Underground synthetic polymer (ethylene propylene diene monomer) rubber waterproofing construction technology

1 scope
This technology is applicable for industrial and civil construction underground polymer EPDM waterproofing membrane underground waterproofing layer paving construction.
2 construction preparation
2.1 materials and requirements:
2.1.13 EPDM waterproofing membrane:
2.1.1.1 specifications: thickness 1.2mm,1.5mm; width: 1.0M; 20.0M.
2.1.1.2 main technical properties: tensile strength 7MPa; elongation > 450%; low temperature embrittlement temperature-40 below; watertightness (MPaxmin) >0.3x30.
2.1.2 end of polyurethane rubber used as primary treatment agent (the equivalent of brushing cold oil), the material is divided into two groups, as Brown colloid, b for black gel.
2.1.3 CX-404: used for coil with the base paste is yellow cloudy gel.
2.1.4 butyl adhesive: used to roll joints, points a and b groups, group a for yellow and turbid colloidal, b had a black gel. When in use by the 1:1 mixing.
2.1.5 polyurethane coating material: used for added to seal the seams, material divided into two groups, group a Brown colloid, group b black gel.
2.1.6 polyurethane caulk used to roll your head sealed.
2.1.7 other materials:
2.1.7.1 xylene: scrubbing tool used for dipping.
2.1.7.2 ethyl acetate: for washing hands.
2.2 major appliances:
2.2.1 base treatment equipment: high voltage hair dryers, flat spade, wire brushes, brooms.
2.2.2 material containers: drums.
2.2.3 line equipment: scale, small line, color chalk bag.
2.2.4 cutting roll material: a pair of scissors.
2.2.5 brushing tools: scroll brushes, brush, roller, scraper.
2.3 operating conditions:
2.3.1 in high groundwater conditions spread before pasting the waterproofing layer should be lowering of ground water level, good drainage, reduce groundwater from the waterproof layer bottom level 300mm, and to protect the waterproof layer construction finished.
2.3.2 tile surface should be flat and smooth waterproof layer of grass-roots, the grass-roots level must be foreign body, sand bumps clean dust and other debris, without hollowing sugaring, peeling, cracking and other defects.
2.3.3 primary should be kept dry, the moisture content should be less than 9%, corners should be rounded arc of yin and Yang.
2.3.4 waterproofing materials used are flammable materials, storage and operation should be cut off from the source of fire, fire prevention work.
3 operational processes
3.1 process:
Grass-roots cleanup polyurethane coat of polyurethane adhesive preparation primer special parts add (additional)
Sheet paste surface coating surface coating of grass-roots tiling waterproofing roll-roofing
Protective layer
3.2 basic cleanup: unqualified acceptance of the base before construction debris, dust clean.
3.3 polyurethane adhesive preparation: polyurethane material: ethyl =1:3 (weight ratio) percentage of match, mixing evenly coat construction.
3.4 coat of polyurethane adhesive: prior to the construction of large area coating, Yin Kok, onion and other complex parts even brushing it again then use a long order large brush brush, brush the adhesive thickness uniform, not threadbare. Brushing adhesive 4H dry, when you touch the non-stick, can be carried out the next working procedure.
3.5 special added to site:
3.5.1 supplements coating: polyurethane coating waterproofing material divided into two components, a: b =1:1.5 to weight ratio combined with mix, onion in the floors, walls, expansion joints, corner of yin and Yang, even brushing a layer of polyurethane coating, as additional layer of waterproof weak parts, coating curing immediately after the next process.
3.5.2 additional construction: design requirements of special parts, such as yin and Yang angle, tube, use EPDM membrane paving layer.
3.6 paving EPDM waterproofing layer
3.6.1 before paving at the grassroots on the FT line, as criteria for master tile line, make it lay flat.
3.6. Paste the 2 coil coating: coil spread on a clean base, with long brush roll CX-404 evenly, should stay out of the overlapped parts glue. Basic drying drying glue to glue sticky hands.
3.6.3 primary surface coating: Primer dried, cleaned primary surface, uniform with long brush roll CX-404 brushing, brushing should not be too large, then drying glue.
