Plumbers
1 waterproof, waterproof coating is
suitable for construction
2, waterproof project should do after
construction completed and acceptance of concealed work
3, waterproof construction after the
completion of 2 times to do water testing
4, bathroom waterproofing layer should be
not less than 1.8 metres
5 corners, floor drain, Yin and Yang, pipe
and other places a waterproof
6, floor drains and odor-resistant floor
drain
7, hot and cold water pipes Zuo Re right
cold
8 from the ground, water pipes and try not
to go
9, protective layer of cold water pipes in
the wall 1CM, hot water is 1.5CM, so Groove take it deep
10, with PPR is to consider stamped tile
thickness, pipes will not show
11, just minutes to Cook, wash dishes for a
long time, water must buy
12, taps and basin facilities, has not got
a bad
13, toilet installation can not use cement,
silica gel
14, toilet, faucet installation is
completed to protect
15, to be considered when buying a toilet a
toilet hole distance
16, under the washing machine is draining
but also to be considered are the drainage.
17, best not to telephone in the bathroom,
easy to damp
18, first consider the size of the mirror
in the bathroom, or mirror lamp is easy to hold up
19, bathroom pipes are best left the
manhole
20, power cannot be put in the same weak
pipes
21, on the right and left zero-phase
grounding
22, power outlet away from 300, switch 1.4
m
23, the switches do not install behind the
door
Lot of 24, Jack should be good
25, 16A socket for high-power electrical
appliances, such as toasters, etc
26, the cassettes must use good
27, the cassettes must and panel support,
or you may install not
28, PVC tubes and wires wire cross
sectional area of not more than 40% of wire cross section area
29, air conditioning in bedrooms not to bed
30, air conditioning tilt outward to be
considered, otherwise rain will come in
31, lamp as far as possible take into
account dual control
32, the bathroom had better install splash
plugs
33, taking into account a socket on the
balcony
34, wire ducts to horizontal even vertical,
lined, and easy to use
35, common flues to install check valves
36, bought the appliances must be properly
let workers watch instructions
37, instruction manual and warranty card
information must stay good
Mason
38, cement has surpassed the factory can't
be used for three months
39, the different varieties, the marking of
cement should not mix
40, yellow sand must be used for River
sand, with the mouth taste will know
41, wall and floor tiles to soak in water
for two hours or more, the shade can be posted
42, wall and floor tiles rather than buy a
few more, not less, or prone to chromatic aberration
43, on one of the walls cannot have two
rows of non-integer brick
44, immediately after wiping seam clean the
ceramic tile
Posted 45, ground marble (light), the back
of the stone to do waterproofing
46, corner office would like to cut a
45-degree angle
47, to incline to a floor drain, or easy to
water
48, wall tiles meet the pipe mouth shall
take the form of cuts, it seemed to be the entire block of brick
49, marble on the ground should be dry-laid
50, be sure to stain-resistant, non-slip,
not just to look good
51, matte ceramic tile cleaning
52, balconies and floor tiles should pay
attention to drainage directions
Woodworking
To keel the best 53, use dryer larch
54, bought lumber sawed after drying
55, Carpenter's approach to playing the
House line
56, color Panel must buy a paint brush and
again to prevent dirty
57, the ceiling fan cannot be installed on
the ceiling joist
58, color Panel construction in advance to
pick color
59 hanging bar away from the wall, ceiling
shall not be greater than 300
60, gypsum board to use countersunk head
self tapping screws, Access Board 1~2MM and antirust treatment, not gun nails
61, the distance between the plasterboard
nails cannot be greater than 200
62 3MM of joints, gypsum board and the wall
in order to crack
63, drywall corner at the best angle to
protect
64, wooden door at the head of paint
65, bathroom door bottom brush
waterproofing
66, size of the door should be consistent
67, furniture, try not to let the wood do,
do well
68, Cabinet try to buy whole, woodworking
done bad, not design
In 69, the dimensions must be considered
good, just more trouble to change the
70, make your own sliding door not to do
dark orbit, no way after repairs
71, small bathroom door, do not open the
door, place
72, not sure of the carpentry foreman and
must communicate, do not let them cool
73, money in hand is the hard truth
74, with the baby, less glass
75, be sure to let workers watch the
drawings
76, kitchen drawers are useful
77, floors smoothness of wood joist 5MM
78, paved floors 30 degrees or 45 degrees
between the plate and the plate 2~3MM, joints staggered
79, 8~10MM gap between the floor and wall
80, floor length over 8M, taking into
account the expansion joint
81, to minimize the use of MDF door
82, hinges and hardware must use good
83, bath placed on the wooden keel cannot
be mounted directly on top of the crane
Painter
84, try not to water, dark paint in
construction, or prone to chromatic aberration
85, drywall bandage seams to
86, on the wall there are gaps where really
cool good
87, the original wall surface PuTTY best
eradicated, or brush over glue cementing
88, try to buy well-known brands of paint,
decoration recommended or recommended by the foreman of the company isn't
famous as far as possible not to use
89, the weather is too wet, paint not brush
90, paint, paint Polish to dry completely
after
91, down paint after construction must wait
for the paint to dry before
92, metal surfaces of paint to do the
anti-rust treatment
93, the weather is too cold, poor paint
quality
94, doors, paint, use masking tape stuck
hinges and locks
95, it's too hot, you want to pay attention
to ventilation
96, while wallpaper, to brush on the wall
clear
97, while wallpaper, to remove switches,
socket panel
98, light, silky emulsion paint to a
finish, and prone to chromatic aberration
99, the baseboard after installing Putty
and latex paint to fill gap
100, frosted glass with newspaper to
protect