuts: good morning, after rust brush paint again.
3.4.2 20 and above the radiator and pull, on each pull end caps a ride codes from the radiator upper and lower ends of the outside column into four, a ride on the code Strip on each nut; straight after the Board screw down, exposed shall not be more than one of the threaded nut thickness.
3.5 radiator pressure test:
3.5.1 the radiator to the test stage, with box spanner and temporary heart stoppage of good temporary furnace, good gas nozzle, the joining pressure test pump gt radiator pressure test can be connected directly to the pump.
3.5.2 when pressure testing open the water inlet valve, heat sink filled with water, and opening the valve, exhaust air, water full close on gas nozzle.
3.5.3 when pressure to the pressure, close the water inlet valve for 5 minutes and see if each interface leakage no leakage is qualified.
3.5.4 as has leakage with pencil made mark, will water put do, remove furnace blocking or furnace fill heart, with long Rod key from radiator external competition, volume to leaking interface of length, in key Rod Shang do mark, will key from radiator on silk hole in the stretch into to mark at, by silk buckle spin tight of direction twist moving key, makes interface continues to tightened or remove for pad, as has bad tablets needed for tablets. Steel radiator if there is leakage welding of sand hole, returning to fix a hydraulic test until qualifying. Not bad will be clearly marked (or a clear holes with a hammer to smash bad stored separately) to prevent mistakenly set to mix well again.
3.5.5 opens the drain valve and remove temporary silk threads and temporary heart, leaking water radiator after transportation to a centralized location, repair welding to repair brush two antirust paint.
3.6 install the heat sink:
3.6.1 according to design requirements, using tables in different sizes, specifications and groups of well finished radiator pressure testing and delivered to the room, according to the installation position and height on the wall painting installation centre line.
3.6.2 supporting hooks and fixed card installation:
3.6.2.1 columnar legs heatsink installation. 3/4, draw a horizontal line to the radiator high from the ground, and the intersection of the centre line of the heatsink painting mark this 15 double radiator below the fixed location. Singular missed half a piece to one side. More than 16 tablets should be planted two fixed cards, height 3/4 height of the heatsink of the horizon, from the radiator at each end in 4~6 place into. Cylindrical radiator dimensions (Figure 1-12).
3.6.2.2 mounted cylindrical radiator: supporting hook height according to the design requirements and should be back from the radiator on the height above ground of 45mm, draw a horizontal line. Hold hook-and-line is used to determine the horizontal position and line drawing scale-foot cross arm is inscribed with fins. Drawing a line under the number location and quantity distribution of support frame, draw a center line of the installation position of supporting hooks, mount the fixed height of the heatsink back from supporting hooks on the Center 3/4 of the total height of the heatsink, draw a horizontal line, its location and the number of installed with leg mount. Mounting column radiator dimensions see figures 1-12 and 1-13 (in parentheses).
3.6.2.3 the use of a chisel or drill, and draw the location of holes in the wall. Fixed the hole depth of not less than 80mm, supporting hook hole depth not less than 120mm, the depth of the poured concrete walls to 100mm (using expansion bolts by expansion bolts required depth).
3.6.2.4 rinse water hole in the debris, fill M20 cement mortar to the deep middle, fixed, hold the hook into the hole in the card, plugged, draw lines or 70mm tubes placed on supporting hooks, using horizontal leveling feet alignment, filling the mortar trowel.
3.6.2.5 columnar radiator fixed and support structure according to l-14 processing. Supporting hooks and the number and location of fixed cards by 1-15 installation (representative of square furnace).
3.6.2.9 radiator support bracket installations should meet the requirements of l-13.
3.6.3 heatsink installation:
Install support bracket number table 1-13
Radiator type a fixed number of cards in each group (a) beneath the hook (a) total (a)

All kinds of steel cylindrical furnace for cast iron and cast iron
Radiation convection radiator, M132 3~12
13~15
16~20
21 and over 1
1
2
2 2
3
3
4 3
4
5
6
Cast iron round wings each radiator are 2 supporting hooks included

Various steel closed radiator
High in 300 and below standard welding 3 fixed shelves, 4 more than 300 welding bracket
≤ 300 per set of 3 fixing bolts
>300 each group of 4 fixing bolts
Various Panel radiator Assembly the four fixing bolts (or four manufacturers supporting hooks)
Note: closed radiator or by manufacturers of steel supporting bracket in each group.

