1, making the base material with 18 per cent core and 9 plates, window production base with 18 per cent core and 9 plates, door frame, window frame against the wall at the end of some light painting again, on either side if the door gap is greater than 2CM, then apply the cement mortar filling. Door installation, window frame lines prior to opening an expansion slot on the back, prevent variants, set line width 55MM, 8MM Windows, set line width 5CM. Thick 8MM.



2, and door sets grass-roots 15 PCT big core Board Xia material must sets material, grass-roots with dry wood playing wood wedge solid prison, away from to 5cM, prevent water dip, check flat degrees, and vertical degrees, flat degrees, and vertical degrees allows errors ± 1MM, diagonal allows errors ± 2MM, detection door above around angle to horizontal distance, all door sets should do height consistent, similar door width consistent, bedroom door General for 800X2000, kitchen, and Wei door General for 700X2000 or 650X2000, Door leaf thickness is 38MM-42MM (if you have other requirements designed).

3, if you have under Windows using the wooden keel frame plywood closed, with 15 per cent open-core 5CM wide plank, 20CM wide, with the original plastering layer of wall height difference is 15MM, old plaster layer knocks around under Windows 50MM, nail stencil plastering, plastering does not exceed the wall plastering layer (focus on).


4 door, window frame corner joints tight lines, wiring duct patency, texture, color change, gun nails in a line outside the rebate lines from 5MM. Door line for 0.8X5.5, window cover lines for 0.8X5.





5 door lateral spaces with the same solid lines close, does not allow use of veneer edges.

6, sliding door jamb location Groove at one corner, sliding doors with depth and clearance at the track to 60MM.

7, kitchen and toilet in addition to stainless steel door sets, decorative panels must be shut with a solid line.


(Ii), the door

Practice 1, hollow door: door leaf thickness of 42-43MM. 18MM wood panels open, standing around 2-3 circle, reinforcing bar spacing must not exceed 200MM, load lock location cannot be blank. Hinge reinforcement on both sides in the imported 5MM plate, decorative panels, place in the standard press flat for more than 7 days, each procedure must be coated with white LaTeX.






2 practices, solid door: door leaf thickness of 42-43MM, plywood, plywood on both sides out of the symmetrical balance gap, nailed plywood with white glue and a gun, and another Panel, put in the standard bed flat for more than 7 days. Moisture content should be between 8% and 12% before use should be polished, brush primer twice after use, gate when planing doors, main plane surfaced at the end of the height, the overhaul planing height of not more than 5, side planing both sides planed, overhaul plane is not more than 5MM on each side.

3, the door panel must be selected before use, primer on classification after reasonable packages and color scheme used, sealing plate using white LaTeX, mosquito nails, white latex coating evenly enough; Panel mosquito must use stainless steel nails, panel color, textures should be closely coordinated gap, non-injury, mosquito nailed focus before use check the nail hole size, adjust the nail gun.

4, and doors shut: wood shut, selected color using, repair side Shi, is strictly prohibited injury Panel, all door and the sets only allows in improper eye at has a at 0.5 square centimeters within of scars, wood line push light school flat rear can using, wood line and Panel seams closely, eye from 50CM should missing seams, allows little chromatic aberration, wood line diagonal at should wear pointed, 45 degrees diagonal.

5 door edge must be selected carefully to ensure

Front line texture, color balanced appearance, door edges shall be smooth polished back above primer before using 2 times, nailing lines must push light leveling after a small amount of glue on the back with 30 straight nails, more than 60 60 wide lines must be enclosed in double rows of nails.

6, and doors installation: doors and ground (surface layer height) distance 5-8MM, doors left, and right, and catchy clearance 1.5-2.5MM, doors and door block combined closely, gap ± 1MM, loaded doors involved frosted glass Shi, loaded good Hou should in light facial playing amount glass rubber protection glass, kitchen, and Wei with mill sand surface should to outside, and outdoor handover at mill sand surface should to within.

7, install the hinges must be double-sided slot in the door leaf and door frame, door opening with stainless steel self-tapping screws for hinge installation.

8, against the door installation, reliable, accurate, and on the magnet fixed on the baseboard, skirting around should be reinforced.

Height from the ground 900-1000MM 9, door installation, door locks, lock is correctly positioned and the lock bolt and the doors, gaps between the latch and the door frame should be tight and securely opened freely, lock is installed must be wrapped to protect to prevent contamination.

10, glass door to do solid framework.

11, inlay aluminum doors, protruding round corners.


12, before the completion, remove hinge and lock tape.