1 scope
This technology is applicable to industrial
and civil buildings and structures in reinforced concrete structure ⅱ-ⅲ class reinforced
ribbed 20~40mm in diameter radial crushing connection construction.
2 construction preparation
2.1 materials and equipment:
2.1.1 steel grade, diameter (L8~40mm) must
comply with the design requirements and national standards, there should be
quality certificate and retest report. Imported steel has to pressed for type
inspection, meet performance requirements before use.
2.1.2 steel sleeve made of low carbon
killed steel, which should meet the requirements of mechanical properties. II
sleeves, tubular steel with yield strength s ≥ σ 205N/mm2; tensile
strength σ b=335~520N/mm2, σ s of elongation ≥ 20%. ⅲ class reinforced sleeve s σ ≥ 230N/mm2,
b=390~520N/mm2 σ, σ s ≥ 20%. Diameter greater than 5mm, with a variable cross section steel
sleeve. Sleeve specifications model G18, G20, G22, G25, G28, G32, G36, G40,
sleeve should have a factory certificate, partial acceptance.
2.1.3 equipment: high pressure pump,
tubing, pressure clamp, steel Extrusion die, hanging car, balancer, angle to
the wheel, marking tool and check for creasing tools such as card board
caliper.
Note: ribbed pressed is to insert the two
need to connect steel steel sleeve, use radial compressed steel sleeve clamp
pressure, to produce plastic deformation on deformed steel sleeve with integral
connection method for steel bars are connected closely.
2.2 operating conditions:
2.2.2 participation crimp contact the
personnel must be trained and certified until passing the examination.
2.2.2 remove steel sleeve and reinforced
extruded parts rust dirt, sand and other debris.
2.2.3 reinforced with steel sleeve test
sets, such as reinforcement bars, Horseshoe, Flash, bending and longitudinal
rib size large should be corrected by hand-grinding mill, prohibit the use of
electrical welding and cutting most of Super.
2.2.4 bar end positioning marks and check
marks to ensure that steel into the sleeve length. Landmarks from the end part
of the distance to the steel sleeve length 1/2.
2.2.5 check equipment is normal, and
pressure, in line with the requirements before operation.
3 operational processes
3.1 process:
Steel sleeve, reinforced extruded parts
inspection, cleaning and correction → steel end crimp
marks →
Reinforced steel sleeve → press → insert
check acceptance
3.2 steel steel sleeve should be inserted
according to the marking requirements, ensure that the connector length to
prevent air pressure. Axis and axis of steel sleeve dowels should be kept the
same axis, eccentric and prevent bending.
3.3 in pressure received joint at hanging
good balance device and pressure clamp, received good into, and back oil
tubing, up moving super high pressure pump, regulation good pressure relay by
needed of oil pressure, then will Xia pressure die card board open, out Xia
die, put extrusion machine machine frame of opening insert was extrusion of
with rib steel of connection sets in the, plug back Xia die, lock died card
Board, pressure clamp in balance device of balance force role Xia, alignment
steel sleeve by needed pressure received of mark at, control extrusion machine
reversing valve for extrusion. Locked card plates with crimped ends open,
remove the lower die, exit extruders, complete extrusion construction.
3.4 when squeezed, get alignment sleeve
clamp pressure indentation marks, and perpendicular to the transverse ribs of
pressed steel. Squeeze from the crimp sleeve by road to Central end, such as φ
32 reinforcement at each end 6 indentation, and finally checks the indentation.
The minimum diameter and the total width of the indentation required to comply
with the requirements shown in Figure 4-35.
Figure 4-35
3.5 in order to reduce aerial work and
accelerate the construction schedule, first on the ground pressing half a joint
in the construction area reserved socket and the other end into the steel
reinforcement, according to technological requirements, squeeze the other end.
4 quality criteria
4.1 project:
4.1.1 steel variety and quality must comply
with the design requirements and the provisions of the relevant standard.
Inspection method: check the factory
certificate and test report.
4.1.2 steel sleeve of material and
mechanical properties of steel sleeve standard requirements must be met,
without cracks, folds and other defects on the surface.
Inspection method: check the factory
certificate.
4.1.3 crimp contact strength must be qualified.
500 a same specifications, and same pressure received process completed of
steel joint for a, and with batch joint distribution not than three a floors,
insufficient 500 a still for a, random extraction 3 a try pieces for tensile
strength test, and each layer many Yu 1 a, tensile strength are shall not below
was pressure received steel tensile strength standard value of 1.05 times
times, if which has a try pieces not meet requirements Shi, should again
extraction double (6 a) try pieces for retest, retest results still has a try
pieces not qualified, is the batch joint for not qualified products.
Inspection methods: inspection and test
reports.
4.2 Basic project:
4.2.1 the appearance of joints should be
individually self-test based on 10% connector. Indentation may not have hollow,
split, bent connector must not be greater than 4 °, reinforced insert steel
sleeve length must comply with the regulations. If you do not comply with the
requirements of the joint should be removed again.
Inspection method: observation, or check
with a ruler.
4.2.2 splices indentation depth is not
sufficient to be filled. Overpressure shall be removed to squeeze again.
Minimum diameter steel sleeve indentation and total width, should be consistent
with steel sleeve supplied manufacturers with the technical requirements.
Inspection method: observation and check
with a ruler.
5 finished product protection
5.1 prefabricated connection must be on the
ground with a wood mat well, neatly specifications.
5.2 socket without mortar and other debris.
5.3 compression connector at high altitude,
to set up a temporary shelf, not pedal step on the joints.
6 quality problems to be noticed
6.1 carefully check the quality of steel
sleeve, the material does not meet the requirements, no certificate of quality,
as well as the appearance of substandard steel sleeve, shall not be used.
6.2 Note reinforced insert steel sleeve
length, carefully check the tag line of steel, from the air pressure.
6.3 squeeze a stricter control of its
pressure, carefully check the indentation depth, not enough depth to fill,
extra deep to remove connectors to reconnect.
7 quality records
This standard shall meet the following
quality records:
Steel quality certificate or test report
7.1.
7.2 steel mechanical performance test
report.
7.3 steel sleeve certificate.
7.4 header test report form.