Formwork concrete shear wall structure
construction
1 scope
This technology is applicable to masonry,
exterior brick mold, plate internal model structure column and ring beam and
slab concrete placement process.
2 construction preparation
2.1 materials and tools:
2.1.1 cement: 325~425, slag Portland cement
or Portland cement.
2.1.2 sand: use coarse sand or sand,
concrete C30, when the clay is less than 5%.
2.1.3 stones: structure column and ring
beam diameter: 0.5~3.2cm pebbles or gravel; Board size 0.55~1.2cm of fine
aggregate, concrete C30, when the clay is less than 2%.
2.1.4 water: clean water not containing
impurities.
2.1.5 admixtures: selected according to
requirements such as early-strength admixture, superplasticizer, mixing amount
determined by the laboratory.
2.2 operating conditions:
2.2.1 concrete mixing ratio determined by
the lab, mix order consistent with the on-site use of materials.
2.2.2 template solid, stable, levels,
dimensions are in line with design requirements and template gap more than
rules, to plug the tight and go through preflight procedures.
2.2.3 reinforced through hospital
procedures.
2.2.4 structure, ring beam Cha loose
concrete and mortar should be removed, template clutter to clean up.
2.2.5 at room temperature, before concrete
pouring, brick walls, some shoe trees in advance watering moist, but not water.
3 operational processes
3.1 process:
Ready concrete mixer → → → transport → concrete,
concrete vibration concrete curing
3.2 concrete mixer:
3.2.1 according to determination of the
moisture content of sand, stone, adjust the mixing ratio of water, rain should
increase the number of determination.
3.2.2 mixer weight per dosage of various
materials and the wagon which are fixed well cement (bulk), sand, and stone all
scales of scalar. Scales should be regular checks, maintenance, in order to
ensure accurate measurement. Measurement accuracy: ± 2% of cement and
admixtures, ± 3% aggregate, water, additives ± 2%. Blender shed should set
concrete signs.
3.2.3 mixed mixer to empty before
commissioning, normal before the official charge mixing.
3.2.4 sand, gravel, cement (in bulk) must
be strictly according to the required quantity weighed separately, must also be
strictly measured by adding water.
3.2.5 mixing procedure: General stone, pour
cement, after sand, add water. Admixture in cement when I joined. Additive and
water added.
3.2.6 concrete stirring first set, can be
appropriate when loading less than stones or increase the cement and water.
3.2.7 concrete mixing hours 400L fell mixer
should normally not be less than 1.5min.
3.2.8 the slump, general control in 5~7cm,
each class should be measured twice.
3.3 concrete transport:
3.3.1 concrete mixer after discharge,
should be transported by dump trucks, trolleys or skip to the placement
locations. Delivery of concrete, preventing the loss of slurry. If the
segregation should be placing artificial secondary sites mix.
3.3.2 finished pouring concrete mixer after
unloading duration, when concrete C30, and temperatures above 25 ° c must not
be greater than when 90min,C30 above shall not be greater than 60min.
3.4 concrete pouring and tamping:
3.4.1 roots of constructional column
construction joints, first before pouring in Pu 5cm mix the same amount of
cement mortar and concrete or stone concrete.
3.4.2 casting method: used cranes skip when
feeding, you should skip down to a distance of the 50~60cm plate, the concrete
landing on an iron plate, then poured into the mold with a spade, unloaded the
skip is not applied directly to the concrete into the mold.
3.4.3 when concrete structural column,
first insert the vibrator base and roots, making it vibration and then filled
with concrete, should be stratified placement, vibrating, each ply not
exceeding 60cm, edge cutting edge vibration, usually pouring height should not
be more than 2m, such as to ensure that poured dense, pouring each time.
3.4.4 vibrated concrete: constructed string
is vibrating, vibrator close wall insert. Vibrated concrete ring beam,
vibrator-concrete surface should be oblique, oblique to the vibration. Concrete
vibrating plate joints, 30mm should be used a small vibrator. Vibrating layer thickness
should not exceed 1.25 times of the vibrator.
3.4.5 when pouring concrete, to protect
steel and outer brick walls, waterproof wall panel structure, without the
damage, the specialist check for deformation of formwork, reinforcement, and
shift; bolt, lever is loose, fall off; found leakage phenomenon, assign
specific maintenance.
3.4.6 surface smoothing: ring beam and slab
concrete vibrating finish time, then use wood trowel to compact, smooth.
Surface must not have loose concrete.
3.5 curing: concrete pouring out 12h,
should cover the concrete and water conservation. When watered at least twice
daily, curing period shall not be less than 1d.
3.6 complete concrete construction records,
production of concrete blocks.
4 quality criteria
4.1 guarantee project;
4.1.l cement, sand, stone, additives must
comply with the specifications and the relevant provisions of the standard,
factory certificate, the test report.
4.1.2 concrete Proportioning, mixing,
curing and treatment of construction joints, in line with the norms.
4.1.3 standard on concrete samples,
production, maintenance and testing, evaluation of concrete strength and meet
design requirements.
4.2 Basic project:
Vibration compacting of concrete, without
dew the honeycombs, hole reinforcement and crack and slag.
4.3 allowable deviation, as shown in table
4-31.
Tolerance (mm)
Brick and concrete multi-storey mode
1 column centerline location 10 10
2 column mismatch between layers of 8 8
3 elevation (height) or ± 10 ± 10 level
standard
4 section dimensions +8-5 + 5-2 ' check
Check every 10 10 2m supporting plate
10m vertical 5 15 15
10m 20 20
Surface flatness of 8 4 6 2m on foot and
wedged feeler Gage check
5 finished product protection
5.1 placing concrete shall not pollute
water brick.
5.2 when vibrated concrete shall not touch
steel, embedded, preventing displacement.
5.3 bend reinforcement bars, step on, when
you transfer or release, adjustment, patched in a timely manner.
5.4 scattered on the concrete should be
cleared in a timely manner on the template.
6 quality problems to be noticed
6.1 material inaccuracy of concrete:
influence of concrete strength and construction to check before, good
correction scales, truck weighed, water must be strictly controlled.
6.2 concrete appearance of honeycomb,
cavities, exposed ribs, slag and other defects: false vibrated concrete, leak,
and reinforced protective pad is missing, especially reinforced position within
the joints should be carefully checked, identify problems and deal with.
7 quality records
This standard shall meet the following
quality records:
7.1 materials (cement, sand, stone,
admixture, admixture) factory certificates, test reports.
7.2 test report concrete block.