Wednesday, November 2, 2016

Oil-paper insulated cable 10 (6) kV indoor Terminal production process

1 scope
This technology is applicable to general industrial and civil building electrical installation engineering 10 (6) kV indoor Terminal head paper insulated cables.
2 construction preparation
2.1 devices and materials requirements:
2.1.1 cable terminal use styling products, and the connection should be closed tight, attachment is complete, and has a factory certificate (table 2-2, table 2-3).
2.1.2 insulation adhesives and epoxy glue should be stereotyped products, must conform to the voltage level and the design requirements, product certification, insulated physicochemical and electrical properties of single.
2.1.3 fixed cable head metal fasteners are galvanized, and complete the appropriate nuts, washers and spring washers.
2.2 the main tools:
2.2.1 production machinery: wiring pliers, blowtorches, hacksaws, hydraulic plastic sheets, iron pots, plates, aluminum pots, aluminum aluminum pot, spoon, slotted spoon, funnel, scissors, disposable gloves, steel tape, electric stove, etc.
2.2.1 Installing machines: drilling machine, electric welding machine, electric hammer, wrench, tape, etc.
2.2.3 testing tool: shake table, steel ruler, thermometer, test equipment and so on.
2.3 operating conditions:
2.3.1 cable terminal making should choose a sunny windless days making, its ambient temperature above + 5 , relative humidity is above 70%.
2.3.2 construction site and its surroundings should be clean and dry.

2.3.3 finished basic civil engineering construction, slurry walls, the roof, and related electrical equipment has been installed, the construction site should meet the prescribed safety, fire, flammable for safe keeping.
2.3.4 with 220V power supply at construction site and safe power supply.
2.3.5 cable terminal making should be borne by the specially trained qualified personnel.
3 operational processes
3.1 process:
Equipment check point shake test calibration moisture stripped cable of cable insulation and protective layers and welding of steel line

Stripped of lead sheet into oil hose terminal end Cable Assembly cable wiring nose Terminal
Perfusion grounding cable compound check commissioning and acceptance

3.2 cable terminal making made according to the following procedure. Strip cut from the beginning to the completed, must be carried out continuously, at once so as not to damp.
3.3 equipment inspections:
3.3.1 box check: construction units, delivery units or units for inspection, and make a record.
3.3.2 cable terminal boxes shall be conducted according to technical data or manuals, accessories complete and without damage.
3.3.3 cable terminal box models must meet the design requirements, the accessories match, as shown in table 2-4, table 2-5.
3.4 roll cable insulation measurement and calibration of moisture:
3.4.1 the cable head turn, 2500V side table side insulation resistance measurement, after passing tide.
3.4.2 connection end saw 100mm about long cables, turnkey and tear off a few of the core paper insulated, cable oils into 140~150 (no cable oil can substitute transformer oil Rosin, hereinafter the same), such as moisture, oil will be suffused with bubbles and make a hissing sound, cable fuel heating, heating mode as shown in Figure 2-13.
3.4.3 another boom is burning method: paper torn off, fire, moisture, insulation paper surface will bubble up and making a hissing sound.
School boom to complete, such as when he found the cable insulation with moisture, piecewise removal, tide, until no moisture is obtained.
3.5 remove cable cover:
According to the cable terminal fixation to the distance between the connected devices decides to strip cut size and the length of the line (as shown in Figure 2-14 and tails should be able to meet the requirements of Exchange phase).
3.5.1 according to size, peel off jacket (or plastic).
3.5.2 from sheathed fracture to the end of the 100mm clamp or ground wires and strips are secured with 2mm bare copper wire (clamp two-thirds wide steel strip processing), welded steel, Kazi, bare copper wire at the ground prior to Polish, gloss, so that the welding ground. And strip steel. When Peel strips, use a hacksaw saw a ring of dark marks, its depth shall not exceed one-second of the steel strip thickness (never saw so as not to damage the lead), then pry the Strip with a screwdriver tip, combination pliers are clamped tear Strip.
3.6 welding ground:

