Monday, November 14, 2016

Polymer modified asphalt coiled material roofing waterproof construction technology

1 scope
This technology is applicable for industrial and civil construction works roofing the use of polymer modified asphalt coiled material waterproof layer of hot-melt construction projects.
2 construction preparation
2.1 materials and requirements:
2.1.1 polymer modified asphalt waterproofing roll material: synthetic polymer modified asphalt linoleum; commonly used are SBS modified asphalt linoleum.
2.1.1.1 polymer modified bitumen waterproofing membrane specification, as shown in table 10-13.
Table 10-13
Thickness (mm) width (mm) length (mm) requires
2.0 1000 20
3.0 1000 hot-melt construction of 10, volume material thickness must be 4.0mm
4.0 1000 hot-melt construction of 10, volume material thickness must be 4.0mm
5.0 1000 10

2.1.2 support materials:
2.1.2.1 neoprene bituminous mastics: neoprene joined bitumen and solvent compounded, as a black liquid.
2.1.2.2 rubber asphalt caulk: sealing compound used to detail embedded side seam.
2.1.2.3 protection layer materials: stones, colored protective coating.
2.1.2.4 70th, naphtha, xylene, used to clean contaminated sites.
2.2 the main tools:
2.2.1 electric blenders, high voltage hair dryer, automatic hot-air welding machine.
2.2.2 blowtorch or combustible gas torch, scroll iron trowel, brush, long brush, rolling steel tape measure, scissors, broom, small lines.
2.3 operating conditions:
2.3.1 review drawings before construction, preparation of waterproof construction programmes, and technology to give the low-down; construction of roof waterproofing must be made by the professional team, certified.
2.3.2 laying the waterproof layer of the primary surface, dust, debris should be cleaned thoroughly.
2.3.3 primary slope should comply with the design requirements, the surface should be Niki, Yin and Yang Kok should be made by ARC, base surface must be dry, moisture content should be less than 9%.
2.3.4 coils and supporting materials must be qualified, must comply with the design requirements and specifications, technical performance standard requirements. Store flammable material away from the source of fire.
3 operational processes
3.1 process (hot-melt construction):
Primary treatment agent coat of clean grass-roots pavement additional layer coil coil paving hot melt edge banding

Water test layers

3.2 cleaning the grass-roots: construction prior to acceptance of the primary surface dust, clean up the debris.
3.3 primary brushing treatment agent: polymer modified asphalt coiled material construction, by supporting the use of product specifications, added primary treatment agent neoprene bituminous adhesives industrial gas dilution and mix well using the long brush to brush evenly on the surface of the grass-roots, after 4H at room temperature, start paving membrane.
3.4 additional construction: general use of hot-melt construction of modified asphalt coiled material waterproof layer on daughter wall and water fall mouth, onion, and details such as cornices, corner of yin and Yang to do additional layer, additional range shall conform to the design and engineering standard requirements.
3.5 to pave and stick coil: the volume layer, the thickness of the material, the design requirements. Multi-layer laying seams should be staggered. Will modified sex asphalt waterproof volume material cut into corresponding size, with original volume heart volume good alternate; Pu posted Shi with put volume with with flame gun heating grass-roots and volume material of junction, gun from heating surface 300mm around, by roundtrip uniform heating, while volume material of material surface just melting Shi, will volume material forward roll Pu, and paste, take received parts should full stick firm, take received width full stick method for 80mm.
3.6 hot melt edge banding: Lap gun heating coil and hot, both bond, to edge out of the pitch; sealants strict workmanship for your head at the end.
3.7 waterproof layer construction: the master according to the design requirements of rigid waterproof roofing roofing cover. No master roof cover has two forms:
3.7.1 neoprene coat of waterproof layer surface bituminous binders, then removed stone, requires spreading evenly, bonding, forming layers protective layer.
3.7.2 silver coat of waterproof layer surface reflective coatings.
4 quality criteria
4.1 project:
4.1.1 polymer modified asphalt waterproofing roll-roofing and varieties and brands of adhesives and adhesive mix, you must comply with the design requirements and the relevant provisions of the standards.
4.1.2 waterproofing layer and its deformation joints, eaves, flashing, water fall mouth, details at practices such as embedded parts must comply with the design requirements and technical code for roof engineering requirements.
4.1.3 waterproof coiled material leaking is prohibited.
4.2 Basic project:
4.2.1 tiling waterproofing layer of grass-roots level, Pan-water gradient should comply with the design requirements, no sand, cracks on the surface, smooth and clean, water-free, corner should have a circular or obtuse angle between yin and Yang.
4.2.2 uniform coat of polyurethane adhesive, there shall be no leakage defects such as pitting and brush.
4.2.3 coiled material waterproof layer tiling, lap, your head should comply with the design requirements and technical code for roof engineering requirements. And bond, without hollowing, slip, Homburg, bubbles, fold, injury and other defects.
4.2.4 protective layer of waterproofing layer should be compact, solid, uniform thickness.
5 finished product protection
5.1 has been paving a good waterproofing layers, measures should be taken to protect, is strictly prohibited on the waterproof layer construction and transport and should be waterproof layer.
5.2 passing through layers of roofing, waterproofing the wall of the tube, after completion of the construction and damage displacement.
5.3, such as roofing, water fall mouth of deformation joint, temporary plugs thread and block the construction of cover to prevent falling into the material, after completion of construction will be temporarily blocked, block covers cleaning, ensure the tube, mouth open.
5.4 roofing construction shall not be contaminated walls, eaves side and he had finished construction of the finished product.
6 quality problems to be noticed
6.1 roofing is not flat: screed irregularities, which created, construction should be to find a good line, good slope, screed construction should pull in check. The slope meets the requirements, the smooth water.
6.2 empty drums: coil grass-roots don't dry paving, paving not serious, easily occurred at the corner of an empty drum to pave and stick coil should have a moisture content of grass-roots, do not meet the requirements not paving material while paving should be flat, firm and close bond.
6.3 leak: how happened in detail. Additional paving layer, from coil cut and paste operation should attach snugly in place, sealing, compaction, no Homburg, and so on.
7 quality records
This standard shall meet the following quality records:
7.1 high polymer modified bitumen membrane and materials product certificate, material entry should be the second interview and information.
7.2 cemented material and bond test preparation information.

7.3 hidden inspection data and quality inspection and evaluation of data.

No comments: