(A) veneer class decoration basic process

1. Paste glazed tiles:

Grass cleaning → wiping the bottom ash → election brick → soaking → row of brick → → → paste the standard point → paste the tiles → hook → scratches → clean up.


2. Paste ceramic tiles:

Clean up the grass-roots → wipe the base ash → gravel → line → paste → debarking → scratch.

3. Construction points

Grass-roots treatment, should be all clean up all kinds of dirt on the wall, and water wet one day in advance. Concrete walls should be chiseled in addition to the convex part of the grass will be chiseled, clean floating ash. Or with 107 plastic cement mortar nap. Wipe the ground ash, the bottom 6 to 7 into the dry, the row of brick line.
Formal paste must be pasted before the standard point to control the smooth surface of the paste, the operation should be used at any time with the ruler to check the flatness, uneven, not straight, to remove the heavy sticky.
Tile paste must be soaked in water for more than two hours before the brick body is not bubbling prevail, remove the dry stand.
Pavement encountered pipeline, lamp switch, bathroom equipment, such as support, etc., must be used to match the whole brick sets.
Inlaid finish, wipe the surface with cotton wire, and then wipe with white water mud.
4. Precautions

1. Grassroots must be clean, no floating soil, floating ash. The old wall should clean the surface of the original mortar.
2. The tiles must be soaked and dried. Because the drying plate paving, the mortar water will soon be sucked plate, resulting in cement mortar dehydration, affecting its condensation