Mixing of lightweight aggregate concrete
1 scope
Technology standards for the construction
of lightweight aggregate concrete mix preparation, processes, quality standards
and quality inspection, and more.
This technology is applicable for
industrial and civil buildings of lightweight aggregate concrete mixing on
site.
2 construction preparation
2.1 materials and equipment:
2.1.1 cement: cement, label, factory and
trademark should comply with the notice requirements of concrete mixing ratio.
Cement factory certification and entry test.
2.1.2 sand: sand particle size and origin
should meet the requirements of concrete mix order. Clay in the sand; when the
concrete strength class ≥ C30, the sediment should be ≤ 3%; when the
concrete strength grade <C30, the clay should be ≤ 5%. Content
of mud in sand (greater than 5mm of pure clay): when the concrete strength ≥ C30, should
< 1%; when the concrete strength grade <C30, ≤ 2%. Sand
should have the test report form.
2.1.3 light-weight aggregate: light weight
aggregate (ceramsite or pumice, etc), size, origin should comply with the
notice requirements of concrete mixing ratio. Light-weight aggregates should
have quality certificates and entry test reports. Must test items are:
aggregate sieve analysis test aggregate density; cylinder compressive strength
of coarse aggregate; water absorption of coarse aggregate test.
Light coarse aggregate gradation shall meet
the requirements in table 4-30, the natural distribution of void fraction
should not be greater than 50%. The maximum particle size should not be larger
than 20mm. Its clay content is less than 2%.
Light coarse aggregate gradation table 4-30
Opening size DMin (5) 1/2dmax (10), DMax
(20) 2dmax (2x20)
Sphere and single sieve residue accumulated
over 90 no regulation of size ≤ 10 0
Ordinary mixed grade ≥ 90 30~70 by
weight ≤ 10 0
Mix gradation of gravel-type (%) ≥ 90 40~60 ≤ 10 0
Light fineness modulus of sand should not
be greater than 4.0, which today than 5mm should not be greater than 10% of
sieve remainder (by weight).
The density of light-weight aggregate,
lightweight coarse aggregate strength of cylinder compressive strength and
should comply with the design requirements.
Light and natural water absorption of light
weight coarse aggregate rate provisions other rate of water absorption of light
weight coarse aggregate 1h is less than 22%.
2.1.4 water: potable water should be used.
Other water quality must meet the standards for concrete mixing water (JGJ63
189) requirements.
2.1.5 admixtures; lightweight aggregate
concrete admixtures, used by manufacturers and brands, the mix order
requirements. Admixtures shall have certificates of quality and use, and should
be in for a test report on indicators. State regulations require certification
of products, should also be permitted documents. Additives must have volume
test.
2.1.6 mixed materials (primarily fly ash at
present): varieties of mixed materials, used by manufacturers and brands, the
compound form of requirements. Hybrid materials have certificates of quality
and use, and should approach the test report. Mixed material must have a volume
of tests.
2.1.7 main equipment: sand lightweight
concrete should be compulsory mixer takes precedence, since fall mixer. Light
concrete forced mixer should be used. Metering equipment commonly used scales
or electronic measuring equipment. Measuring meter, time relay can be used to
control the water flow meter tube or tank water level marks the meter. Feeding
equipment such as two-wheeled carts, forklifts, loaders and of coarse and fine
aggregate hopper and supporting other devices. Field test instruments, such as
slump test equipment, test mode.
2.2 operating conditions:
2.2.1 laboratory has issued notice of
lightweight aggregate concrete mix, and convert each actual mix used, and
published in place of mixing ingredients on the plate.
2.2.2 use of raw materials have been
examined, all should conform to the mix order request.
2.2.3 mixer and its supporting equipment is
flexible, secure, and reliable. Power supply and distribution system in
accordance with requirements, safe and reliable.
2.2.4 all verification of measuring
instruments must have valid identification. Clean platform below and the
surrounding sand, stone, measuring instruments sensitive and reliable, and
press set mix special points.
2.2.5 administration personnel to the job
the team mix, operating procedures and safety technology gives the low-down.
2.2.6 need lightweight aggregate concrete
pouring works site has been hidden inspection, preflight procedures,
lightweight aggregate concrete request has been approved by the relevant
managers.
2.2.7 new release of lightweight aggregate
concrete mix, identification should be opened. Opening stock of the work
carried out and meets the requirements.
3 operational processes
3.1 basic flow:
Lightweight aggregate concrete production
process flow chart
3.2 the stacking and storage of raw
materials:
3.2.1 light coarse aggregate size-stacking,
and waterproof and drainage measures in order to prevent moisture changes.
Mixed size-when stacking, stacking height should not be more than 2m to prevent
particle size segregation, gradation balance. When used with normal aggregate,
should make weight aggregate storage respectively, non-hybrid, to ensure
accurate ingredients.
