The use of geothermal heating, compared with the traditional heating method, the geothermal heating to cancel the heating pipes and radiators in the room, easier to place the room layout and beauty, while geothermal heating is more scientific and energy saving than heating. But the geothermal heating on the floor of the pavement has a certain technical requirements, the treatment will affect the use of geothermal floor effect, so the following four points need attention.

1. Solid wood flooring is better suited than geothermal heating than solid wood flooring? Industry experts believe that this formulation is not accurate. All the products that meet the national standard of the regular manufacturers, especially the well-known brands on the market selling the floor, including reinforced flooring can be suitable for geothermal heating installation requirements.
2. In the geothermal heating mode of practical application and installation process, the most critical part is not the choice of the floor, but the installation of the ground before the treatment, the ground treatment will be geothermal heating system after the normal use of decisive effect. Before the installation of the floor, the ground handling, should be strictly in accordance with the European DIN4386 and national standards to control the ground before they can be installed in the floor when the geothermal installation, we must strictly enforce the European DIN18305 standard in order to ensure that the geothermal heating system In the future use of the normal operation.
3. Geothermal heating The correct installation is in the floor and the ground to add a layer of mats, this layer of mat is best to import professional paper mats, because the import of professional paper mats with thermal fast, no deformation, etc. Features. Foam material mats in the geothermal heating system when heated, will produce harmful gases, the health of consumers have a negative impact.
4. Taking into account any floor with thermal deformation of the defects in the second year when consumers use geothermal heating system, we must strictly in accordance with the provisions of the heating process step by step, never one step in place, such as the first day only to 18 Degrees Celsius, 25 degrees Celsius the next day, 36 degrees Celsius on the third day. Strengthen the floor for the water pipe temperature does not exceed 45 degrees Celsius, the floor surface temperature can not exceed 30 degrees Celsius. If you exceed this temperature, it will affect the life of the floor and the use of life.
For the above reasons, the installation of geothermal flooring requires a very high level of technology. It is understood that, in order to properly install the geothermal floor, the famous flooring brand Europe has been specially sent engineers to Germany to receive rigorous professional training, and twice a year invited German experts to install technical training throughout China. The installation process in strict accordance with the national standard of the European DIN18305 standard and DIN4386 standards, and the establishment of 48 hours in advance delivery system, pre-installed pre-inspection system, limited time limit work method to ensure the quality of the installation of the enterprise system, so the European Code has The completion of all the geothermal heating works of the floor installation, there is no case of quality accidents, by the user's praise.
First, the installation of ground handling to be meticulous
The ground in the range of two meters for the radius must be level, the height difference of not more than 3mm. The ground should be completely dry, before laying the floor, must be geothermal heating test, the water temperature of at least 50 ℃, to ensure that the heating system is running normally. And to keep heat for more than 24 hours, so that the ground dry, to ensure that the water content meet the standard.
Second, the installation process details of the most important, order to pay attention
The best use of floating installation, the floor through the cushion material close to the ground, between the floor and the surface there is no gap between the floor and the need to set aside greater shrinkage gap. Due to the release of water and heat radiation tidal volume, so moisture to work hard.
Pavement first to clean up the ground, pay attention to the corner clean up straight, to ensure that enough to allow enough expansion joints. The second step in the ground layer of plastic sheeting to isolate the moisture, let the plastic cloth in the four corners were higher than the ground 10cm. The third step to lay the mats. Note that to leave the expansion joints, the interface at least overlap 5cm, and must be sealed with a good tape. Use skirting boards that are thicker than ordinary floors and need to be built independently. After 24 hours of installation, the floor can be heated. In order to facilitate the heat, the cushion material should not be too thick.





In addition, the use of geothermal floor special glue; can not shop pads; can not play keel, because this gap will leave the air, air thermal conductivity is low, is not conducive to heat transfer.
Third, to use special paper mats
Floor and floor between the mat can not use ordinary foam mats, be sure to use geothermal paper mats, because this mat heat conduction, no deformation. Ordinary foam mat heat slowly, long-term high temperature conditions, easy to produce harmful gases, endangering the health of users.

Fourth, the construction surface temperature can not be too high
Whether it is hydrothermal radiant heating or cable heating heating system, do not live on the ground floor furnace, electric furnace, etc., because the surface temperature is too high, then the ground under the aluminum-plastic composite pipe may melt.
Geothermal flooring Due to the specificity of its function and the complexity of geothermal system, compared with ordinary flooring, geothermal floor maintenance and maintenance has its own unique, in the heating and moisturizing to pay special attention.