1 scope
This process within the standard applicable
to the brick structure, brick structure of the constructional column, ring
beam, plate seam reinforcement assembling process.
2 construction preparation
2.1 material and main equipments:
2.1.1 reinforced: should have the factory
certificate, in accordance with the provisions for mechanical properties of the
second interview, when added a brittle fracture occurred in special
circumstances, such as still need to test for chemical composition.
Reinforcement should be no old rust and oil pollution.
2.1.2 the wire; Can use 20 ~ 22 (HuoShaoSi)
wire or galvanized iron wire, galvanized iron wire).
2.1.3 control concrete cover with mortar
pad, plastic card.
2.1.4 tool: the steel hook, crowbar, steel
board, binding frame, steel wire brush, trolleys, chalk, ruler, etc.
2.2 operation conditions:
2.2.1, as stipulated in the construction
site plan will be clean, smooth, reinforced yard ready timbers. According to
different specifications pile up and take good crosser.
2.2.2 check reinforced level, type, shape,
size and quantity, whether or not the same as the design drawings and
processing ingredients list.
2.2.3 play good elevation and
constructional column, horizontal brick mold concrete wall skin line.
2.2.4 ring beam and the plate seam is done
with preview the template, and will clean up the mould.
2.2.5 prestressed hole board side hole has
been blocked according to the requirement of the standard drawing g44 (96).
3 operation process
3.1 constructional column steel binding:
3.1.1 process:
Prefabricated constructional column
reinforced skeleton to trim the bottom out of the constructional column tower
after reinforcement
Installation and constructional column
reinforced skeleton binding lap stirrups
3.1.2 prefabricated constructional column
reinforced skeleton:
3.1.2.1 two vertical reinforced flat on
first tie rack, and draw the stirrup spacing on the reinforcement.
3.1.2.2 according to line drawing position,
the set of stirrup on the bearing steel tie them one by one, to set aside the
length of the lap joint parts. In order to prevent deformation, appropriate
USES button nazism or set of binding. Stirrup should keep vertical with
reinforced; Stirrup bend hook composite, should be placed along the direction
of reinforced stagger.
3.1.2.4 permission levels in two additional
force reinforcement and stirrup binding is firm, stirrup end straight length of
not less than 10 d (d stirrup diameter), hook Angle of not less than 135 °.
On the pillars, column foot handover with
ring beam reinforcement, should according to the design requirements of stirrup
encryption column, encryption scope under the general on the ring beam, all
should not be less than one 6 of the height or 45 cm, stirrup spacing should
not be more than 10 cm (column foot stirrup encryption area for column frame
set up lap after binding).
3.1.3 trim out at the bottom of the post
lap steel: according to the line has put a good post position, lap rib location
and examine whether the lap length comply with the design and specification
requirements. The underlying constructional column vertical reinforcement and
foundation ring beam anchorage; Without base ring beam, buried within the
column concrete of bridge, as shown in figure 4-2; When the wall with trench,
constructional column embedding depth should be greater than the groove depth.
Figure 4-2
(a) based on ring beam; (b) no base ring
beam
3.1.4 constructional column reinforced
skeleton installation: the first position the stirrup on take it reinforced,
then put up prefabricated constructional column reinforced skeleton, for
reaching lap, lap times no less than 35 d, elevation lines, for good in
vertical rib lap the three buttons. Skeleton, stirrup encryption can bind root
zone.
3.1.5 steel banding lap sites:
3.1.5.1 constructional column reinforcement
must be connected with the layers of vertical and horizontal wall of ring beam
reinforcement assembling, form a closed frame.
3.1.5.2 in brick wall if Malaysia teeth,
along the wall every 50 cm high embedding two phi 6 levels of Rachel
reinforcement, connected to the constructional column steel binding, as shown
in figure 4-3.
Figure 4-3
3.1.5.3 when the reduction set in the
absence of the external walls of the cross wall, constructional column
reinforced with cast-in-place or precast beam tie beam end connection
structure, to meet the multi-layer brick setting reinforced concrete
constructional column seismic design and construction (JGJ13-82), the
provisions of article 3.2.5.
After 3.1.5.4 build by laying bricks or stones
the brick wall, deal with constructional column reinforcement for renovation,
to guarantee the accuracy of the reinforcement position and spacing.
3.2 ring beam reinforced binding:
3.2.1 process:
Draw bar line of position to put the
stirrup - wear ring beam bearing steel - binding stirrups
3.2.2 the ring beam template and finish
preview, can tie ring beam reinforcement, if using precast frame, frame can be
assembled according to number of the hoisting in place. Such as binding in the
module, spacing, according to the requirements of design drawings in the
template side help draw stirrup of line. Wear reinforced after put the stirrup.
Stirrup set it should be along the reinforced each other stagger.
3.2.3 ring beam and constructional column
reinforced junction, ring beam reinforcement should be on the inside of the
constructional column reinforced. Ring beam reinforcement in constructional
column lap, lap times or anchor into the column length should comply with the
design requirements.
3.2.4 ring beam reinforced the lap length
to conform to the concrete structure engineering construction and acceptance
standard "(GB50204-92) to the requirements of reinforced lap.
3.2.5 ring beam reinforcement should be
each other hand in turn, in the interior wall junction, wall corner of
anchorage length, to comply with the design requirements.
3.2.6 stairwells, attached to the wall,
chimney, and the mouth of the cave was cut off parts of the ring beam steel
chute, should lap reinforcing, constructor should comply with the design
requirements, elevation difference of ring beam reinforcement, should according
to the design requirements lap or connection.
