1 wall painting
Theft index: ★ ☆
Phenomenon: the latex paint is by far the most common type of wall decoration materials in concrete construction, you can brush, roller or spray. If workers in construction are not serious or half-hearted, regular small chromatic aberration. Especially the darker paint color can have this kind of problem.


Wall expert: emulsion paint before using it need to add some water, deployment of a good latex paint to run out at one time. Finished coat of paints of the same color are also the best. If the walls need mending after completion of construction, the entire wall paint it again.

2 water pipes
Theft index: ★ ★
Phenomenon: decoration, construction teams, sometimes in order to save time, contain large amounts of cement, sand and concrete fragments into the sewers.
Direct consequence of this is seriously clogged drain, resulting in kitchens and bathrooms because of poor water and running water. Although some projects at the time of final acceptance is no problem, but always problems with poor water.
Wall experts advise: the strict supervision of the construction team, can't get the sewers when the chute. Water after construction, all of the water basins, basins and bathtubs filled with water, then water, and see if the water is smooth, whether pipeline leakage problems.

3 wire connector
Theft index: ★ ★ ☆
: Electrical outlets, switches, and lights when it is installed, no wiring according to the construction. Especially in consumer use some larger power consumption appliances such as water heaters, air conditioners, causing switches, outlets, heating, and even burned, brought great losses to consumers.
Wall experts advise: in construction supervision for construction electricians strictly in accordance with the rules at all after the installation of switches, sockets, be sure to do the actual use, and see whether these sites have a fever
4 tiles paving
Theft index: ★ ★ ★
Phenomenon: paving tiles is a technical process. If workers Jerry and hollowing most prone to ceramic tile, to joint problems such as uneven, cements and adhesives for tiles paving has exquisite, if the ratio of unreasonable loss can also occur, and so on.
Wall expert: according to the Beijing municipal construction Committee announced the acceptance of household decoration engineering quality standards, requiring tile paving should be flat and solid, clear, no dirt and mortar scars, the surface color are basically the same, uniform joints, plates no cracks, corners and short ribs, empty drum shall not exceed the total number of local 5%.
5 wall tick Groove
Theft index: ★ ★ ★ ☆
Phenomenon: the buried pipeline must be slotted on walls and floors, pipelines can be buried. Few workers in the slot operation savage construction, not only damaging the building load-bearing structure, and may cause damage to other pipelines in the vicinity.
Wall experts advise: before the construction, and the construction team leader once again confirm the direction and position of the pipeline. For different wall structure, slotting requirements are not the same: bearing walls is not allowed within the housing slot, and wall with insulation behind the slot, it is easy to cause cracks in the surface, while on the ground slot, but be careful not to damage the floor and downstairs tenants cause problems.
6 joint modifier
Theft index: ★ ★ ★ ★
Phenomenon: in some of the walls and door, window and docking, and two different color paints docking place, is also where the workers are often perfunctory. You'll often see latex paint with wood mixed with each other, the joint problems.
Wall experts advise: is very important for treatment of joints, you must supervise workers seriously construction. If there are two colors of paint on the wall when you connect, during construction should be posted at the edge of the first color tape, and then painted a different color of paint on it, so the tear tape after the completion of construction, across the seams can be very neat.
7 wire pipe
Theft index: ★ ★ ★ ★ ☆
In the family decoration construction, almost all of the wires are put in PVC pipe, buried within the walls.
After the wire through PVC pipe, consumers don't see, and change more difficult. If the worker is not in operation earnest will lead wire kink in the tube, causing electricity problems. If the people who cut corners, will use the connector wires or several strands of wire wear in the same piece of PVC pipe.
Wall expert: consumer best buy wire, and then supervise the operation, after installation to power up test. In addition, consumers must make the decoration company left a "pipeline". When electrical wires buried in the walls, these walls will be part number and draw floor plans and then draw out the electric wiring and the specific location, indicating from the floor, off the ground and the adjacent wall surface orientation, in particular, shall indicate the joint position of the pipeline, so that if a failure occurs, can immediately find the location line.

8 small
Theft index: ★ ★ ★ ★ ☆
Phenomenon: the so-called "small" is some consumer eyes do not see, and less attention to small areas, such as along the door, below the sill plate, heating the inside of the hood, and other places, some workers will cut corners here, even without doing anything.
Wall experts caution: remember that any object is 6 planes, not to overlook any detail in the engineering quality inspection.

9 the ground leveling
Theft index: ★ ★ ★ ★ ★
Phenomenon: some houses of the ground is not flat enough, need to be leveled again in the decoration. If workers are careless or intentional sloppy, would result in "more find more inequality" problem, and cement mortar used in construction would greatly increase the ground load, pose hazards to building security.
Wall experts advise: before the ground leveling, you must first do the ground base treatment, and then leveling the ground with cement mortar. After the cement dry completely, with dedicated level to determine the smoothness of the ground, then proceed to the next step of construction.

10 bed treatment
Theft index: ★ ★ ★ ★ ★
: Before you paint with latex paint, paving tiles, be sure to do a base treatment. Some workers at the time of construction in this respect Jerry, light is that the wall is not flat, after a coat of latex paint color, paint color loss, or tiling is not in prison.
Wall experts advise: in the pavement construction of wall and floor tiles, you must pay attention to not directly covered in lime mortar for tiles, Lime plaster, Lime plaster, paper reinforcement Ma DAO lime slurry and emulsion paint on the surface, but grassroots clean can only be laid.