Thursday, November 24, 2016

Fitting considerations

In General, problems decorating has each season, spring is no exception. According to a survey, in some cities, consumers say their season for renovations inadvertently triggered quality of decoration a large proportion of the poor, such as 54% and 37% respectively in Qingdao, Shanghai and, therefore, home decoration, in addition to carefully selected decoration team, choosing decorating season, consumers should carefully consider an important aspect.


1. before the decoration should pay attention to moisture
Wood flooring is now a decorative ground of choice for consumers. Choose wood floors in the spring, have suggested should be aware of when selecting wood flooring moisture content, especially wood floors, moisture should be about 11% in General, if the moisture content is too high, buy paving after the home is completed, wood floor is water loss, warping deformation may occur. Consumers can require manufacturers to use specialized instruments to measure the water, if not measurement brands don't have to ignore, the production of large families will have the corresponding production, surveying, transportation security system, wood floors, quality can be guaranteed.
In addition, the pavement flooring is its quality factor in the future. Construction should remain in the ground is dry, paved a vapor barrier. Damp bedding treasures, if manufacturers when no distribution, consumers should ask.
Who must buy someone's floor pavement. Construction personnel know about its products, facilitate construction; second, will be taken to avoid passing phenomenon, a construction company responsible for a product is beneficial to consumers.
Finally, paved the floor of the room should be aware that Windows open for ventilation, paint, concrete and flooring moisture slowly dispersed.
When moisture was in the purchase of timber for wood, be sure to to large wholesale markets, rather than on a street shop. Because the largest wholesale market of wood is generally made after drying in the production, shipped in containers, wholesaler delivery directly from the container, and then shipped to decorate the premises of the owners. Intermediate reduction, reduces the chance of wood exposed to moisture. If you do not trust, the purchase may wish to request the wood using a hygrometer for humidity testing, which will be foolproof. Should be reminded that, wood purchased back should be placed in the House after two or three days, then construction program. This deformation of the wood is essentially no longer appear problem.
2. the decoration should be waterproof
In the decoration of many families, of the bathroom wall and floor tiles to the original cut, laying new tiles. Results of this, is you need to do in the bathroom wall and floor waterproof project. Toilet floor leveling then waterproofed, furniture to avoid leakage due to uneven thickness of waterproofing coatings; joint Paint; wall surface processing are also important in water treatment in General, about 30 cm high on the wall of the waterproof coating to prevent water seepage wall; waterproof test must be done. If waterproof engineering quality problems have emerged, ranging from water stains will dry up in the next room, it will leak into the downstairs, causing serious damage to your home and neighborhood.
3. after decoration to taste
Spring decorating experience finished, all kinds of powder out of the problem, affecting people's health. Decoration company's proposal is that renovation placed Greens, play light and remove odor. Or in room 2 to 3 lemons or oranges, bananas, can achieve rapid results.
4. don't ignore details
Except above several aspects, spring construction also has many should note of small details, for example selected material Shi buy latex paint, and adhesive must to selected has elastic of, then again added help with, so as not to autumn up has, wall surface also will lost part water, at elastic good of paint tolerance deformation capacity strong of advantage to full appeared, and elastic relative weak of paint wall surface more or less will has cracking phenomenon occurred. In addition, at the time of construction, primary moisture-proof primer not brushing is complete attention to ventilation, seeking to maximize dry. Corner of a dry break; wood block decoration when staring at the floor, waterproof first. The normal procedure is: EPE/filter base, and requirements when installing the floor joints. This way, the floor will not overturn or black moldy due to tide.
5. considerations
Dry, windy spring, is prone to fires. Therefore, consumers with industry experts remind under renovation, decoration, good decoration effect for security, be sure to fire prevention, virus prevention, and deformation of materials in advance prepared.
First off: fire first, pay attention to safety, you cannot just pull wiring, power supply cable protection tube; no smoking, cannot use open flame; paints, thinners and other flammable materials should be stored away from sources of ignition away, cool, ventilated, safe place is equipped with fire-fighting equipment, if necessary.
Secondly, in the decoration should pay attention to in the use of fireproofing materials. In addition, all electrical wiring should be worn bushings, junction boxes, switches, slot lamp, ceiling light and heating devices around non-burning material fire.
The second hurdle: ventilation and decoration are widely used in paints, paint and thinner, and is easy to evaporate. Poor ventilation, paint volatilized gas not easily discharged, many gathered in the room. Volatile gases mixed with air to form an explosive mixture of gases, fire explosive encountered.
Third: the wood when purchasing wood, be sure to to large wholesalers, custom furniture and not in the street shop. Because large wholesaler of wood is in dry processing, then shipped in containers, reduces the chance of wood exposed to moisture.
Wood purchased back should be placed in the House after two or three days, and gas-phase adaptation and construction procedures. Should also keep the floor dry before construction, made up the damp proof course.
IV: the ceramic tiles ceramic tiles varied buy in the spring should pay attention to moisture content. Surface smooth and delicate, gloss Crystal gloss surface, is content with no smooth soft good products.
While paying special attention to differences between ceramic and porcelain, little water absorption, the structure is fine, tap clear sweet voice is the porcelain tiles, high water absorption, structural holes, percussion sounds dull muddy is ceramic tile. Small water absorption of ceramic tiles in the case of large changes in temperature between day and night in the spring is not easy to crack.
V off: when the floor wood flooring, be sure to install the workers enough expansion joints, so that in the summer months, the floor will not overturn. While keeping the interior air dry.
VI: the paints with inner insulation of new type thermal insulation wall, it is easy to decorate paint cracking problems occurs in. Solution are wall bed treatment clean, put a layer of Dacron fabric on the wall, using the fibre tension, to ensure the integrity of latex paint film. Another uses a flexible decorative material, base treatment on walls.

No comments:

Post a Comment