3.2.7 installed on the gable ring beam of
prestressed round hole plate, its exposed prestressed reinforcement (i.e., the
beard tendons) according to the standard atlas 96 g44 to anchor into within the
ring beam reinforcement.
3.2.8 ring frame reinforced after the tie,
should add cement mortar pad, to control the stress of reinforced protective
layer.
3.3 plate steel binding
The process flow
Supporting seam template - > slab end of
prestressed anchoring reinforcement bending and 45 °
Put on the level and structure
reinforcement and plate end anchorage reinforcement binding
3.3.2 rainfall distribution on 10-12
finished the preview, the plate seam template will be prefabricated circular
orifice exposed tendon (i.e., the beard tendons) bent into a curved, two boards
of prestressed exposed reinforced cross each other, and then tie tong long phi
6 level structure and vertical Rachel reinforcement, as shown in figure 4.
Figure 4-4
3.3.3 long to the plate in the middle on
the bearing steel bar connection structure as shown in figure 4-5.
Figure 4-5
We do on both sides of the wall height is
not at the same time, the reinforced structure as shown in figure 4 to 6.
3.3.5 precast slab longitudinal seam steel
binding as shown in figure 4 to 7.
Figure 4-6 figure 4 to 7
3.3.6 constructional column, ring beam,
slab joint reinforced tied after, are required to do take cover engineering
inspection, qualified rear can be carried out under the procedure.
4 quality standards
4.1 ensure projects:
4.4.1 quality and varieties of steel must
comply with the design requirements and the provisions of the relevant
standards, imported steel chemical composition inspection must be conducted
before welding and welding test, accord with the relevant provisions of the
rear can welding.
Inspection method: inspect the factory
quality certificate and test report.
4.1.2 steel surface should be clean, with
granule or flake old rust, after descaling is pitting reinforcement, it is
forbidden to use according to the original specifications.
4. L. 3 steel butt welding or arc welding
welding joint, take the specimen by the regulation, its mechanical performance
test results must comply with the provisions of the specification rebar welding
and acceptance.
4.2 the basic items:
2 steel banding, button missing, string
does not exceed the number of bound of the number of 10%, and should not be
concentrated.
4.2.2 hook towards the right, should comply
with the binding joint construction of the norms, the lap length is not less
than the specified value.
Holdings by the level of Ⅰ stirrup of
cold drawn steel or low carbon steel wire production, its quantity, peace hook
Angle straight length, shall comply with the design requirements and
construction norms.
4.2.4 butt joint without the transverse
crack and burn, uniform package, welding joints bend is not greater than 4 °,
the axis displacement is not greater than 0.1 d, month. MRN no greater than 2.
Arc welding joint, the weld surface level off, without cave, no flash, no
cracks, porosity, slag inclusion and joint bite edge. Bending is not more than
4 °, joint steel axis displacement is not greater than 0.1 d, and no more than
3 mm. Weld thickness is not more than 0.05 d, not less than 0.1 d wide, length
is not less than 0.5 d.
4.3 allowable deviation project, are shown
in table 4 to 7.
Constructional column, ring beam and plate
steel binding allowable deviation table 4-7
Project item time allowable deviation test
method (mm)
1 frame width and height of the plus or
minus 5 'quantity check
2 the length of the skeleton plus or minus
10 feet quantity check
Spacing of plus or minus 10
Row spacing + / - 5
4 stirrup, tectonic spacing + 20 feet three
gears, take its maximum value
Displacement of the center line of the five
Level elevation difference + 3, 0
Force reinforced protective layer 6 + 5 'quantity
check
5 finished product protection
5.1 constructional column and ring beam
reinforcement, such as using precast frame, should be put in designated place
mat PingMa neatly.
5.2 to floor hang yun steel storage, clean
up good location, in order to avoid deformation.
5.3 shall not be trampled has tied a good
reinforcement and ring beam reinforcement shall not be beam bottom brick loose
touch.
6 should pay attention to quality problems
Deformation: 6.1 steel reinforcement
skeleton binding tie clasp method should be paid attention to, appropriate USES
button cross or set of binding.
6.2 stirrup spacing is not in conformity
with the requirement: more reinforcement for Rachel place brick wall caused by
touch to move, when should be build by laying bricks or stones after nap time
before closing.
6.3 improper floor end of reinforced
connection: should be in before floor lifting plate end exposed prestressed
concrete curved into 45 °, hoisting in place after the gatun long steel
binding. At the same time should pay attention to in the process of
installation of floor, must not be exposed tendon broken plate end.
6.4 balcony place reinforced crushed: the
balcony of ring beam as the "L" shape stirrup, must pay attention to
the protection of the hoisting, such as damaged, should be the balcony lift,
nap after reinforcement, then in the balcony.
Steel bar displacement 6.5 constructional
column: in addition to the constructional column out of reinforcement and ring
beam rebar tie, and stretch out tied to a location of stirrup reinforcement,
after pouring the concrete, shall be immediately repair.
6.6 plate seam tendons exposed:
longitudinal seam reinforcement should tie up mortar boards, transverse joints
to tie bar on the board end exposed tendon.
7 quality records
This technology standard should have the
following quality records:
7. L steel factory quality certificate or
test report.
7.2 steel mechanical performance test
report.
7.3 should be imported steel chemical
composition inspection report and solderability test report, in domestic steel
processing cell broken, bad welding performance and mechanical performance
significantly abnormal, should have a chemical composition inspection report.
7.4 steel component project quality
inspection assessment data.
7.5 item of reinforcement concealed
engineering acceptance records.