The acceptance of the, decorate
1, water and electricity line acceptance. Owner should pay attention to the operation of the water, electrician whether professional, to check whether all the transform circuit, the layout is reasonable, whether the operation specification, and to confirm the actual size line modification. Only line change, embedded grey worker can sealing wall, hang a putty.


2, carpentry size acceptance. Woodworking foundation, after finishing the condole top of the room and gesso line are completed, kitchen and toilet metope brick is good, the metope paint has finished two putty. At this time of the acceptance of the work owner to check the drawings carefully, confirm the size of each part.

3, carpentry quality acceptance. All of the wood veneer stick good, finished wood glue nail. The owner check should focus on wood color and texture as well as large areas of smoothness and gap is uniform.

Second, after the completion acceptance
1, the power line. Circuit laid to conform to construction regulations and safety standards, the electrical outlet is apart from the ground not less than 30 cm, three line socket grounding line, line to line laying kitchen and air conditioning, total brake fitted with anti leakage switch, lamps and lanterns is installed firmly.



2, doors and Windows. Switch, door frames, window frames and glass peripheral sealing is good.
3, on the ground. Floor tile smooth, texture clear, uniform color, reticle horizontal, vertical, smooth solid, flat-fell seam floor is straight uniform, paint colour and lustre is consistent, without scratches.
4, metope. Wallpaper paste firm, seams tightly, complete patterns, pattern match, seam and neat without flash, uniform coating level off, without AoTuGan, without off color, not grey.
5, water supply and drainage facilities. Water supply pipe leakage, switch valve is in good working order; Drainage unobstructed, no leakage and water phenomenon.
6, paint. Surface smooth, feel is good, enough oil, without nail eyes, mark, burr and color difference.
3, special acceptance "take cover engineering"
In engineering construction sequence, the procedure, the work has ended, and will be covered next procedure, and unable to check parts, referred to as "take cover engineering".

1, for the whole or partial collapsing roof, make condole carries on the "off". This is because the ceiling and floor, keel and corrosion panel is bad, or caused by the bearing is too large. According to regulations, ceiling keel shall not distort and deformation, keel should be solid and reliable, installed around the horizontal deviation shall not be more than 5 mm. The condole top of more than 3 kg or ceiling fans, can hang on the ceiling keel, and should be on the hook. If use plasterboard condole top veneer, its thickness should be 9 mm.
2, the balcony to insecure encapsulation fixed collapsing. In encapsulation balcony, doors and Windows must be horizontal even vertical, height consistent, no deformation, welding, fracture appearance. The gaps between the frame and wall body shall be full dense.

3 roof damage, pipeline leakage. Kitchen and toilet after the completion of the construction of the fluctuation conduit, must after water flooding and pressure check, no run, run, drip, leak is pass.
4, dark bury line does not pass. According to regulations, dark bury the line cannot be directly into base ash layer, rather than on the outside of the wire casing. The casing wires cannot distort and connectors. In line when installation, must abide by the "line of fire into the switch, the zero line into the lamp holder", "left zero right fire, grounding on the" rules