1 scope
The technology standard is applicable to
industrial and civil building engineering precast terrazzo.
2 construction preparation
2.1 material and main equipments:
2.1.1 cement: more than 425 ordinary
Portland cement and slag Portland cement, have the factory certificate.
White cement, Portland cement, symbols are
not less than 425.
2.1.2 sand, coarse sand and medium sand,
silt content is not more than 3%.
2.1.3 prefabricated water SLATE: should
have the factory certificate, approval on every board, in accordance with the
requirements of processing order check acceptance specifications, size, color,
and respectively (standing) pattern on the wood. In order to prevent the plate
deformation, should be stored in a room, avoid intense exposure to sunlight.
Terrazzo plate material requirements are
shown in table 7-7.
Table 7-7 terrazzo plate material
requirements
Allowable deviation (mm)
Roughness length width thickness maximum
deviation
Length:
Terrazzo plate 400 1.0 or higher surface
requirement stones, the color is consistent, irrotational grain and porosity
800 2.0 or higher
2.1.4 gypsum powder, wax, oxalic acid.
2.1.5 main machines: mortar mixer,
millstone machine, grinding wheel saws, 45 # steel grit wheel, wood trowel,
scraping bars, wood on foot, spirit level, rubber hammer, 90 degrees of steel
square, string cable broom, etc.
2.2 operation conditions:
2.2.1 indoor wall plaster finish, door
frame.
2.2.2 metope has good + 50 cm horizontal
line.
Then through the floor tube hole has been
blocked fill in yan.
2.2.4 embedded in the ground wire and tube
have been laid out, and finish the concealment acceptance formalities. Cushion
has been done on the ground, its strength is 1.2 MPa.
2.2.5 laid before you check the color of
the precast waterproof slab meets the design requirements, specifications,
size, and selected, there will be cracks, off Angle, Angle, the plate warping
defects such as discharge, shall not be used.
3 operation process
3.1 process:
The basic level processing - alignment -
the watermill slab submerged - mortar mixing - water and brush at the
grass-roots level water and mud
Cement mortar layer and prefabricated water
tablets - > curing crack seal to stick with skirting board, pickling wax
Basic level processing: 3.2 the mortar on
the bonding at the grassroots level of concrete (or on) and plasma skin brush
net smashed, the broom and eluvial soil surface clean.
3.3 set baseline: ground elevation
according to design drawings requirements, from have to play good + 50 cm line
on metope, find the surface elevation, play board face level in all round the
walls. Then pull the reticle from around the room for shop standard block,
directly connected to aisle room should pull wire, room and footpath if use
different color water tablets, color separation line should be at the door.
Patterned hall, room should be according to the width of the specifications of
the size and water block, seam width, determine the various water stone blocks,
drawing construction details.
Prefabricated waterproof slab submerged
3.4: in order to ensure the mortar screed-coat with precast slabs of water
between cementing quality, in front of the pavement plate, plate applied wet,
auxiliary surface and no MingShui.
Mortar mixing: 3.5 application 1:3 harsh
cement mortar leveling layer, is to ensure that the ground roughness, density
is an important technical measures (because it has the advantages of low
moisture, high strength and good compactness, forming early in the process of
the condensation sclerosis and little shrinkage, etc), so when mixing attention
should be paid to control of water addition, mixed mortar to use hand to knead
dough, bounce away immediately after the advisable, increases with the
increasing spread, may not be mixing too much.
3.6 sprinkler and brush the slurry: at the
grass-roots level to the ground surface at the grass-roots level after the
clean water wet (no MingShui). Before laying mortar screed-coat should brush a
layer of water cement ratio of 0.5 or so of the slurry, pay attention to the
early, do not brush too much, after the brush immediately spread mortar
screed-coat, can't afford to avoid slurry drying bonding effect.
3.7 cement mortar layer and prefabricated
water tablets:
3.7.1 locate the standard block: in the
identified reticle junction of the middle one for the standard location (such
as for reticle raphe, can install in cross intersection diagonal two standard
block), standard piece as a whole the level and standard of the room, when the
pavement application 90 degree Angle square and level detailed correction. To
determine the standard block, can according to have good cross reference line
for pavement.
3.7.2 virtual harsh cement mortar combining
layer: after check has no dry brush good slurry phenomenon, can begin laying
mortar combining layer (along with build by laying bricks or stones, and may
not be spread too, laying thickness with 25 ~ 3 cm advisable, put water on the
SLATE when higher than the ground elevation lines 3 ~ 4 mm advisable, with
scraping bars a flat first, and then iron float shall be used to take a firm,
and then try to precast waterproof slab, good for vertical and horizontal seam,
rubber hammer knock plate in the middle, vibrated mortar to laying height, will
try to spread the right prefabricated water stone moved aside, and check the
mortar on the surface, such as in conformity with the watermill slab bottom
after (, if there is any empty application mortar filling), with a layer of
water pouring time than plain cement paste of about 0.5, then lay precast
waterproof slab, to the four auxiliary fall at the same time, with a rubber
mallet taps, leveling with level or straight ruler at any time.
3.7.3 standard block set, should be in the
direction of the sides and back order per block paving, plate width of the gaps
between the requirements such as design, should not be greater than 2 mm, to
pull through long term straightness of joint control, at the same time we will
strictly control seam height difference. Installed precast waterproof slab
should be neatly smooth bearing joint alignment.
3.7.4 precast paving room water tablets,
spread to all around the wall with a whole plate edge, should be mutual
symmetry (fixed line in the room to pull the reticle, should according to the
grinding stone specifications, size to calculate the edge width). Who has the
part of the floor drain, should pay attention to when the pavement surface
slope, pavement around the floor drain water stone, cut, radian to coincide
with a floor drain.
3.8 maintenance and caulking: prefabricated
water stone pavement 2 day and night, after check the surface no fault, empty
drum, with thin slurry (1:1 = cement: fine sand), caulking, and keep clean the
slurry to overflow, after filling and 2/3 height, reoccupy color slurry filling
with water SLATE yan (attention to the strength of the cement used). Finally
the sawdust on the shop or other material to cover moist, curing time should
not be less than 7 d, and cannot be here.
3.9 stick with skirting board; Before
install designated persons selected, thickness should be consistent, and
skirting board water wet to dry. Such as the design requirements in Yang Angle
in the intersection of skirting board has cut corners, before installation
skirting board side should be cut into a 45 ° Angle. The operator can choose
the following two stick set method:
3.9.1 paste method: according to the main
wall structure form to determine the skirting board thickness of bottom ash.
3.9.1.1 main wall is concrete or brick
masonry, the vertical alignment in the metope of the good ash determine the
skirting board thickness of bottom ash (at the same time to consider the
skirting board out of the wall thickness, average of 8 ~ 10 mm), with 1:2 with
cement mortar bottom ash (the base for the concrete should brush a layer of
cement combining layer, the water cement ratio of 0.4 ~ 0.5), and draw lines,
leveling base ash corrugations, will have dry wet shade the skirting board on
the back of 2 ~ 3 mm thick slurry or polymer cement paste (107 glue mixing
10%), with a wooden hammer knock, guy look straight leveling, the brush with
white cement seam.
3.9.1.2 main walls is plasterboard of
lightweight partition, there is no bottom ash, with cement mortar paste
directly skirting board, operation method.
3.9.2 grouting method: the main wall is
matrix concrete or brick wall, metope wipe out ash, lower the line that play a
base not bottom ash, establish skirting board before pouring the slurry.
3.9.2.1 first determine skirting board out
of the wall thickness (about 8 ~ 10 mm), use wood on foot plate (or falling)
measured wall skirting board position on both ends of the bottom, and then pull
a flowing horizontal line.
3.9.2.2 metope water clean and moist, and
then by Yang Angle on both sides to try, check whether level off, the joint is
tight, with or without drop horn and so on, do not conform to the requirements
should be adjusted, and then formally for installation, lower use on foot board
flat, plate mouth up and down make temporary fixed with plaster. Gypsum after
solidification, check the flatness, seam height difference, straightness, top
of the wall thickness, conform to the requirements of the standard, with 1:2
cement mortar (consistency is commonly 8 ~ 12 cm) perfusion, and skirting board
flowing redundant mortar at any time be removed.
3.9.2.3 grouting sprinkler maintenance 3 d
after 24 h, through inspection no empty drum, shave my temporary fixed plaster
and clear clean, wipe with cement mortar with skirting board color seam.
3.9.2.4 stick inserted skirting board,
skirting board made the appropriate seam with ground water block seam to seam
with stick.
Pickling, waxing 3.10:
3.10.4 pickling: prefabricated water block
in the factory after polishing wax, but due to pollution water mud crack seal
surface during installation and after installation finished product protection,
so the surface should be treated before the unit project completion, and oxalic
acid powder and water scrub, rinse off with clear water to withdraw saw not
sweep dry (such as plate joint height difference exceeds 0.5 mm, appropriate is
used after the millstone machine grinding of pickling).
