A, first clean the surface before installation, surface smooth and clean.


Second, keel must use wood drying, moisture content is below 17%, keel must after construction planing, with unified keel horizontal height, or because of the action of pressure in the future, will produce free crack between floors.
Three, such as wet ground environment, want to undertake moistureproof processing, coating a layer of moistureproof protect the paint on the back of the floor at the same time, in particular, and into the kitchen and toilet of the back side of the floor to paint protection and moisture partition processing. New housing on the ground to isolate moistureproof moisture-proof coatings.
Four, avoid is used a fixed keel, cement in order to avoid deformation of floor be affected with damp be affected with damp, if already mudding solid water, can be used to paint keel closed form.
Fifth, the construction floor transverse on metope must leave 1 cm space advisable, to take advantage of the climate change caused by the floor scale.
Six, the interface of floor and the floor can not use glue, must use the floor from open a nail 45 degrees on the keel.
Seven, floor assembled finished, must immediately with cementing primer is again in the day, such as put on hold for too long, not easy be affected with damp be affected with damp or dry paint floor, once also difficult to clean up pollution.
Eight, near the window, close the balcony is not allowed to make a strong sunshine insolate, avoid floor due to exposure to change.