1 scope
This technology is applicable to steel grid with bolt-sphere joints, welding joints, weld plate joints of steel grid structure of ground works.
2 construction preparation
2.1 materials:
2.1.1 steel grid assembled steel and materials, high strength bolts, rods and other materials should comply with the design requirements and shall have factory certification.
2.1.2 bolt-ball and welding, and welding-ball and hollow Cone, sleeve, cover plate, truss rods, welded steel joints and other semi-finished products should comply with the design requirements and the corresponding provisions of the national standard.
2.1.2.1 bolt ball steel to make steel structure wire table, must comply with the design requirements and the corresponding material specifications and standards. Bolt is strictly prohibited burning, cracking the ball and kind of hidden, finished the ball must be on the maximum tensile strength test of the screw holes. Bolt shall comply with quality requirements and test methods provided in table 5-14.
Bolt-ball method for the determination of tolerances and table 5-14
Project tolerance (mm) method

Ball blank diameter d 120 +2.0-1.0
D>120 +3.0-1.5 using calipers, Vernier calipers to check
The roundness of the ball d 120 1.5
D>120 2.5
3-bolt ± 0.20 ball screw end and Center distance measured with a Vernier caliper, mandrel, height gauge check
Two screws on the same axis d 120 0.20
Parallelism D>120 end 0.30 using Vernier calipers, height gauge check
5 two adjacent ± 30 ' by measuring the angle between the screw axis, height gauge mandrel, dividing head check
6 bolt end surface perpendicular to the axis of the 0.5%r with a dial gauge
Note: r is the bolt end surface radius.

2.1.2.2 assembled with high strength bolt steel must comply with the design requirements and the corresponding technical standards. High strength bolts for steel grid structure must adopt the national standards of the high strength large Hexagon head bolts for steel structure under performance class 8.8S or 10.9S and should be checked according to the corresponding requirements. Check for high strength bolt factory certification, inspection and test reports, inspection re-inspection report. In front of the assembled each surface hardness test of high strength bolts, no cracks and damage. Method for the determination of tolerances and high strength bolts shall conform to table 5-15 requirement.

Table 5-15 of the method for the determination of tolerances and high strength bolts
Project tolerance (mm) method
1-thread length (t-pitch) +2T 0
2-bolt length +2T-0.8T
3 Groove ± 0.2 with tools, Vernier calipers to check
4 keyway straightness <0.2
Position 5 of <0.5

2.1.2.3 assembled by welding of ductile materials, specifications and quality, must comply with the design requirements and the provisions of the relevant standard. Welding electrode and flux, wire and shielding gas shall comply with the technical requirements and regulations. Welded steel ball bearing ball factory certification and inspection reports. Assembling welding ball should meet the requirements of table 5-16.
Tolerances and inspection method of welding ball table 5-16
Project tolerance (mm) method
1 ball height flush with the surface of sphere ± 0.5 using weld gauges along weld circumference equal parts take 8 points
2 ball diameter d 1.5 ± 1.5 with calipers and Vernier calipers checked, each measurement to three
3 ball D>300 diameter ± 2.5 numerical
4 ball roundness d 300 w 1.5 calipers and Vernier calipers checked, each measuring three on each mutual
5 ball roundness D>300 2.5 to 90 °, with the average of three pairs of diameter difference meter
62 hemisphere counterpart unfitness 1.0 model and Vernier calipers checked, each ball maximum misalignment

2.1.2.4 assembled steel grid plate, cone, the steel sleeve, must comply with the design requirements and the appropriate technical standards. Cover plate, cone, sleeve appearance of wood cracked, had burned and oxidized. Cover plate, cone, bask in the quality requirements and test methods should meet the requirements of table 5-17.
Seal plate, cone, the sleeve method for the determination of tolerances and table 5-17
Project tolerance (mm) method
1 plate, cone aperture +0.5
+0.5-0.2 2 plate, cone bottom thickness using Vernier calipers to check
3 plates, cone bottom two parallel 0.1 with dial gauge, v-shaped block check
4 plates, coaxial cone hole and the pipe installation steps of 0.2 with dial gauge, v-shaped block check
+0.2 0 5 cone wall thickness using Vernier calipers to check
6 sleeve in the hole with the circumcircle of coaxial degree 0.5 measured with a Vernier caliper, dial gauge, mandrel check
7 sleeve length ± 0.2 using Vernier calipers to check
8 sleeve ends perpendicular to the axis of the 0.5%r measured with a Vernier caliper, dial gauge, mandrel test
Parallelism of sleeve 9 ends 0.3
Note: 1. Cover plate, cone, socket should have conducted separate inspection and assessment.
2. r is the radius of the circumcircle of the sleeve.

2.1.2.5 steel grid plate for assembling welding, must comply with the design requirements and the appropriate technical standards. Certificate of welding materials factory and the corresponding technical standards. Assembling plate joints weld shall meet the design requirements. The quality requirements and test methods shall be in accordance with table 5-18 requirement.
Steel node method for the determination of tolerances and table 5-18
Project tolerance (mm) method
1 Gusset Plate length and width ± 2.0mm with a steel ruler to check
2 gusset 0.5mm thickness using Vernier calipers to check
30 byte plate angle between ± 20 '
40 bytes between the plate and the cover plate angle ± 20 ' standard angle gauge check

2.1.2.6 steel truss rod parts for assembling the steel varieties, specifications, quality, must comply with the design requirements and the appropriate technical standards. Steel bars and plates, cone connection must conform to the design requirements, quality standards must be consistent with the national standards of the steel structure project construction and acceptance in the second level of quality standards. Steel bar with cover plate or Cone weld strength test should be carried out, its carrying capacity shall meet the design requirements. Steel pole of quality requirements and test methods should meet the requirements of table 5-19.
-Tolerance and inspection methods table 5-19
Project tolerance (mm) method
1 making length ± 2 steel angle bar examination
2-welded spherical grid structure of steel bars production length ± 1
3 length of bolt ball steel bar unit ± 1 using tools and indicators to check
4 axis deflection L/1000 and Michael Jackson-5
5 plate or Cone head perpendicular to the pipe axis 0.5%r with dial gauge, v-shaped block check
Note: a rod length l, r radius at the end of a plate or Cone head.

2.2 the main equipment
Welding machines, oxyacetylene equipment, wheel saws, pipe cutting machines, steel tape measure, steel ruler, caliper, thickness gauges, ultrasonic flaw detector, magnetic detector, hammers, wire brushes, calipers, dial indicator detection instruments.
2.3 operating conditions:
2.3.1 assembling the welder must have a welding test certificate, there is a corresponding qualification of the welding material and welding station.
2.3.2 Assembly prior to installation site safety facilities, fire prevention facilities. Assembled before the assembled position detection, prevention of fetal movement and deformation. Assembling position should remain the welding deformation of the right margin, preventing Assembly Rod deformation, distortion.
2.3.3 Assembly former Member sizes, Groove and weld gap should be in order.
2.3.4 familiar with the drawings, preparation of the Assembly process, technical clarification.

2.3.5 before assembling, assembled with high-strength bolts of hardness test them one by one, up to standard values can be assembled.