Monday, February 13, 2017

Carpet laying process

Carpet laying process

Laying the way.
The carpet has two forms of carpet and carpet, using different laying and laying.

Activity Laying:
Is to put the carpet floating floating on the grassroots level, without the carpet and the base fixed.

Fixed laying:
Fixed laying there are two fixed methods, one is the card-type fixed, the use of barbed wire pulled the carpet;

One is the adhesive method is fixed, the use of adhesive to the carpet paste on the floor.

The basic craft of carpet floor decoration.
(1) Cassette type:

Base cleaning → carpet cutting → barbed bar → bedding layer → seam → Zhang Ping → fixed carpet → edge → repair carpet surface cleaning.

(2) Paste method Fixed way:

Grass-roots surface treatment → real pay-off → cutting carpet → scraping gas hanging → laying silver pressure → clean, protection.

Construction points

In the pavement must be real before the measurement of the corners of the corners, accurate records of the angle of the angle. According to the calculation of the size of the fabric in the back of the carpet line, cutting.

Barbed plate fixed laying along the wall nail barbed bar, barbed board from the skirting board 8 mm.

Seam at the application of tape on the back of the carpet will be two carpets together, the first seams at the beginning of the repair of the hair, and repeatedly rub the joints at the hair, to the surface can not see the traces of the seams.

Adhesive laying after scraping gum after 5 to 10 minutes, until the glue becomes dry when the laying.

After the carpet laying, with the pillow needle pull, Zhang Ping, hanging on the barbed board. With the glue paste, the carpet paved with a felt roll out of the bubble.

The extra carpet side cut, clean out the fiber.

Cut the carpet should be cut along the carpet warp, only cut off the weft, not cut warp, for the backing of the carpet, should be separated from the front of the villi, find the warp, weft after cutting.
Precautions

Pay attention to finished product protection, with adhesive paste the carpet, 24 hours without permission to stampede.
Carpet pavement on the ground floor of the higher requirements, the ground must be flat, clean, moisture content of not more than 8%, and has installed skirting board, skirting board to the ground clearance should be larger than the carpet thickness of 2 to 3 mm.
Accurately measure the size of the room and calculate the size of the material to avoid waste.
After the laying of the carpet must be tightened, Zhang Ping, fixed, to prevent future deformation.