General requirements for the installation of fire engineering

Installation of fire engineering General
1 scope
This technology is applicable to industrial and civil building fire equipment installation works.
2 construction preparation
2.1 construction of fire-fighting design drawings of the design, must be the appropriate design qualification certificate design unit design. Supervised by the construction drawings and information will be sent by public security fire control institutions review and approval, approval of construction.
2.2 units engaged in fire-fighting facility construction, should have the appropriate level of qualification, their level of qualifications in conjunction with relevant departments, has audited by public security fire control institutions, construction Enterprise qualification certificate of fire safety engineering.
2.3 construction site by construction units responsible for fire safety. Before construction starts, you must report to the public security fire control institutions, by public security fire control institutions issuing licenses behind the construction of fire safety at construction site.
2.4 construction units must be in accordance with the approved design drawings shall not be tampered with.
2.5 installation of fire protection products, machinery and electronic products and materials should conform to the following conditions:
2.5.1 this city's fire protection manufacturers, should have a production license issued by the State. Or foreign sales in this city in the field of fire protection products, to be Beijing sales audit certificate has a validity period. When used to specify products listed in the certificate is consistent with the products they need.
2.5.2 fixed fire extinguishing systems and fire-resistant components and fire-resistant coating shall have effective national quality testing center qualified report.
2.5.3 fire electronic product must have a valid state for fire electronic product quality inspection report.
2.5.4 selecting the level of cabinets and all kinds of box screen must be in the mechanical Department and approved by the Ministry of Sentinel products; imported electrical products must have the State Commodity Inspection Bureau test certificates, certificates on the device nameplate.
2.5.5 the construction electrical products used in construction such as wires and cables, switches, and so on, should conform to the China Certification Committee for electrical safety certification requirements, and its electrical products safety certification requirements with safety certification Committee, shall carry on its electrical products safety certification mark (the great wall), and certificates on the device nameplate.
2.5.6 the selection of various types of steel, shall comply with the relevant standards and design requirements, manufacturers wishing to produce material proof and certification.
2.5.7 main certificate of accessories, fittings, welding and painting.
2.6 use of equipment must conform to the technical requirements of the construction site, using a strong inspection and non-strong inspection of measuring instruments should be managed according to the requirements of national law.
2.7 the construction manager, Builder, quality inspector, materials should be certified. Workers, such as electricians, welders should also be certified.
2.8 construction should be subject to public security fire control institutions and authority as a parent unit to inspect and guide the quality supervision to ensure project quality.
2.9 the construction should be in strict accordance with the approved design drawings and construction, seriously implement the relevant fire code for design, construction and acceptance specification, construction technology and construction requirements related to Atlas, the management of information.
2.10 construction records and information collection and filled out should be synchronized with project completion acceptance of delivery should be handed over to the owner when a complete set of engineering data, and in accordance with the contract, drawing as-built drawings.
2.11 upon full completion of installation and debugging for fire protection engineering, construction unit should conduct the check, after passing the construction unit (supervision), design unit acceptance, handling completed acceptance form.
2.12 construction or construction of building fire protection facilities detection units should be entrusted to qualified unit for technical testing, and submit a technical test report.
2.13 the project owner should apply to the acceptance of submitted by public security fire control institutions, relevant information, public security fire control institutions for fire protection engineering acceptance, after inspection acceptance certificate of fire safety facilities, are permitted to use, otherwise, unqualified acceptance or acceptance shall be permitted to use.