1 scope
This technology is applicable to rated load
5000kg and below rated speed 2m/s and the following types of Chinese-made
traction drive shaft of the elevator machinery and equipment installation
works.
2 construction preparation
2.1 devices, materials requirements:
2.1.1 specifications, quantities should be
consistent with the requirements of the various components without damage.
Factory certificate.
2.1.2 oil shock absorber piston rod surface
should be clean, no rust and dust cover are available.
2.1.3 the moving parts of the equipment and
activities should be flexible, functional and reliable.
2.1.4 compensation ropes should be clean,
no dead bent, no rust, no broken wires. Compensation chain should be put on
shock-proof nylon according to the requirements.
2.1.5 bolts, bolts and screws of the
connection of the other specifications, quality has to comply with the relevant
requirements. And is equipped with a variety of specifications of metal
gaskets.
2.2 the main tools:
Welding machines and welding tools,
adjustable wrench, tube wrench, hammer, ruler, horizontal ruler, steel ruler,
wire pendant.
2.3 operating conditions:
2.3.1 well within the requirement of
section III of chapter II.
2.3.2 installed and adjusted according to
the requirements of the Office, lock function must be safe and reliable.
3 operational processes
3.1 process:
Install buffer installed base → buffer → installed
with a layer of steel wheels, hanging steel →
→ Install speed limiter rope tensioning device, loading speed rope → install the
towline compensation device
3.2 installation the buffer chassis:
First check whether the buffer and buffer
base facilities, and test Assembly. No problem to buffer base installed on the
rail base. For elevator without a guide rail base, processing, increase the
loading guide rail base should be used. Such as the use of concrete base, you
must promise not to destroy the shaft end of the waterproof layer, avoiding
leakage troubles and measures to be taken, and integrated the concrete base and
the end of the shaft.
3.3 Installing the buffer:
3.3.1 Installing buffer coordinates and
vertical deviation, standard deviation indicators taking into account.
Determine the position buffer Centre: in
the car (or heavier) hit Center of the plate, move the buffer so that
Heart alignment to determine the location
of the buffer, the offset must not exceed 20mm (Figure 5-86).
3.3.2 the use of spirit level measuring
bumper top, its standard error is less than 4S/1000 (Figure 5-87). 3.3.3 where
the car (or heavy) when buffer consists of two set of two buffers on the top
should be in a horizontal plane, the difference should not be greater than 2mm
(Figure 5-88).
3.3.4 measurement of oil shock absorber
piston column verticality: the difference between the a and b shall not be
greater than 1mm, measurements should be carried out in a difference of 90 ° in
either direction (Figure 5-89).
3.3.5 in the buffer and buffer between the
base pads on the bottom metal plate, adjusting the buffer. Gasket the gasket
area shall not be less than the buffer area at the bottom of 1/2. Anchor bolts
to be tightened after adjustment, requirements-spring washers or with double
nut fastening. TURNBUCKLE to expose 3~5 buckles.
3.4 Installing under floor selector steel
wheels, hanging Strip
3.4.1 fixed bracket with round steel in the
car on the track, request steel wheel weight 450 ± 50mm lump from the pit below
the ground (Figure 5-90).
3.4.2 steel under axial position adjustment
method: car hanging from the center line of fixed steel pendant, adjust the
steel under axial position, so that the maximum error is 2mm (5-91).
Radial position adjustments: line
detection, steel-wheel on the edge should be in the same vertical line. Maximum
deviation is less than 3mm (5-92).
3.4.3 slowly to put steel shafts in the
engine room (pay attention to the Strip does not kink or bend), strip steel
pulleys and steel straps on the car after the card, then put the Strip on the
other side and the car fixed is fixed. Steel fixed should be fixed on the
bottom rail of steel pulley bracket upward tilt, tilt bracket not more than
50mm (5-90).
3.5 installing the speed rope tensioning
device and speed rope:
3.5.1 Installing speed limiting rope
tensioning device at the bottom of distance from the pit at ground level can be
determined according to table 5-13.
