Kitchen equipment installation and acceptance

1. Install the kitchen equipment
Installation of household kitchenware is a highly professional project, its standard installation procedures: wall, ground primary processing → installation of product testing → installation of the cabinet → installation of base cabinet → connected to the debugging, drainage → installation supporting electrical → test adjustment → Clean up.
Depending on the design of the kitchen appliance, the complexity of the project varies, and the content of the program may vary.

2. Kitchen equipment before the installation of the test

In order to ensure the safe and convenient use of the kitchenware after installation, the kitchenware should be inspected, tested and the following requirements before installation: 2 Artificial board finishes are not allowed to have bubbling, cracking, pollution, snowflakes, obvious scratches , Uneven color and other defects, plates, parts of the hole, hole center position relative to the baseline margin size deviation of not more than 0.3 mm F drawers and cabinets into the depth should match the slide to install a solid, uniform size, The edge of glass doors should be edge treatment; screw to screw flat, solid, not a partial crooked, outcrop, slide button phenomenon? Glass door around the edge by grinding, the glass thickness of not less than 5 mm thick thin Uniform, and the cabinet connected firmly; accessories installed complete, tight, correct, solid, no collapse at the junction of the crop, loose, through nails, inverted nails, bending nails, floating nails, no small pieces of missing pieces; Beads and other accessories to install a firm opening and closing, the use of flexible; doors and cabinets consistent with the gap, adjacent to the same height of the door.
3. Construction of kitchen equipment installation specifications
The installation of the wall cabinet should be based on different wall with different fixed methods, the length of the back panel hanging board should be deducted from the length of 100 mm, hanging lining board length of 500 mm within the use of two reinforcement nails, 800 mm The use of three reinforcement nails, reinforcement nail length of not less than 50 mm, the installation should first adjust the level of the cabinet, and then adjust the hinge to ensure that the door horizontal and vertical; hanging cabinet height should be hanging cabinet floor more than 500mm above the ground , The top should be added decorative line board, should ensure that the decorative line board and the cabinet, the vertical level of the door, the two groups linked to the hanging cabinet, should be removed screw closure, connected with wood screws, and ensure that two hanging cabinet Straight, uniform door cracks.
Bottom cabinet should be installed to adjust the level of the knob to ensure that the countertops, the front face are in a horizontal plane, the two cabinets to connect the use of wood screws, back plate through the pipeline, tables, valves, etc. should be punched in the backplane punching, Hiding the equipment, the hole side shall not appear jagged.
Installation of the bottom of the bottom of the washing bed to add plastic round pad, the water pipe connection should ensure that no water leakage, no water seepage, shall not use all kinds of adhesive connection interface part.
Installation of stainless steel sink, according to the size of the sink slot on the table in the size of the slot, sink and table board connection with the use of a good hanging screw clamping leveling, sealing sealing plastic edge to ensure that the sink and the table connection gap Uniform, non-seepage.
Installation of faucets, can be directly in the stainless steel plate punching, but also in other table holes. Requiring a solid installation, Sheung Shui connection can not appear water seepage.
Range hood installed according to the manufacturer of the range hood instructions, attention to the cabinet and the hood with the size of the range hood, should be coordinated.
Install the stove, should pay attention to select the correct stove according to the gas species, when installing a tight air hose hose clamp, no leakage phenomenon, after installation with soap foam test whether the installation intact.
4. Acceptance of kitchen equipment installation
Kitchen equipment installation with the grass-roots level of the connection must comply with relevant national standards. Kitchen and grass-roots wall connection firm, no loose, forward, and other obvious quality defects, the counter countertops flat, the overall table flatness error of less than 0.5 mm. The water connection is tight, no water leakage, water seepage phenomenon, the supporting equipment (such as stove, range hood, vegetable slot, etc.) size and close the sealed plastic closure, no plastic seal on the plastic mark. The gas pipeline is tightly connected with no air leakage. Cooker in line with the gas species, flexible and effective switch, the overall kitchen appliances installed close to the primary wall, a variety of pipeline and testing port reserved position is correct, the gap is less than 3 mm. Kitchenware as a whole clean, pollution-free, table, doors meet the design requirements. Accessories should be complete and securely installed.
5. Kitchen equipment installation common quality problems and treatment methods
Kitchen equipment installation is the main quality defects with the grassroots connection is not strong, uneven installation of the kitchen and the gap with the pipeline junction is too large and so on.
(1) with the grass-roots connection is not strong: mainly due to improper choice of connecting parts, if the grass is a wood and gypsum board, wood screws should be selected for the connector, such as the substrate for the cement, the application of expansion bolts or plastic bulge, Primer for the brick wall, you should use plastic bulging or embedded wood bricks.
(2) kitchen installation is not smooth: In addition to grass-roots ground uneven, the main kitchen is not adjusted at the bottom of the knob. Therefore, kitchenware should be installed in the kitchen after the completion of the ground pavement, installation, should first adjust the knob to ensure that the level of the cabinet can be fixed.
(3) with the pipeline seams is too large: the main reason is not allowed due to the measurement of the installation. Installation, the first measurement of good size in the cabinet after the bomb line, and then verify the size and location, accurate cutting can be cut.
6. Estimation of construction period for kitchen equipment installation
In the basic renovation completed on the basis of the installation of kitchenware is a very short duration of the project, three workers work together to install about 3 meters per day (usually kitchenware installation for the extension of about 3 meters), including the installation of kitchenware, Electricity, gas pipeline.