3.2.2 cement, admixtures and additives
should be protected against rain, moisture-storage warehouse, to prevent cement
induration, changes of moisture content of admixtures, powdered additive
failure, liquid additive concentration.
3.3 sampling measurement and metering of
raw materials:
3.3.1 measurement of light-weight
aggregate: suitable for volume measurement, weight measurement can be adopted,
but we must strictly testing moisture content of aggregate, removing moisture
content of its provisions other than the weight of water in order to ensure
accurate ingredients. Ordinary sand weight measurement. Volume metering, you
must use a special measuring cart or special volume meter, each disk must be
strictly measured.
Weight measurement, use a cart must be
weighed, unloaded up less. Hopper and ancillary measuring equipment, with
automatic or semi automatic material, need to adjust the amount of aggressive
door switch in advance, in order to ensure accurate measurement.
Measurement of light-weight aggregate
allowable deviation of ≤
± 3%.
3.3.2 cement measure: when using bagged
cement, have to press the incoming batch of random measurement. Weight per
batch entry should check 10 bags of cement, and calculates the average of the
actual weight of each bag. Calibration weight is less than up to open the
package, or subject to the actual weight per bag of cement, adjust the coarse
and fine aggregates, amount of water and other materials, according to the
given proportion to redefine each mix. When bulk cement is used, each accurate
weighing. Cement-weighting the deviation should be allowed to ≤ ± 2%.
3.3.3 measurement of admixtures and
mixtures: with bags of powdered admixtures and mixtures should be entry check
10 bags per batch weight, and measure the average weight of each bag, is
smaller than the calibration weight to be replenished. For bulk or packaged
admixtures, construction mixture ratio measuring the amount of each advance in
its repository, and in the form of small packages shipped to stir and set
aside. Liquid admixtures to ad-mix, with a hydrometer to check the
concentration, graduated cylinder measure. Admixtures and mixtures of ≤ ± measurement
deviation should be allowed to 2%.
3.3.4 mixing water must flow meters measure
reading measurement, pipe or water tank water level mark the meter. Every
measure allowed deviation of ≤
± 2%.
3.4 the feeding process of lightweight
aggregate concrete mixing procedure:
3.4.1 lightweight aggregate concrete mixing
of the water absorption rate of less than 10%, and secondary material
processing procedures should be used. Aggregate contract 1min 1/2 water into
blender and mix, then add cement composite seconds, then add the remaining
water and admixtures, continue stirring until 2min, feeding and mixing
procedure for this method is:
1/2 total water consumption
Coarse aggregate 1/2 total water
consumption of cement, admixtures
Stir mixture with water and aggregate
concrete mix
Fine aggregate
Lightweight aggregate concrete mixing water
absorption greater than 10%, should adopt the wet aggregate feed and mixing
processes. Light coarse aggregate prior to mixing the wet, coarse aggregate,
cement, fine aggregate into Blender in the order summary, mixing Drum mixing
0.5min into Blender together again, and then with water and additive mixing
2.5min, feeding and mixing procedure for this method is:
NET consumption of water → coarse
aggregate admixtures
Cement mix concrete mix
Fine aggregate
3.4.3 using down mixer feeding and mixing
processes of the program are: to join the 1/2 per cent of the total volume of
water, then add the coarse and fine aggregates and cement mixing Lmin, then add
remaining water, stir 2min, feeding and mixing procedure for this method is:
Coarse aggregate 1/2 total water
consumption water consumption 1/2
Mixture of cement mix concrete mix
Fine aggregate
3.4.4 using forced mixer feeding and mixing
processes are: investment and coarse aggregate, cement, fine aggregate, Lmin
stir, then add water to continue mixing at least 2min. Feeding and mixing
procedures for this method is:
Total water consumption of coarse aggregate
admixtures
Stir the mixture of cement mix concrete mix
Fine aggregate
3.5 first mixing concrete problems of:
3.5.l before mixing concrete, add water to
idle for a few minutes, be fully after wet mixing drum, water drain.
3.5.2 when first mixing concrete, cement
mortar mix damage caused sticky wall. Be taken pre-mixing method, that is given
with a design of lightweight aggregate concrete mix proportion of raw materials
into the mixer, which should be extended more than 1 time, to be part of the
mortar paste on the wall in a blender, then rest of mixture unloading
(secondary feed mix used), then you can mix properly.
3.6 time control and inspection:
lightweight aggregate concrete mixer-the minimum amount of time than the
conventional concrete mixing time should be extended 60~90s, generally 180s;
when mixed with additives, and mixing time should be extended appropriately.
3.7 out of material: material should be a
little discharge, visual appearance quality of the mix, such as Visual
inspection before they can discharge. Each mix must be made.
3.8 lightweight aggregate concrete mixing
quality checks:
3.8.1 check the mixing of raw materials
used in lightweight aggregate concrete varieties, specifications and content of
every work shift at least twice. Rain during construction on the moisture
content of lightweight aggregate to increase inspection and determination of
the number.