3.6.4 volume material paste: in grass-roots surface and the volume material paste surface has brushing good CX-404 rubber of premise Xia, will volume material with φ 30mm, and long 1.5M of Center rod (round wood, and or plastic pipe) volume good, by two people lift to laying end head, note with line control, location to right, bond fixed end head, then along play good of standard line to another end Pu posted, operation Shi volume material don't pulled too tight, and note direction along standard line for, to guarantee volume material take received width.
3.6.4.1 coil must not be in corner joint of yin and Yang, the joints should be staggered.
3.6.4.2 operation exhaust: each spread a sheet should immediately with a clean brush horizontal force starting from one end of the coil rolling again in order to air out.
3.6.4.3 rolling: excluding air, in order for the coil bonding, rubber-coated iron roller rolling again.
3.6.4.4 joint processing: volume material take received of long side and end head of short side 100mm range, with butyl adhesive bond; will methyl, and b group copies material, by 1:1 weight than tie mixing uniform, with hair brush dipped butyl adhesive, coated Yu take received volume material of two a surface, stay its dry 15~30min can for pressure collection, extrusion air, no has wrinkle folding, then with iron roll rolling a again
Intercepting coil overlapping three-tier parts must be sealed with polyurethane caulk to fill properly.
3.6.4.5 received treatment: waterproof polyurethane caulking around, and brush on a layer of polyurethane coating.
3.7 protection layer: waterproof layer finished, according to the design requirements to cover general plane for cement mortar, or fine-stone concrete cover; elevation for a masonry wall or cement mortar layer, waterproof the outside protective layer can be affixed with a certain thickness of the plate.
Mortar layer when roll-roofing tile, surface brushing polyurethane coated thin sub ballast, to facilitate the protection mortar adhesive.
Waterproof layer construction shall not be carried out in rain, wind, weather, construction environment temperature shall not be less than 5.
4 quality criteria
4.1 project:
4.1.1 membrane and materials must comply with the design and specification for construction and acceptance of rules. Check technical performance indicators for information on product certification, testing, field sampling test.
4.1.2 waterproofing layers and deformation joints, special parts of onion embedded detail practice shall be subject to acceptance, to comply with the design requirements and specification for construction and acceptance of rules.
4.2 Basic project:
4.2.1 grass-roots of the waterproofing layer should be solid. Flat, corners are rounded or obtuse angle between yin and Yang, surface clean uniform coat of primer, no missing coating, and through. Check cover engineering acceptance record.
4.2.2 waterproofing layer paving construction lap, received head and paste firmly tight and no damage, defects such as hollow.
4.2.3 protective layer of waterproofing layer should comply with the design requirements of the practice.
5 finished product protection
5.1 laying good volume material waterproof layer, strengthened protection measures, guarantees from management are not damaged.
5.2 onion through the walls, not collision modification in the construction.
5.3 waterproof layer construction complete, timely protection layer, protective walls.
6 quality problems to be noticed
6.1 joint at volume material take received bad: joint take received form and long side, and short side of take received width partial small, joint at of bond not dense, and empty drum, and received Cha damaged; operation should by program, and play standard line, makes and volume material specifications match, construction in the align line Pu posted, makes volume material take received long side not is less than 100mm, short side not is less than 150mm.
6.2 empty drums to pave and stick coil primary wet, uneven, not clean, primary and coil into empty drum roll laying air exclusion is not completely, or hollow between the coils. Pay attention to the construction of the base should be fully dry, coil layer cannot nest to live air.
When the wind is not suitable for construction, cold glue sticky sand and dust caused by the empty drum.
6.3 at the root of poor waterproofing paste: in this operation, clean carefully with the construction should be clean, paving coil without mouth, Homburg, wrinkles and so on.
6.4 water leakage in the corner: the corner of unwieldy, large. Cha place construction note, protect Cha coil, so lap meets specified width.
7 quality records
This standard shall meet the following quality records:
7.1 waterproofing product certification, field sampling of the second interview information.
7.2 product certification, use of cement materials Proportioning material.

7.3 hidden project check and acceptance and quality inspection and evaluation of information.