Decorate completely manual---The first chapter

The first chapter begins from buying
First, building inspection
After got the house, a lot of people don't know how to check and accept. Some people think that the station office has already acceptance, the owner and acceptance. Actually, in many cases, you don't acceptance test, houses have to be, just found the problem before signing, you will be more convenient to pursue the responsibility of the developer.
As a layman, acceptance of the house?

1. Check the wall
Don't know since when, see walls should become the primary problem of building inspection. I have seen a house, to send
Is the window on a rainy day or sweating, asking, just know the whole building almost every window walls ooze water below. Typhoon comes, what is more scary. So, had better be in front of the house delivery, under the heavy rain the next day to check on. Wall at this time if there is a problem, is almost no hide something.
Wall in addition to water penetration, there is a problem, is whether there is a crack. Have a friend who reflect his walls have a form of crack, then ask developers, just know originally is left at the construction elevator freight, later stoppage time careless handling, so that future trouble.
2. Check hydropower
The first is to check whether through the house of water and electricity. , of course, for some senior decoration, the majority of plumbing, electrical, late to change, so it is sometimes the key content is not, but if you do not intend to replace the water pipe, wire, so these things must be carefully acceptance.
Check wiring, in addition to see if electricity, mainly is to look at the wire is in compliance with national standards, wire section area is in line with the requirements. In general, the home of wire should not be less than 2.5 mm squared, air conditioning line more squared, with up to 4 mm, otherwise when using air conditioning, soft easy overheating.

3. Check the waterproof
Here is waterproof, refers to hutch defends the waterproof. , of course, the delivery of the house, there are some declared in advance to do waterproof processing, which requires when decorating, do it. If at the time of delivery has been made waterproof processing, you need to verify the quality of waterproof. If you don't give it a try before decorate, again after you decorate good found leaking, then maintenance engineering. You have to dismantle have refurbished the ground to make a new layer of waterproof layer.
Acceptance of waterproof measure is: the use of cement mortar in a sill plugging in the door of the kitchen, toilet, take a plastic bag to cover the sewer or drain and bundle, and then in the kitchen, toilet ground water, shallow line (about 2 cm high) water. About the owner of the downstairs, view its at home after 24 hours, the smallpox of kitchen, toilet ooze water.
4. Check pipeline
Of pipeline, the original drainage or discharge pipes, especially the balcony place such as drainage outlet. Acceptance, with a water appliances, pouring water into the drain, see if the water run smoothly. Why do you want to check and accept this? Because in the project construction, there are some workers in clean tend to pour some cement slurry into the drain, if these cement is sticky, can elbow jams, drainage caused difficulties.
There is a kind of situation, is to see if there is water drainage pipe against the stench, elbow. According to the experience, if there is no water drainage pipe against the stench, elbow, so the whole building quality also have to be at a discount. Why the drainage pipe need the elbow? Because bend water storage, the smell from the lower pipe will dismount, locked in the aquifer; Not bend, laundry room and the toilet drain will send out an unbearable smell. Developers that may have to use against the stench, floor drain, the engineering practice proves that against the stench, floor drain far cannot satisfy the actual needs. This small place, often the most can reflect the construction quality of builders.
5. Check horizon
Check horizon is the indoor ground measure furthest from the door and the door mainland level error below. Check horizon, and many times can also reflect the developer of the quality of construction. Because as the owner, it is all but impossible to acceptance of the main structure, then it can only from these details to see the quality.
Here is introduced a simple method. Go to hardware store to buy a small transparent pipe, length about 20 m, filled with water. First in the door from the ground 0.5 m or 1 m drawing a logo, then the water level of the pipe to the logo height, and someone to fixed in the position. Move the other end of the pipe to the farthest away from the door of the room. And then look at the height of the pipe at the, make a mark. With the measurement - how high is the sign off the ground. The two height difference is the level difference of the building. You can also through this way so on, measure the degree of difference of the level of the whole house.
In general, if the difference in the 2 cm is normal, 3 cm is acceptable range; Beyond this range,
You have to take note.
6. Check the height
If you have the contract terms. Then you should measure the height of a downstairs. Method is very simple, the ruler along the two walls of the internal Angle measurement. You should measure the indoor places. In general, the height of 2.65 m is acceptable range; If less than 2.6 m, we must consider, this house will make you have to live in a repressive environment in the future.
Doing short stories for developers, is a very effective way to save costs. (1) to reduce the total capacity, so that the basic cost can save a part of. (2) although each layer reduced to 10 cm, but overall, also a lot of cost savings, especially for piece of residential development. (3) in a certain height, the lower layer can build more layers.

7. Check doors and Windows
Here is given priority to with acceptance window in particular. Acceptance is the key to the window and balcony door seal. Acceptance most troubling thing is that the sealing of the window in the pouring rain, only can try out good or bad, but can generally by looking at the sealing strip is complete, firm this to confirm. The balcony door general level difference inside and outside to guard. Ever seen a case, the level of the balcony and indoor levels should, in this way, it is hard to avoid rainwater seeping into the heavy rain day.
Other projects.
In fact, in addition to the above project, other acceptance needs to have more professional knowledge. If possible, you may wish to take a friend familiar with engineering to acceptance houses. In addition, you can only rely on the quality inspection department.