Tensioning device from the pit at the
bottom horizontal distance between tables 5-13
From the pit size (mm) of 750 ± 50 550 ± 50
400 ± 50
3.5.2 according to table 5-12 and tensioner
installation dimensions be superior. By car van lever Xia rope end Center to
its corresponds to of Zhang tight round rope slot Center points a, hanging a
vertical a, (see Figure 5-93) (room limited speed device to car van lever Shang
rope end Center points of vertical degrees Board set, has Yu limited speed
device installation Shi completed), while by limited speed device rope slot
Center to Zhang tight round another end rope slot Center b hanging vertical b,
adjustment Zhang tight round location, makes vertical a, with corresponds to
Center points a, errors is less than 5mm, makes vertical b with corresponds to
Center points b errors is less than 15mm, is Zhang tight device location
determine.
3.5.3 direct speed speed rope hanging in
the round and measured on the tension pulley, depending on the desired length
of rope, rope end. Make rope end rope rope end with the Lord, then the rope end
with car lever plate (Figure 5-93).
3.6 Installing the towline compensation device:
3.6.1 if the compensation to balance the
chain, the installation should be natural in the shaft before hanging it up
after installation. Its method, see 5-94.
3.6.2 If the elevator rope with
compensation to compensation, except according to the construction plan, but
also took note of the dancer's Guide and the compensation gap between wheel and
rail 1~2mm (Figure 5-95).
4 quality requirements
4.1 project:
4.1.1 speed rope tensioners and steel belt
tensioning device safety switches, compensation device guides upper and lower
limit switch fixing must be reliable.
Inspection method: Visual check.
4.1.2 above safety switch and mounting
position limit switches must be correctly in order to ensure a reliable switch
in the following action, and make the elevator stops immediately;
4.1.2.1 and layer steel belt is broken
loose causing the tensioning wheel drop is greater than 50mm;
4.1.2.2 speed rope tensioning devices, fall
is greater than 50mm and (3) dancer in an abnormal position.
Inspection method: practical check and
simulation.
4.1.3 safety switch, limit switch in its
action, cannot result in its damage or contact Earth, short circuit, and so on.
Inspection method: simulation operation and
inspection.
4.1.4 compensation ropes (chains), speed
rope and steel band in running it is strictly prohibited to collide with any
parts or friction.
4.2 Basic project:
Speed rope tensioner, belt tensioning
devices shall have sufficient weight to ensure wire rope or steel straightening
to prevent misoperation. Speed limit rope weight tensioning device should not
be less than 30kg. Weight of the steel belt tensioning device and set as steel,
steel with straight (not too heavy, in case of damaged steel band).
4.3 allowable deviation:
Bumper installation tolerances are shown in
table 5-14.
Bumper installation tolerances in table
5-14
Allowable deviation or size requirements
(mm)
Center distance of 1 buffer car (or heavy)
touch the center of the plate less than 20 hanging wire, standard checking
Top 22 buffer (when complete) should be in
the same
Less than 2 feet above the water level
check
3 top level of 4S/1000 feet of buffer check
4 shock absorber piston 1 vertical column
(testing the difference between points a and b) hanging, standard checking
Note: 1.
2. s as shown in Figure 5-87.
A and b as shown in Figure 5-89.
5 finished product protection
5.1 to prevent debris from falling into the
shaft, so as not to hurt the installed parts.
5.2 in the case compensated devices wheels
and hydraulic buffers have reliable dust control measures, so as not to affect
its function.
6 quality problems to be noticed
6.1 playing bumper base with concrete
composition and the quality of the cement should comply with the design
requirements.
6.2 the rope for velocity limiter switch,
steel tensioning device belt switch, reliable compensator for positioning the
function of the switch.
6.3 speed rope to no broken wires, rust,
dirt or bending.
6.4 cannot fold track and corrosion of
steel.
6.5 compensation links must not have welding
the phenomenon. Compensation rope no broken wires, corrosion and so on.
6.6 oil buffer before use be sure to refuel
as required, to ensure that they are reliable.