3.6.3.1 column radiators (including cast iron and steel) and the furnace of radiation convection radiator plug bushing and furnace oil, and asbestos rubber gasket, then tighten.
3.6.3.2 legs stable loading of the heatsink. Furnace fill heart are buckle side towards State tube direction, will fixed card inside nut Shang to distance meet requirements of location, sets Shang two block splint, fixed in in column Shang, with Shang outside nut, put radiator push to fixed of location, again put fixed card of two block splint cross came put citizen, with homemade tube wrench twist tight nut to must degree Hou, will radiator find straight, and find are, pad prison Hou tightened nut.
3.6.3.3 mounted column radiators and radiation-convection heat sink gently lift during straight on the hook, tighten the fixing clip straighten.
3.6.3.4 round-wing-type radiators installed. Assembled radiator up with care in supporting hooks found on straight alignment. Multi row series, flange first temporary good morning, then measure the size and piping connections.
3.6.3.5 closed strings made of steel and steel Panel radiator lifted hung on the fixed bracket, washer and nut on the belt, close to a certain degree level alignment, then tighten in place.
3.7 radiator cooling doors
3.7.1 according to design requirements, will need cooling furnace door eye blocking φ 8.4 in the drill hole, tapping on the bench with 1/8 ' taps.
3.7.2 oil furnace blocking a good lead, plus a good asbestos rubber gasket, radiator with box spanner to tighten. In the cold lead oil on the threads, wrapped around a little hemp thread, twisted by the fire plug, use wrench to tight the moderate, let hole inclined 45 ° outwards (should be installed in front of comprehensive pressure test).
3.7.3 steel series fin type radiator, flat tube radiators according to design requirements and statistics required number of radiator cooling, at the request of processing when ordering, the manufacturers are responsible for as well.
3.7.4 steel plate radiator out doors special doors let water exit plug, when making order request.
3.7.5 rounded wing-type radiator out door installation according to the design requirements on the flange cooling eye, practices the same furnace install and the cold wind blocking the door.
4 quality criteria
4.1 project:
Radiator type, specification, quality and hydrostatic test installation must meet the requirements of specification for design and construction (such as when one group hydrostatic testing not required, should be carried out according to factory test pressure of a test 5min seepage and leakage is qualified).
Inspection methods: inspection and test records.
4.2 Basic project:
4.2.1 cast iron wing-type radiator fins soundness of installation shall comply with the following requirements:
Long wing type, top Department off wing not over 1 a, length is unlikely to Yu 50mm, side not over 2 a, cumulative length is unlikely to Yu 200mm; round wing type, each root off wing number not over 2 a, and cumulative length is unlikely to Yu a wing tablets perimeter of 1/2, off wing surface should down or towards wall installation, surface clean, as reached exposed surface no off wing.
Inspection method: observation and standard checks.
4.2.2 steel string heatsink fins intact should comply with the following requirements:
Loose fins does not exceed 2% of all fins, fin and tidy without warping.
Inspection method: lever and observe the examination.
4.2.3 installation of the cooling equipment, carrier shall meet the following requirements:
Number and structure design and construction specifications, correct position, laying laying firm support bracket aligned, close contact with the radiator.
Inspection method: observation and hand checks.
4.2.4 radiator support brackets painted should comply with the following requirements:
Paint type and brushing a few times to meet design requirements, good adhesion, without peeling, blistering and missing coating, coating thickness uniformity, consistent color, flow and pollution-free.
Inspection method: Visual check.
4.3 allowable deviation:
Radiator installation location according to the design requirements, design custom installation location should be the same when not required; mount radiator height above ground by design, design requirements, generally not less than 150mm, but mounted on the radiator surface shall not be higher than the window height. Radiator installation coordinates, high tolerance and inspection methods are given in table l-14.
5 finished product protection
5.1 radiator group, to pressure test the installation state to carrying, neatly stacked. Operation when placing the following in the land to mat board, so as not to fall or touch the ground rusting, should prevent the rain without having to brush oil and rust-proof.
5.2 radiator handling into the floor, wooden gate, corner of ground should be careful not to bump the bad. Cylindrical furnace stove legs should be well protected and avoid touching off. Wing-type furnaces to prevent fin damage.
5.3 when picking his hole in radiator supporting hooks, exterior wall tiles should be careful not to push out the wall. Plant care in the light wall hook and fixed card application drill the hole to prevent wall cracking tick.
5.4 steel radiator transport and welding process to prevent the blades knock after installation should not be stepped on, curly leaf renovation should be smooth.
5.5 shotcrete protection measures should be taken before installing the radiator, preventing pollution, and keep them clean. Debris should be cleaned between the blades and to prevent falling into the debris.
6 quality problems to be noticed
6.1 install the heat sink position inconsistent. Not according to the drawings or measuring card size of furnace hook furnace caused by inaccurate.
6.2 asbestos rubber gasket radiator counterparts too thick, prominent lip surface of the liner diameter. Using liner thickness over 1.5mm or using dual pad, liner diameter is too large, you should use qualified liners; circular wing flange gasket thickness must not exceed 3mm.
Radiator installation method for the determination of tolerances and table 1-14
Allowed deviation of the project method

Distance from the wall on the inner surface (mm)
With the center line of the window (mm) 6
20 level (the level of
Feet), rulers,
Elevation from the ground at the bottom (mm) ± 15 lines and check

Center line vertical (mm)
Side tilt (mm) 3
3 using hanging wire and
Standard check

All

Long

Within the

The

Bending

Curved ash
Casting
Tiechangyi type
(60) (38), 2~4 (mm)
5~7 (mm) 4
6

Round wing within 2m (mm)
3~4 (mm) 3
4
It's hot
M132
Column type convection radiator 3~14 (mm)
15~24 (mm) 4
6

Series 2 (mm)
3~4 (mm) 3
4 use level (level),
Rulers, cable and standard checks

Steel

System Board-l<1M (mm)
l>1m (mm) 4
6

Tube-l<1M (mm)
l>1m (mm) 3
5

Column 3~12 (mm)
13~20 (mm) 4
6

6.3 heatsink installation unstable. This is due to the support hook arc does not comply with the radiator or contact is not tight, thanks to hooks, furnace is not strong, cylindrical radiator legs with no real cause, measures should be taken to remedy.
Hook 6.4 furnace furnace not in prison are not. Into the hole too shallow, hole cleaning not clean cement grade is too low or not caused by the filling of mortar is not strong; planted when there is no alignment or location of furnace hook, furnace is not being caused by inaccurate.
6.5 plugging the furnace, the furnace repair heart buckle is too small. Because the thread is too tight cause, prior to installation should complete the thread selected test.
6.6 floor installed the wrong column radiator number of legs, uneven placement. Requires two legs up to the 14, 15~24 should be installed 3 legs, 25 pieces and above installed 4 legs, legs evenly.
6.7-hanging radiator height above ground according to the design requirements, design requirements, generally not less than 150mm, but mounted on the radiator surface shall not be higher than the window height.
6.8 round wing with Wing-type radiators should be installed or wall installation, so as not to affect appearance; group and the eccentric flanges not wrong to ensure water or condensation water to smooth out the radiator.
6.9 in conjunction with civil construction, ensuring the accuracy of standpipe reserve and ground elevation, difficult to avoid to install the heat sink, avoid the saws, horizontal, pad oven legs.
Quality of 7 records
7.1 there should be material equipment factory certificate.
7.2 material and equipment entering inspection records.
7.3 Group on furnace and single radiator pressure test records.