3.6.1 will lead clean, copper and plastic lines or braided copper wire (less than 16 mm2 cable for 120mm2 cable, more than 150 mm2 cable with 25 mm2) in the lead Pack and strip with φ 2 turns of copper wire tied to 3~5.
3.6.2 with torches lead ground lead and steel strip welded on in prison. Require welding on two layers of steel with smooth surface, no stitch welding.
3.7 stripping lead and lead expansion:
3.7.1 the use shredded cotton wipe dipped in gasoline lead Pack, clean inside the cable housing into the cable.
3.7.2 stripping lead. Volume 150mm lead pack at the steel fracture, the rest of the Strip. Stripping lead Shi should note with electrical knife carved a ring deep marks, its depth shall not over lead package thickness of one-second (stripping lead Qian first Pu good rubber cloth or plastic sheeting), with electrical knife from ring marks at to end designated two road parallel deep marks, its depth for the lead package thickness of one-second, two line distance about 10MM, then from end will lead article tore to, Hou removed lead package (Figure 2-15).
3.7.3 lead expansion: expanding lead with expanded lead, Shun turnkey paper winding direction 30 ° ~45 ° angle with the expanded lead, will lead expansion into a 45 ° angle to form Bell, lead to smooth, symmetrical, Burr (Figure 2-16).
3.7.4 stripping except Commission package paper: first stripping to outer semiconductor paper, then in expansion lead mouth 25mm at package wrapped around 5 layer black paint across with, and filled expansion lead trumpet last a layer package had expansion lead trumpet, from cable end with hand tore off Commission package paper, with electrical knife cut to filler (must note knife direction should makes knife sliding off Shi not injury cable insulation).
3.7.5 broken core wires, one hand firmly holding the core velvet roots, one hand and gently pull the wire to break apart, not too hard, so as not to damage wire insulation paper (Figure 2-17).
3.8 wrapping cable insulation and jacket into the oil hose:
Each core on the chromatography paper use hands torn off, hand pulled cotton yarn stained with alcohol wipe wire cable on the oil, then paper-wound direction half overlapping wrap two layers of black paint across the belt. According to the length of the cable line into the oil hose until the three-core separate from three separate core 50mm, each of the same 200mm using half overlap wrapped six layers of black paint across the zone.
3.9 connecting nose:
3.9.1 stripping except from cable core line end volume take wiring Terminal hole of length added 10MM of insulation paper, will line core line and line nose with cotton dip gasoline wipe NET, pressure wiring nose, put line nose polished smooth clean, smear a layer had chlorine vinyl paint, package wrapped around plastic with, has been package wrapped around to and core line insulation phase flat weizhi, each layer plastic with Zhijian are smear had chlorine vinyl paint.
3.10 assembled cable terminal (Figure 2-18):
3.10.1 put nylon cable head of Xia sealed pieces twist tight, loaded good Shang cover, again sets Shang rubber finger sets, finger sets upper and lower ends package wrapped around two layer plastic with (are must smear had chlorine vinyl paint), then with nylon small line lashing firm, lashing length not is less than 20mm (first lashing II phase, left pouring insulation rubber convenient of a root, note rubber finished Hou again lashing).
3.10.2 oil hose diameter on perchlorovinyl paint, back into line on the nose 40mm, wrap two layers of plastic, tied tightly with a small nylon line, tied the length not less than 20mm.
3.10.3 from rubber finger COTS to the half full length nose with black paint across the line overlap wrapping two layers.
3.11 fixed cable terminal. Nylon cable clamp installed, the cable head is fixed firmly, from the fief line 50mm installation cable support cable vertical 1500mm there should be two mounting brackets.
3.12 perfusion cable compound. Previously heated to 170~180 ° cable compound, not a rubber finger bandage from the reserved entrance into the cable head, once filled, cooled 60 , to fix water, then wrapped the rest in the same way a finger.
3.13 properly earthed, check the phase, with yellow, green, red, plastic bag wrapped in wire preparation, cable ends clean.
3.14 commissioning and acceptance:
3.14.1 the first cable production has been completed, as required by the test Department pressure and test.
3.14.2 acceptance: the no-load run 24h no abnormal phenomenon, for the acceptance procedures unit. Submit change of negotiation, product certification, specification, test reports, and running records and other technical information.
4 quality criteria
4.1 project:
4.1.1 cable terminal pressure results, the leakage current and insulation resistance code requirements must be met.
4.1.2 cable terminal closed tight, packing infusion full, no bubbles, oil leakage, wire connections tight.
Inspection method: Visual check and inspection and test records.
4.2 Basic project:
Cable head good looks, smooth, with no sand hole, wire bending wave-free.
Inspection method: Visual check.
5 finished product protection
5.1 in the process of making a cable head, less wearing parts with care, materials tools clean, so as not to affect production quality.
5.2 filling when insulated, not allowed to touch the cable head parts.
5.3 the first cable production after the immediate fixing, transmission runs, transmission or cannot have other jobs, giving protection to cable head and wooden boxes to prevent smashing, touch.
6 quality problems to be noticed
6.1 cable insulating paper cannot be damaged, particularly in three separate core broke off when to be extra cautious, not too hard. In wrapping the insulation layer, not to pretend to wire back and forth.
6.2 in the making in cable head, materials, tools and equipment shall be kept clean and free of moisture, wipe the moisture in the hands of.
6.3 lead to fast, bake-lead package, flames should be uniform to avoid damaging the lead Pack and reduce the dielectric strength.
Quality of 7 records
7.1 product certificate.
7.2 equipment inspection records.
7.3 cable test report form.
7.4 compound chemical and electrical performance test report form.
7.5 mutual inspection records.

7.6 change record of negotiation.

No comments: