1 scope
The technology standard is applicable to industrial and civil building engineering precast terrazzo.
2 construction preparation
2.1 material and main equipments:
2.1.1 cement: more than 425 ordinary Portland cement and slag Portland cement, have the factory certificate.
White cement, Portland cement, symbols are not less than 425.
2.1.2 sand, coarse sand and medium sand, silt content is not more than 3%.
2.1.3 prefabricated water SLATE: should have the factory certificate, approval on every board, in accordance with the requirements of processing order check acceptance specifications, size, color, and respectively (standing) pattern on the wood. In order to prevent the plate deformation, should be stored in a room, avoid intense exposure to sunlight.
Terrazzo plate material requirements are shown in table 7-7.
Table 7-7 terrazzo plate material requirements
Allowable deviation (mm)
Roughness length width thickness maximum deviation
Length:
Terrazzo plate 400 1.0 or higher surface requirement stones, the color is consistent, irrotational grain and porosity
800 2.0 or higher
2.1.4 gypsum powder, wax, oxalic acid.
2.1.5 main machines: mortar mixer, millstone machine, grinding wheel saws, 45 # steel grit wheel, wood trowel, scraping bars, wood on foot, spirit level, rubber hammer, 90 degrees of steel square, string cable broom, etc.
2.2 operation conditions:
2.2.1 indoor wall plaster finish, door frame.
2.2.2 metope has good + 50 cm horizontal line.
Then through the floor tube hole has been blocked fill in yan.
2.2.4 embedded in the ground wire and tube have been laid out, and finish the concealment acceptance formalities. Cushion has been done on the ground, its strength is 1.2 MPa.
2.2.5 laid before you check the color of the precast waterproof slab meets the design requirements, specifications, size, and selected, there will be cracks, off Angle, Angle, the plate warping defects such as discharge, shall not be used.
3 operation process
3.1 process:
The basic level processing - alignment - the watermill slab submerged - mortar mixing - water and brush at the grass-roots level water and mud
Cement mortar layer and prefabricated water tablets - > curing crack seal to stick with skirting board, pickling wax
Basic level processing: 3.2 the mortar on the bonding at the grassroots level of concrete (or on) and plasma skin brush net smashed, the broom and eluvial soil surface clean.
3.3 set baseline: ground elevation according to design drawings requirements, from have to play good + 50 cm line on metope, find the surface elevation, play board face level in all round the walls. Then pull the reticle from around the room for shop standard block, directly connected to aisle room should pull wire, room and footpath if use different color water tablets, color separation line should be at the door. Patterned hall, room should be according to the width of the specifications of the size and water block, seam width, determine the various water stone blocks, drawing construction details.
Prefabricated waterproof slab submerged 3.4: in order to ensure the mortar screed-coat with precast slabs of water between cementing quality, in front of the pavement plate, plate applied wet, auxiliary surface and no MingShui.
Mortar mixing: 3.5 application 1:3 harsh cement mortar leveling layer, is to ensure that the ground roughness, density is an important technical measures (because it has the advantages of low moisture, high strength and good compactness, forming early in the process of the condensation sclerosis and little shrinkage, etc), so when mixing attention should be paid to control of water addition, mixed mortar to use hand to knead dough, bounce away immediately after the advisable, increases with the increasing spread, may not be mixing too much.
3.6 sprinkler and brush the slurry: at the grass-roots level to the ground surface at the grass-roots level after the clean water wet (no MingShui). Before laying mortar screed-coat should brush a layer of water cement ratio of 0.5 or so of the slurry, pay attention to the early, do not brush too much, after the brush immediately spread mortar screed-coat, can't afford to avoid slurry drying bonding effect.
3.7 cement mortar layer and prefabricated water tablets:
3.7.1 locate the standard block: in the identified reticle junction of the middle one for the standard location (such as for reticle raphe, can install in cross intersection diagonal two standard block), standard piece as a whole the level and standard of the room, when the pavement application 90 degree Angle square and level detailed correction. To determine the standard block, can according to have good cross reference line for pavement.
3.7.2 virtual harsh cement mortar combining layer: after check has no dry brush good slurry phenomenon, can begin laying mortar combining layer (along with build by laying bricks or stones, and may not be spread too, laying thickness with 25 ~ 3 cm advisable, put water on the SLATE when higher than the ground elevation lines 3 ~ 4 mm advisable, with scraping bars a flat first, and then iron float shall be used to take a firm, and then try to precast waterproof slab, good for vertical and horizontal seam, rubber hammer knock plate in the middle, vibrated mortar to laying height, will try to spread the right prefabricated water stone moved aside, and check the mortar on the surface, such as in conformity with the watermill slab bottom after (, if there is any empty application mortar filling), with a layer of water pouring time than plain cement paste of about 0.5, then lay precast waterproof slab, to the four auxiliary fall at the same time, with a rubber mallet taps, leveling with level or straight ruler at any time.
3.7.3 standard block set, should be in the direction of the sides and back order per block paving, plate width of the gaps between the requirements such as design, should not be greater than 2 mm, to pull through long term straightness of joint control, at the same time we will strictly control seam height difference. Installed precast waterproof slab should be neatly smooth bearing joint alignment.
3.7.4 precast paving room water tablets, spread to all around the wall with a whole plate edge, should be mutual symmetry (fixed line in the room to pull the reticle, should according to the grinding stone specifications, size to calculate the edge width). Who has the part of the floor drain, should pay attention to when the pavement surface slope, pavement around the floor drain water stone, cut, radian to coincide with a floor drain.
3.8 maintenance and caulking: prefabricated water stone pavement 2 day and night, after check the surface no fault, empty drum, with thin slurry (1:1 = cement: fine sand), caulking, and keep clean the slurry to overflow, after filling and 2/3 height, reoccupy color slurry filling with water SLATE yan (attention to the strength of the cement used). Finally the sawdust on the shop or other material to cover moist, curing time should not be less than 7 d, and cannot be here.
3.9 stick with skirting board; Before install designated persons selected, thickness should be consistent, and skirting board water wet to dry. Such as the design requirements in Yang Angle in the intersection of skirting board has cut corners, before installation skirting board side should be cut into a 45 ° Angle. The operator can choose the following two stick set method:
3.9.1 paste method: according to the main wall structure form to determine the skirting board thickness of bottom ash.
3.9.1.1 main wall is concrete or brick masonry, the vertical alignment in the metope of the good ash determine the skirting board thickness of bottom ash (at the same time to consider the skirting board out of the wall thickness, average of 8 ~ 10 mm), with 1:2 with cement mortar bottom ash (the base for the concrete should brush a layer of cement combining layer, the water cement ratio of 0.4 ~ 0.5), and draw lines, leveling base ash corrugations, will have dry wet shade the skirting board on the back of 2 ~ 3 mm thick slurry or polymer cement paste (107 glue mixing 10%), with a wooden hammer knock, guy look straight leveling, the brush with white cement seam.
3.9.1.2 main walls is plasterboard of lightweight partition, there is no bottom ash, with cement mortar paste directly skirting board, operation method.
3.9.2 grouting method: the main wall is matrix concrete or brick wall, metope wipe out ash, lower the line that play a base not bottom ash, establish skirting board before pouring the slurry.
3.9.2.1 first determine skirting board out of the wall thickness (about 8 ~ 10 mm), use wood on foot plate (or falling) measured wall skirting board position on both ends of the bottom, and then pull a flowing horizontal line.
3.9.2.2 metope water clean and moist, and then by Yang Angle on both sides to try, check whether level off, the joint is tight, with or without drop horn and so on, do not conform to the requirements should be adjusted, and then formally for installation, lower use on foot board flat, plate mouth up and down make temporary fixed with plaster. Gypsum after solidification, check the flatness, seam height difference, straightness, top of the wall thickness, conform to the requirements of the standard, with 1:2 cement mortar (consistency is commonly 8 ~ 12 cm) perfusion, and skirting board flowing redundant mortar at any time be removed.
3.9.2.3 grouting sprinkler maintenance 3 d after 24 h, through inspection no empty drum, shave my temporary fixed plaster and clear clean, wipe with cement mortar with skirting board color seam.
3.9.2.4 stick inserted skirting board, skirting board made the appropriate seam with ground water block seam to seam with stick.
Pickling, waxing 3.10:
3.10.4 pickling: prefabricated water block in the factory after polishing wax, but due to pollution water mud crack seal surface during installation and after installation finished product protection, so the surface should be treated before the unit project completion, and oxalic acid powder and water scrub, rinse off with clear water to withdraw saw not sweep dry (such as plate joint height difference exceeds 0.5 mm, appropriate is used after the millstone machine grinding of pickling).
3.10.2 wax: precast stone surface (surface should be dry) after clean, clean cloth or linen yarn with dilute paste into wax. Tu (uniform) on the surface of the stone, with a millstone machine pressure hemp first wax again, in the same way the second times wax surface bright, clear design, colour and lustre is consistent.
Precast stone baseboard pickling and polishing method is the same as the above method.
4 quality standards
4.1 ensure project: surface and skirting board of the prefabricated water tablets used varieties, specifications, color, quality must meet the design requirements, the surface with the grassroots must be strong, no empty drum.
4.2 the basic items:
2 surface clean, clear design, colour and lustre is consistent, uniform seam, straight, plate, no crack, lack of stare blankly, fall off wait for a phenomenon.
4.2.2 floor drain slope comply with the design requirements, not the water, no water, the floor drain (pipe) attaches tight and firm, no leakage.
Holdings skirting board surface clean, uniform seam formation, highly consistent, combined with the strong, the wall thickness is appropriate.
4.2.4 floors edge with the materials and size comply with the design requirements and construction norms, edge neat, smooth.
With regard to quality regulation terrazzo surface 4.2.5 waxing.
4.3 allowable deviation project, are shown in table 7-8.
Precast terrazzo floor allowable deviation table 7-8
Allowable deviation (mm)
Advanced terrazzo ordinary terrazzo
Surface roughness 2, 3, 1 in 2 m by feet and wedge feeler check
2 seam straight line 3 3, 5 m, less than 5 m's line and the ruler quantity check
3 seam height difference of 0.5 feet and wedge feeler check
4 kicking sewn straight mouth, 3, 4, 5 m line, less than 5 m's line and the ruler quantity check
5 plate gap width is not more than 2 2 feet quantity check
5 finished product protection
5.1 after the completion of the precast terrazzo floor room should be closed, not closed corridor, the surface should be in the upper cover protection (plastic film, etc.).
5.2 to prevent the paint brush, slurry pollution has completed precast slab grinding.
5.3 it is strictly prohibited in terrazzo floor mixing mortar, pile up the paint bucket and other sundry.
5.4 shall not impact the door and wall materials transportation. Protect plumbing riser, reserved holes, electrical box, etc., shall not be damaged, blocked.
6 should pay attention to quality problems
6.1 the ground empty drum. The reason and prevention measures are as follows:
6.1.1 mortar screed-coat with basic not firm: due to the grassroots cleanup not clean, not enough water wet cement grain combine layer coating uneven or besmear brushs a long time, which causes air drying induration layer and layer combining with empty drum. So grass-roots must carefully clean up the ground, and fully wet, besmear brushs the slurry should besmear to brush evenly.
6.1.2 combining layer of mortar and surface and not firm: combining layer mortar must use harsh mortar, if water more or a shop is too thick, rap is not solid, easy to cause surface empty drum.
Also 6.1.3 plate on the back of the float ash does not clean, without soaking wet, also affect the bonding effect.
6.2 not straight seam uneven, the gap is not uniform: when choosing grinding stone is not strict, uneven, width inconsistent not straight seam caused by uneven, uneven. Try shop should be carefully adjusted, controlled nuiko must pull tong line.
Too much difference between high and low seam: 6.3 plate plate seam between high and low difference exceeds allowable deviation, should be disposed of by machine grinding method, polishing and waxing.
6.4 precast terrazzo skirting board installed out of the wall thickness is not consistent: the main reason is that the perpendicularity of the metope, flatness deviation is too big, should advance when Ann skirting board processing metope, achieve a wall thickness.
6.5 precast terrazzo skirting the roots have pore, imprecise: mainly installation skirting board level elevation line not good control, so first find good skirting board before installation on the target high control points, again pull level control.
6.6 terrazzo skirting board flowing unclean: the main reason is that the wall spray or brush emulsioni paint, skirting board did not cover protection, before waxing should be easy to clean.
7 quality records
This technology standard should have the following quality records:
7.1 precast grinding stones, skirting board factory certificate.
7.2 cement factory certificate.

7.3 precast terrazzo floor component quality evaluation table.