3.8.2 check light aggregate concrete slump
and workability in pouring stations, each class more than twice. Rain periods,
and changed the level of lightweight concrete winter construction, to
strengthen the detection times.
3.8.3 in each class of work, when
lightweight aggregate concrete due to outside influences have changed, should
be checked in a timely manner.
3.8.4 lightweight aggregate concrete mixing
time should be checked at any time.
3.8.5 check the appearance quality of light
weight aggregate concrete mix should be, mixing, color consistency, good
flowability, cohesion and retention, no bleeding, not isolation. Does not meet
the requirement, the reasons should be checked, adjusted in a timely manner.
3.8.6 indwelling blocks as follows:
Mixing 3.8.6.1 each 100 and not more than
100m3 of mix proportion of concrete, the sample shall not be less than one.
3.8.6.2 each class mixing proportion of
concrete is less than 100 sets, the sample shall not be less than one.
3.8.6.3 for in-situ concrete structure,
each cast floors with concrete mix, the sample shall not be less than one.
3.8.6.4 should be retained for at least one
set of standard specimen per sample, sample cured in same condition retained
group, according to technical requirements.
Ensure indwelling blocks representative
should be before the end of the third set after mixing concrete to mix between
the 30min sample.
3.9 winter construction of lightweight
aggregate concrete mixing: Meanwhile, demand for raw materials, mixing time,
raw material heating, mixing tank temperature requirements, should earnestly
implement the standard 3.9 in concrete mixing process and the code for
construction and acceptance of concrete structures.
3.9.1 aggregate shall not contain snow and
a frozen ball.
3.9.2 mixing of lightweight aggregate
concrete in winter should be used on the secondary, secondary mixing processes
(see section 3.4.l of the mixing process) in order to improve the workability
of light aggregate concrete.
3.9.3 should be noticed in winter testing
moisture content of aggregate, timely adjustment of water, given the slump in
time to different control value. Slump increased 4~6cm should generally be
higher than room temperature, to ensure its good flowability, cohesion and
retention.
4 quality criteria
4.1 project:
4.1.1 lightweight aggregate concrete used
in cement, aggregates, admixtures, specifications of mixture, variety and
quality must meet the construction standards and regulations.
Inspection methods: inspection raw material
factory certification, test report.
4.2.2 assessment of strength of lightweight
aggregate concrete block, you must press the standard of inspection and
evaluation of concrete strength (GBJ107 187) of the sampling system.
Check: check strength of lightweight
aggregate concrete block pressure test reports and strength evaluation of
materials.
4.2 Basic project:
4.2.1 should be and mix of light aggregate
concrete, the same color, has a good workability.
Check method Visual check.
4.2.2 slump of lightweight aggregate
concrete mixes should conform to specifications or mix order requirements.
Methods: field measurement and check
records.
4.2.3 winter water, aggregate heating
temperature and concrete mix temperature should meet the requirements of
construction specifications.
Methods: field measurement and check
records.
5 quality problems to be noticed
5.1 mix incomplete mixing. Different
colors: the main reason is the lack of time.
Winter construction and in particular by
ensuring the additive, and sufficient time to mixture stirring.
5.2 poor and vulnerable: its mix of loose
non-stick together, rising segregation of aggregates, or mix to form a mission
should not be poured. Main reasons are: Lightweight Aggregate Gradation worse;
sand percentage too small; raw material metering inaccuracy; or short mixing
time. Should be carefully overcome these deficiencies, in order to ensure good
workability of the mix.
5.3 mixing the slump is not stable. Mainly
due to water have not been accurate, coarse and fine aggregates failing
determination of moisture in failing to adjust the water. Followed by water
measurement is not accurate, water consumption fluctuating. This phenomenon
must be overcome to ensure the quality of mixture.
5.4 when you use the additive should be in
aggregate after absorbing water, add. In order to avoid excessive absorption of
aggregate porosity on admixture. Particularly liquid admixtures, used when
unexpected wet aggregate, additives and residual water should be added. Liquid
made from powdered admixtures according to law before joining or cement
mixtures added to ensure mixing.
6 quality records
This standard shall meet the following
quality records:
6.1 cement factory-certified certificate or
test.
6.2 cement the second interview.
6.3 test report of sand.
6.4 lightweight fine aggregate test report
form.
6.5 light coarse aggregate test report
form.
6.6 admixture product certification and
quality certificates.
6.7 additives enter the amount of test
reports and test reports.
6.8 fly ash factory certificate.
6.9 fly ash tests report.
6.10 concrete mix order.
6.11 concrete logs (including Shi Rizhi in
winter).
6.12 concrete open identification.
6.13 strength concrete block pressure test
report.
6.14 concrete strength evaluation records.
Because of the war, many people become homeless. I can't do it well. Please help me.my PayPal is xhhnet@163.com.
No comments:
Post a Comment