Concrete mixing process

Concrete mixing
1 scope
This technology is applicable for industrial and civil buildings of the concrete mix.
2 construction preparation
2.1 materials and equipment:
2.1.1 cement: cement, label, factory and trademark should comply with the notice requirements of concrete mixing ratio. Cement factory certification and entry test report.
2.1.2 sand: sand particle size and origin should meet the requirements of concrete mix order. Sand clay content: when the concrete strength C30, clay content 3%; when the concrete strength grade <C30, clay 5%, frost resistance, impermeability requirements, the sediment shall be 3%. Content of mud in sand (greater than 5mm of pure clay), when the concrete strength C30, its content should be l%; when the concrete strength grade <C30, its content should be less than 2%, frost resistance, impermeability requirements, its content should be less than l%. Sand should have the test report form.
2.1.3 the gravel (gravel or pebbles): stone size, grade and origin should meet the requirements of concrete mix order.
Stones of needle and plate-shaped particles content: when the concrete strength C30, 15%, when C25~C15 is strength of concrete should be 25%.
Stones of clay (less than 0.8mm of total dust, silt and clay content): when the concrete strength C30, 1%, when C25~C15 is strength of concrete should be 2% when on the frost resistance of concrete requirements should be 1%.
Stones with mud content (greater than 5mm of pure clay): when the concrete strength C30 should be 0 5%; when the concrete strength grade <C30, should be 0.7%; when the concrete strength grade C10, should be less than l%.
Stone should have a sample report.
2.1.4 water: potable water should be used. Other water, the water quality must meet the standards for concrete mixing water (JGJ63 189) requirements.
2.1.5 admixtures: concrete admixtures, used by manufacturers and brands, the mix order requirements. Admixtures shall have certificates of quality and use, and should have entry test report on indicators. State regulations require certification of products, should also be permitted documents. Additives must have volume test.
2.1.6 mixed materials (primarily fly ash at present, there are mixed with other materials, such as zeolite and UEA expansion agent): varieties of mixed materials, used by manufacturers and brands, the mix order requirements. Hybrid materials have certificates of quality and use, and should approach the test report. Mixed material must also have a volume test.
2.1.7 main machinery: concrete mixers should be compulsory mixer takes precedence, to using down mixer. Metering equipment commonly used scales or electronic measuring equipment. Measuring meter, time relay can be used to control the water flow meter tube or tank water level marks the meter. Feeding equipment there are two-wheeled carts, forklift, loader, sand transport Hopper, as well as supporting other devices. Field test instruments, such as slump test equipment, test mode.
2.2 operating conditions:
2.2.1 laboratory issued concrete orders, and convert each actual mix used, and published in place of mixing ingredients on the plate.
2.2.2 all raw materials inspections, all should conform to the mix order request.
2.2.3 mixers and their ancillary equipment shall be operational flexibility, safety and reliability. Power supply and distribution system in accordance with requirements, safe and reliable.
2.2.4 all verification of measuring instruments must have valid identification. Clean platform below and the surrounding sand, stone, measuring instruments sensitive and reliable, and press set mix special points.
2.2.5 administration personnel to the job the team mix, operating procedures and safety technology gives the low-down.
2.2.6 part has been hidden to be pouring concrete inspection, preflight procedures, concrete request has been approved by the relevant managers.
2.2.7 released concrete mix, identification should be opened. Opening stock of the work carried out and meets the requirements.
3 operational processes
3.1 basic flow:


3.2 each Taiwan class began Qian, on mixer and the Shang material equipment for check and commissioning; on by with measurement apparatus for check and set pounds; proofing construction tie than; on by with raw materials of specifications, and varieties, and origin, and grades and the quality for check, and and construction tie than for check; on sand, and stone of containing water rate for check, as has changes, timely notification test personnel adjustment water. After all checks meet the requirements before they can open mixing concrete.
3.3 measure:
3.3.1 sand, stone measures: when feeding on a wheelbarrow, must weigh, discharge up less. Hopper and ancillary measuring equipment, with automatic or semi automatic material, need to adjust the amount of aggressive closes early, in order to ensure accurate measurement. Sand and stone measuring deviation should be allowed to ± 3%.
3.3.2 cement-weighting: mixing using bagged cement, for each entry, the cement should check 10 bags of weight and measure the average weight of each bag. Calibration weight is less than to open the bag up, or subject to the actual cement weight of each bag, adjusting the amount of sand, stone, water and other materials, according to each concrete mix * set of construction mixture ratio. When mixing cement in bulk, should be conducted at precise measurement. Cement-weighting the deviation should be allowed to ± 2%.
3.3.3 measurement of admixtures and mixtures: powdered admixtures and mixtures should be according to the construction mixture ratio per plate materials, admixtures and mixtures placed in advance are measured in the warehouse, and small package shipping to stir and set aside. Liquid admixtures to ad-mix, with a hydrometer to check the concentration, the amount of barrel measurement. Measurement tolerances of admixtures and mixtures shall be ± 2%.
3.3.4 metering of water: the water must be measured, the deviation should be allowed to ± 2%.
3.4 preparation: mixing concrete on site, good is generally measured on the collection of the raw material in the hopper, hopper into the mixing drum on. After measurement, the water and liquid admixtures, feeding into the mixing Drum at the same time, directly into the mixing tube. Raw material collection into the sequence is as follows:
3.4.1 when no admixtures, mix, and entered the order of the hopper for gravel, cement and sand.
3.4.2 when mixed-doped material, its order is gravel, sand, cement, mixture.
3.4.3 when mixing dry powder additive, the order for these stones, admixtures, cement, sand into order as gravel, cement, sand and admixtures.
3.5 the first concrete mixing system operation:
Concrete mix first set to work at a time, mixing drum of idling for a few minutes before adding water, mixing tube is fully moist, the remaining water evacuation.
When stirring first set, losses due to the viscosity of mortar wall, therefore, dosage should be according to the mixing ratio of stones in half.
Starting from the second set, at a given mix feed.
3.6 time control: the shortest time according to table concrete mixing 4-28 control.
Concrete mixing time (s) in table 4-28
Mixer discharge capacity (l)
<250 250~500 >500
Forced 60 90 120
Since falling 90 120 150
Forced 60 60 90
Since falling 90 90 120
Note: l. Concrete mixing means the shortest time since all the material into the mixing drum, to start unloading time;
2. when additives are mixed with, mixing time should be extended appropriately;
3. winter construction of mixing time should be taken when mixing time of 1.5 times at room temperature.

3.7 out of material: the material at, a little discharge, visual appearance quality of the mix, such as Visual inspection before they can discharge. Each concrete mix must be made.
3.8 concrete mixing quality checks:
3.8.1 check mixing concrete the varieties, specifications and quantity of raw materials used, every work shift at least twice.
3.8.2 checking concrete slump and workability, every work shift at least twice. Concrete mix should be and mix, same color, good flowability, cohesion and retention, no bleeding, not segregation. Does not meet the requirements, should find out the reasons to adjust.
3.8.3 in each class of work, when changes are due to outside influence of mix proportion of concrete (such as rain or raw material changes), you should check in time.
3.8.4 concrete mixing time should be checked at any time.
3.8.5 indwelling blocks as follows:
3.8.5.1 each mix 100 and no more than 100m3 with Proportioning of concrete samples shall not be less than one.
3.8.5.2 each work class mixing proportion of concrete is less than 100 sets, the sample shall not be less than one.
3.8.5.3 concrete structure, each cast floors with concrete mix, the sample shall not be less than one.
3.8.5.4 impermeable concrete requirements, should be required to retain impermeability test block.
Should be retained for at least one set of standard specimen per sample, sample cured in same condition retained the number of groups. According to technical requirements. In order to ensure retention of specimens representative, should end after the third set to stirring 30min before sampling.
Winter construction of concrete mixing 3.9:
3.9.1 continuous stable 5d outdoor temperature below 5 , mixing concrete winter construction measures should be taken, and the sudden drop in the temperature of the freezing measures should be timely.
3.9.2 preparation of winter construction of concrete, should be preferred Portland cement and ordinary Portland cement, cement grade should not fall below No. 425, minimum cement dosage should not be less than 300kg/M3, water/cement ratio should not be greater than 0.6.
3.9.3 winter use chlorine-free antifreeze salts, freeze against demanding concrete. Appropriate use of air-entraining agent or air-entraining water-reducing agent. If the antifreeze is mixed with chlorine salts, should strictly control the volume, and strictly enforce the provisions relating to antifreeze is mixed with chlorine salts.
3.9.4 aggregates for concrete must be clean and shall not contain ice, snow, ice and frost cracking of minerals.
3.9.5 winter should give priority to the use of hot water method for mixing concrete. Water and heating temperature should be determined according to the thermal calculation of aggregate, but shall not exceed the provisions of table 4-29.
Maximum temperature of mixing water and aggregate table 4-29
Aggregate project mixing water
Labels smaller than No. 525 ordinary Portland cement and slag Portland cement 80 60
Label larger than No. 525 ordinary Portland cement and slag Portland cement, 60 40

