Hollow reinforced gypsum board partition wall construction
1 scope
The technology standard is applicable to residential engineering and similar general civil building with hollow bar of gypsum board partition project. Does not apply to such as kitchen, toilet humidity larger room.
2 construction preparation
2.1 materials and tools:
Article 2.1.1 reinforced gypsum hollow board: enhance gypsum hollow bar has a standard plate, door plate, frame plate, door window upper plate, the upper and the lower window and special-shaped plate. Standard plate used for general partition. Other board according to the engineering design specifications for processing.
2.1.1.1 specifications: enhancement of the specifications of the gypsum hollow bar according to the plate and the public building in the average house with plate.
Average house with plate specifications for:
Length (L) 2400 ~ 3000 mm
Width (B) 590 ~ 595 mm
(H) 60, 90 mm thick
Public building plate specifications for:
Length (L) 2400 ~ 3900 mm
Width (B) 590 ~ 590 mm
(H) 90 mm thick
2.1.1.2 technical requirements: 55 kg/m2 or less surface density
Bending load acuity 1.8 G (G as the plate, the weight of the unit N)
Single point hanging force 800 n or more
Slurry MPa or higher compressive strength
2.1.2 adhesive: SG791 construction adhesive, based on vinyl acetate monomer polymer background material, and made from other materials, is a colorless transparent insulated liquid. This adhesive solution and building gypsum powder made adhesives, bonding article is suitable for the gypsum board, gypsum plate and brick walls, concrete wall binding. Gypsum and gypsum binder pressure shear strength is not lower than 2.5 MPa.
Also available similar special gypsum adhesive, but should be confirmed by the test reliable, can use.
2.1.3 building gypsum powder: should comply with the standard level 3 above.
Article 2.1.4 fiberglass cloth: 50 mm wide, used to deal with the joints; Article 200 mm wide, additional layer can be used for wall corner. Plastic coated in the alkali glass fiber grid cloth.
Grid 8 orders/in
> 80 g/m2
Breaking strength: 25 mm x 100 mm strip warp or 300 n
Weft acuity 150 n
2.1.5 gypsum putty: > 2.0 MPa compressive strength; Flexural strength > l. 0 mpa. Bond strength > 0. 2 mpa. The final setting time is 3 h.
2.1.6 tools: broom, carpenter handsaw, wire brush, gray slot and 2 m on foot. Operation, 2 m line board, special skiing root, ruler, rubber hammer, wedge, nail gun with flat, drill, etc.
2.2 operation conditions:
2.2.1 roofing waterproof layer and structure construction and acceptance of completed respectively, metope pop-up + 50 cm elevation lines.
2.2.2 site operation environment temperature is not lower than 5 ℃.
2.2.3 officially before installation, try to install mold wall, identified qualified before installation.
3 the construction technology
3.1 process:
The structure of metope, end face,
The ground clean and leveling
left
Pay-off, step
left
Distribution board, repair
left
Ann u-shaped card (with seismic requirements)
left
Dispensing adhesive laying wire tube, stable connection
Box, installation of pipe clamp, and built-in


left
Installation partition panel please
left
Ann door window frame
left
Plate joint processing
left
The plate is decorated

3.2 cleaning clapboard and the integration of a top surface, ground, metope, all out of metope mortar, concrete block and so on must remove and sweep, try our best to make level units.
3.3 the feeding, step; On the ground, metope and end face according to the designed position, play good partition door humanly scaled the line edges, and press plate fixed step.
3.4 with plate, repair: plate length should be according to the size of junction structure layer clear height of minus 20 ~ 30 mm. Calculate and measure the upper Windows and doors hole and a baffle plate at the bottom of the window size, and according to the size of the plate. When the plate width and the length of the partition does not adapt, should be part of the partition board splicing widened sawing (or narrow) in advance into the appropriate width, and placed in the shade. The defective board should be repaired.
3.5 the seismic requirements, should according to the design requirements with u-shaped plate fixed bar at the top of the card. At the top of the two pieces of bar flat-fell seam between the u-shaped steel card with nail fixed on the beam or plate, with Ann plate with fixed u-shaped steel plate.