3.10.2 wax: precast stone surface (surface
should be dry) after clean, clean cloth or linen yarn with dilute paste into
wax. Tu (uniform) on the surface of the stone, with a millstone machine
pressure hemp first wax again, in the same way the second times wax surface
bright, clear design, colour and lustre is consistent.
Precast stone baseboard pickling and
polishing method is the same as the above method.
4 quality standards
4.1 ensure project: surface and skirting
board of the prefabricated water tablets used varieties, specifications, color,
quality must meet the design requirements, the surface with the grassroots must
be strong, no empty drum.
4.2 the basic items:
2 surface clean, clear design, colour and
lustre is consistent, uniform seam, straight, plate, no crack, lack of stare
blankly, fall off wait for a phenomenon.
4.2.2 floor drain slope comply with the
design requirements, not the water, no water, the floor drain (pipe) attaches
tight and firm, no leakage.
Holdings skirting board surface clean,
uniform seam formation, highly consistent, combined with the strong, the wall
thickness is appropriate.
4.2.4 floors edge with the materials and
size comply with the design requirements and construction norms, edge neat,
smooth.
With regard to quality regulation terrazzo
surface 4.2.5 waxing.
4.3 allowable deviation project, are shown
in table 7-8.
Precast terrazzo floor allowable deviation
table 7-8
Allowable deviation (mm)
Advanced terrazzo ordinary terrazzo
Surface roughness 2, 3, 1 in 2 m by feet
and wedge feeler check
2 seam straight line 3 3, 5 m, less than 5
m's line and the ruler quantity check
3 seam height difference of 0.5 feet and
wedge feeler check
4 kicking sewn straight mouth, 3, 4, 5 m
line, less than 5 m's line and the ruler quantity check
5 plate gap width is not more than 2 2 feet
quantity check
5 finished product protection
5.1 after the completion of the precast
terrazzo floor room should be closed, not closed corridor, the surface should
be in the upper cover protection (plastic film, etc.).
5.2 to prevent the paint brush, slurry
pollution has completed precast slab grinding.
5.3 it is strictly prohibited in terrazzo
floor mixing mortar, pile up the paint bucket and other sundry.
5.4 shall not impact the door and wall
materials transportation. Protect plumbing riser, reserved holes, electrical
box, etc., shall not be damaged, blocked.
6 should pay attention to quality problems
6.1 the ground empty drum. The reason and
prevention measures are as follows:
6.1.1 mortar screed-coat with basic not
firm: due to the grassroots cleanup not clean, not enough water wet cement
grain combine layer coating uneven or besmear brushs a long time, which causes
air drying induration layer and layer combining with empty drum. So grass-roots
must carefully clean up the ground, and fully wet, besmear brushs the slurry
should besmear to brush evenly.
6.1.2 combining layer of mortar and surface
and not firm: combining layer mortar must use harsh mortar, if water more or a
shop is too thick, rap is not solid, easy to cause surface empty drum.
Also 6.1.3 plate on the back of the float
ash does not clean, without soaking wet, also affect the bonding effect.
6.2 not straight seam uneven, the gap is
not uniform: when choosing grinding stone is not strict, uneven, width
inconsistent not straight seam caused by uneven, uneven. Try shop should be
carefully adjusted, controlled nuiko must pull tong line.
Too much difference between high and low
seam: 6.3 plate plate seam between high and low difference exceeds allowable
deviation, should be disposed of by machine grinding method, polishing and
waxing.
6.4 precast terrazzo skirting board
installed out of the wall thickness is not consistent: the main reason is that
the perpendicularity of the metope, flatness deviation is too big, should
advance when Ann skirting board processing metope, achieve a wall thickness.
6.5 precast terrazzo skirting the roots
have pore, imprecise: mainly installation skirting board level elevation line
not good control, so first find good skirting board before installation on the
target high control points, again pull level control.
6.6 terrazzo skirting board flowing
unclean: the main reason is that the wall spray or brush emulsioni paint,
skirting board did not cover protection, before waxing should be easy to clean.
7 quality records
This technology standard should have the
following quality records:
7.1 precast grinding stones, skirting board
factory certificate.
7.2 cement factory certificate.
7.3 precast terrazzo floor component
quality evaluation table.