Cement directly heated before use and should be transported inside a greenhouse store.
When the aggregate is not heated, water can be heated to 100 degrees, but the cement should not direct contact with more than 80 ¡æ water. Feed first input aggregate and heat the water, and then put into cement.
3.9.6 before concrete mix, hot water or steam cleaning the Blender, mixing time should take the temperature of 1. 5 times. Concrete mixing machine temperature should not be below 10 , casting temperature shall not be less than 5.
3.9.7 winter concrete mixing quality checks in addition to complying with the provisions of article 3.8, but should carry out the following checks:
3.9.7.1 check the admixture dosage.
3.9.7.2 measurement of water and additive solution the temperature of the heating temperature and adding mixers and aggregate.
When discharged in 3.9.7.3 measurement of concrete mixer temperature and pouring temperature.
More than check each class should at least be measurement checks four times.
3.9.7.4 retaining concrete block addition should meet the 3.8. the provisions of article 5, should be not less than two additional groups and structure of sample cured in same condition, respectively, for inspection before freezing of concrete strength and maintenance 28D of concrete strength at room temperature.
4 quality criteria
4.1 project:
4.1.1 cement used in concrete, aggregates, admixtures, mix size, variety and quality in compliance with the relevant provisions of the standards.
Inspection methods: inspection raw material factory certification, test report.
4.1.2 concrete strength evaluation should meet the requirements.
Methods: checking reports of pressure test for strength and strength estimation of concrete block material.
4.2 Basic project:
4.2.1 should be and mix of concrete, the same color, has a good workability.
Inspection method: Visual check.
4.2.2 fresh concrete slump should meet the requirements.
Methods: field measurement and check records.
4.2.3 when winter construction, water, aggregate heating temperature and temperature shall conform to the requirements of concrete mixing machine.
Methods: field measurement and check records.
5 quality problems to be noticed
5.1 uneven strength or strength of concrete strength deviation, is frequent quality problems is the quality problem of structural safety. Preventing quality issues need to be integrated, in addition to concrete delivery, placement, maintenance and other things need to be strictly controlled in concrete mixing stage with special attention. To control the quality of raw materials. We should earnestly implement the mixture ratio, strict ingredient metering of raw materials.
5.2 quality problems of concrete cracks often occur. Due to many reasons. In the mixing stages, if mud content of sand, stone, large amount of water, the use of obsolete and excessive amount of cement or cement and, may result in shrinkage cracks. In the mixing stages, is to strictly control the quality of raw materials, seriously implement the mix, strict measures.
5.3 concrete mix of poor and vulnerable, slump does not meet the requirements. Cause this type of quality problem is in many ways. Water cement ratio most of them; the second is the stone of poor grade, pins, plate-shaped particles with too much; the third is mixing time is too short or too long. Solutions from the above three aspects.
5.4 winter construction of concrete is prone to frost damage. Solution is to seriously implement relevant provisions in the winter, in the mixing phase of the heating of aggregates and water temperature, ensure coagulation for the machine temperature.
Note 5.5 admixtures for cement, admixtures, stored for safe keeping. Cement cement, rain and damp; cement factory for more than three months should be the test. Admixtures and mixtures in order to prevent damp and bad, to specifications, respectively, in order to prevent misuse.
6 quality records
This standard shall meet the following quality records:
6.1 cement factory prove quality.
6.2 cement into the test report.
6.3 quality additives proven.
6.4 additives enter the amount of test reports and test reports.
6.5 quality mixtures proved.
6.6 test mixture into the test report and the content of the report.
6.7 test report of sand.
6.8 stone test report.
6.9 notice of concrete mix.
6.10 strength concrete block pressure test report.
6.11 strength evaluation of concrete records.
6.12 concrete logs (including Shi Rizhi in winter).

6.13 concrete open identification.