3.6 dispensing adhesive: SG791 glue mixture cement and building gypsum powder, gypsum powder: SG791 = 1:0.6 ~ 0.7 (weight ratio). The preparation of the adhesive amount to a less than 20 min it is advisable to use time. Preparation of adhesive for more than 30 min solidification, shall not be used to add water to add glue to modulation, to avoid the plate seam cracks due to glue rickety.
3.7 installation partition wall board, partition panel installation order should be started, and the junction of the wall or door edge in order to install. Board side flush float ash, in metope, end face, the top surface of plate and the side split surface (phase) brush SG791 first adhesive solution, to full blown SG791 cement, according to the elastic line position in place, at the bottom of the plate with a wooden wedge, reoccupy hand horizontal pushing plate, the plate seam risked pulp, a person with special pry up the bottom of the plate, the other people dozen chock, make the partition board clamping should be solid, and then use adhesive (putty knife) will squeeze operation leveling. According to the above operation way to install the partition board in turn.
When installing a partition wall board, it is important to note that the plate alignment play good positioning line on the roof and floor in advance, and during the installation process at any time with 2 m by feet and feeler flatness of metope, in 2 m line plate inspection of verticality.
Binding end wall, should be within 24 h after using C20 harsh will be under the plate mouth of fine stone concrete wall, when the strength of concrete reaches more than 10 mpa, removed plate under chock, with the same intensity of harsh mortar pouring.
3.8 laying wire tube, unsteady junction box: according to the electrical installation drawing for position row positioning line, pipe laying wire, junction box.
All wire and tube must be suitable gypsum board hole laid, it is forbidden to horizontal and inclined shop.
Junction box, first in the borehole reaming (prevent slam), reoccupy reaming with flat, hole size moderate, founder. Hole is clean, brush SG791 first adhesive solution, reoccupy SG791 cement stabilize junction box.
3.9 Ann plumbing, gas piping card: according to the plumbing, gas piping installation drawing for level and vertical position, draw pipe clamp positioning line, hole reaming on clapboard (stuck between ban chisel), the hole is clean, brush SG791 first adhesive solution, reoccupy SG791 cement pipe clamp.
3.10 installation hanging up:
3.10.1 cupboard, the equipment can be mounted to the partition board and decorations, each piece of board can be set up two lifting point, each hoisting trolley is not more than 80 kg.
3.10.2 first hole reaming on clapboard (prevent slam), hole should be clean, brush SG791 first adhesive solution, reoccupy SG791 cement fixed up, stay in and then hang equipments.
3.11 Ann door window frame: general use for Windows and doors hole, after the Ann method of door window frame. Steel door and window must with embedded parts of door window plate welding. Wooden door window frame with l-shaped fittings connection, with wood screw connected with wooden frame, the other end plate embedded parts in the welding and door window. Gap between door frame and door window panels should not be more than 3 mm, more than 3 mm should it gasket transition. Will crack float ash clean, first brush SG791 adhesive solution, reoccupy SG791 cement sealing. Sealing is tight, in order to prevent collisions doors when they switch cracks.
3.12 plate joint processing: 10 d after installed clapboard, check whether all gap binder is good, the presence of cracks, such as cracks, should be repaired after find out the reason. Has good bonding of all joints, Yin Angle seam, to clean float ash, brush again SG791 liquid cement paste 50 mm wide glass fiber mesh belt, the Angle of partition wall in the Yang Angle paste 200 mm wide (100 mm wide on each side) a layer of glass fiber cloth. After dry scraping SG791 cement, slightly below the surface.
3.13 decorate panel:
3.13.1 general bedroom metope, with gypsum putty leveling directly, after polishing putty scraping second course (to choose different intensity of be bored with child according to request of veneer), sand again, finally do act the role of the surface.
3.13.2 partition that play a base, the general board should first brush a glue solution in the root, do concrete, terrazzo kick; Such as plastic, wood and kicking, don't brush glue solution, drill into the first chock, reoccupy nailing on the partition board.
3.13.3 metope ceramic tile should be the board face before sand, to strengthen bonding, brush SG791 glue (SG791 glue: water = 1:1) a, reoccupy SG8407 plastic adjustable cement ceramic tile adhesive (or similar) stickup ceramic tile.
3.13.4 such as local cracked panel, should first before making a spray processing, to make the next working procedure.
4 quality standards
4.1 ensure projects:
4.4.1 reinforced gypsum hollow plate of various technical indicators must meet the requirements stipulated in the relevant standards.
The quality of the preparation of the adhesive materials must conform to the rules.
Inspection method: inspect the product certification.
Article 4.1.2 reinforced gypsum hollow plate four sides adhesive must be strong.
The method of examination: hand vibration and observation.
4. L. 3 hang up point must be strong, every project need to be hanging force test, test records should be as technical data archive.
Inspection method: inspect hanging force test records.
4.2 the basic items:
2 node structure, component location, connecting anchoring method, all should comply with the design requirements.
Inspection method: to observe the examination.
4.2.2 clapboard bond should be strong, all the joint should be fill close-grained, should not appear dry crack.
Inspection method: to observe the examination.
Holdings from door to door window frame window plate connection with welding, weld length should be greater than or equal to 10 mm, weld thickness should not be less than 4 mm. Weld surface level off, without burns, sag, flash, crack, bitten, porosity and slag, such as defects, the surface of the solder joints should be concave panel 3 mm.
Inspection method: to observe the examination.
4.2.4 glass fiber grid cloth should be centered along the plate seam pressure stick close together, there should be no fold. Become warped edge, the leakage phenomenon.
Inspection method: to observe the examination.
4.3 allowable deviation projects:
Enhance gypsum hollow partition board installation deviation should be allowed to meet the provisions of the table 9 to 15.
Installed clapboard allowable deviation table 9 to 15
Will project allow deviation (mm) check method
1 surface is flat and level 3 in 2 m by feet and wedge feeler check
2 facade vertical 3 in 2 m line board check
3 joint elevation difference 2 with straightedge and wedge feeler check
Use the 200 mm square chi, Yin and Yang Angle founder 4 and wedge 'inspection

5 finished product protection
5.1 the construction of each major type of work should be closely, reasonable arrangement of working procedure, it is forbidden to reverse process operation. Partition panel bonding within 12 h after tapping, avoid collision shall not to carry on the construction of next working procedure.
Up 5.2 installation, appropriate USES electric drill hole reaming, enlarge square hole with flat shovel, not for hitting a partition. In blow be bored with child after partition, should not be any picks his chisel.
5.3 on the ground, construction floor should prevent mortar spatter partition panel.
5.4 keep a transport car collision, such as partition panel and door.
6 should pay attention to quality problems
Article 6.1 enhance gypsum hollow plate must be drying has been basically completed contraction deformation of products. Shall not be used without drying of wet plate, to prevent the cracks and deformation.
Article 6.2 attention to enhance gypsum hollow board of transportation and storage. During transit to should take put down gently, side lift side and tied up with each other, not flat flat. Stacking place should level off, the mat (100 mm x 100 mm. Board should stand sideways, pad (50 cm away from the plate end. To prevent deformation of clapboard be affected with damp be affected with damp, when deposited in the open air to have rain.
Board if you have too much obvious deformation, unable to repair the hole, fracture or serious cracks and damaged, shall not be used.
6.3 all kinds of materials should be classified depositing, and listed on the label material name, specification, do not use the wrong. Plastic, powder, material should be stored in dry place, do not be affected with damp be affected with damp.
6.4 currently used adhesive should be poly vinyl acetate adhesive, 107 shall be used for rubber adhesive.
7 quality records
This technology standard should have the following quality records:
Article 7.1 enhance gypsum hollow plate quality certificate.
7.2 glass fiber grid with quality certificate.
7.3 adhesive quality certificate.
7.4 partition wall component project quality inspection records.
7.5 partition panel hanging force test records.

No comments: